B08 Attachment 0016 - PWS Annex A Maintenance PRS 20240301.pdf
PDF 149 KB Posted
- Attached to
- EAGLE Fort Cavazos, TX W519TC-23-R-0102
- Solicitation number
- W519TC23R0102
About this file
This document is a Performance Work Statement (PWS) that outlines the requirements for maintenance, supply, and transportation services at Fort Cavazos, TX. The PWS covers a range of tasks, including equipment repair, technical inspections, materiel maintenance, production control, food service equipment maintenance, and related services.
The key objectives include establishing and managing equipment repair shops, performing technical inspections, conducting repairs per applicable technical manuals and standards, meeting performance metrics for timeliness and quality, and providing support services such as wheel alignment, glass repair, and small arms repair parts management. The PWS specifies sampling methods, lot sizes, and acceptable quality levels (AQLs) for evaluating the contractor's performance on these tasks. This PWS is associated with Solicitation Number W519TC-23-R-0102 issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal for maintenance, supply, and transportation services at Fort Cavazos, TX.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)
MATERIEL MAINTENANCE – GENERAL
5.1.1 Establish, operate, and manage equipment repair shops, and supporting functions.
Quality: Lateral transfers processed IAW local directives, AR 710-2, DA PAM 710-2-1 and ISM Operating Manual.
Random sampling (shop/activity scheduled periodically)
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
5.1.4 Perform technical inspections in accordance with the maintenance request.
Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work orders, files, logs, and SOPs at time of surveillance.
AQL: 95%
MATERIEL MAINTENANCE – PROGRAMS/EFFORTS
5.2.1 Perform repairs IAW work request and applicable equipment TMs or equivalent publications.
Quality: Repairs will be IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment Technical Manuals (TMs), Technical Bulletins (TBs), Modification Work Orders (MWOs), Safety of Use Messages (SOUMs), Special Technical Inspection and Repairs (STIRs), other applicable Government technical publications, or OEM equivalent publications when a Government technical publication is not available.
Random sampling
Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 95%
5.2.1 Ensure minimum rejection rates for mechanical and electrical repair work completed are met in order to meet first time pass rates.
Quality: IAW AR 750-1, Technical Manuals, and other applicable regulations.
Random (shop/activity scheduled periodically)
Lot: Equipment that has completed the repair cycle and has been deemed as ready for issue (RFI) back to the customer.
AQL: 97% for mechanical AQL: 98% for electrical
MATERIEL MAINTENANCE SUPPORT
5.3.2 Meet performance metrics found in AR 750-1 for base operations metrics.
Timeliness: Tasks completed within time allowed by the specific equipment publication or within times estimated at work induction or other program standard as designated by Chief, Materiel Maintenance/COR.
Quality: Perform maintenance IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment TMs, TBs, MWOs, SOUMs, STIRs, other applicable government technical publications, or OEM equivalent publications when a government technical publication is not available.
Lot: Tactical work orders completed to TAT standards.
AQL: 100%
Lot: Manpower utilization rate.
AQL: Greater than or equal to 85%.
5.3.8 Maintain, repair, and replace tires on rims.
Quality: IAW TM 9-2610-200-14
Random (shop/activity scheduled periodically)
Lot: The number of line items on receipts processed on the day of surveillance.
AQL: 95%
5.3.9 Provide wheel alignment support.
Quality: IAW applicable TMs and standards.
Random (shop/activity scheduled periodically)
Lot: All in process and completed work related to replacing front axle components (tie-rod/sway bar).
AQL: 95%
5.3.10 Perform glass repairs for vehicles.
Quality: Glass shall be installed to original design configurations with seals that are air and watertight.
Random (shop/activity scheduled periodically)
Lot: All in process and completed glass repair work as well as all existing logs and files at time of surveillance.
AQL: 95%
5.3.11 Perform maintenance and services of sensitive items.
Quality: IAW ASC Supplement 750-1 and AR 750-1.
Monthly
Lot: All parts/items in process
AQL: 100%
5.3.11 Maintain physical security of the Material Maintenance Arms room and sensitive items.
Timeliness: Notify the COR immediately of the discovery of a missing sensitive item or major administrative discrepancy.
Quality: IAW AR 190-11, AR 710-2, AR 750-1, DA PAM 750-8, and local SOPs.
Random (shop/activity scheduled periodically)
Lot: All in process and completed sensitive item work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 100%
5.3.12 Management of Small Arms Repair Parts (SARP).
Quality: IAW ASC Supplement 750-1
Monthly
Lot: All parts in process
AQL: 100%
ALLIED TRADES
5.4.1 Perform welding, and Non-destructive testing as required.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work performed IAW work request and applicable military and industry standards. Welding performed by AWS certified welders;
NDI performed by ANSI/ASNT CP-189 certified persons.
Random (shop/activity scheduled periodically)
Lot: All in process and completed welding, as well as all existing logs and files at time of surveillance.
AQL: 95%
5.4.2 Perform metal machining, and fabrication operations and Non-destructive testing as required.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work performed IAW work request and applicable military and industry standards. NDI performed by ANSI/ASNT CP-189 certified persons.
Random (shop/activity scheduled periodically)
Lot: All in process and completed metal machining and fabrication work as well as all existing logs and files at time of surveillance.
AQL: 95%
5.4.3 Prepare and paint supported equipment and components as required to perform materiel maintenance.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work completed IAW AR 750- 1, applicable equipment TM 43-0139, TB 43-0209 and industry standard.
Random (shop/activity scheduled periodically)
Lot: All in process and completed body shop work as well as all existing logs and files at time of surveillance.
5.4.3.1 Operate and maintain Materiel Maintenance paint booths and breathing air machines.
Quality: IAW OSHA 29 CFR 1910-107, AR 200-1
Periodic
Lot: All materiel maintenance paint booths and breathing air machines at time of surveillance.
AQL: 100%
5.4.4 Perform body repair services.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work completed IAW AR 750- 1, applicable equipment TM, and industry standard.
Random (shop/activity scheduled periodically)
Lot: All in process and completed body shop work as well as all existing logs and files at time of surveillance.
5.4.5 Perform carpentry tasks required for the repair or modification of any Government owned, tactical or commercial equipment and customer requested fabrication.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: Work completed IAW customer request, applicable equipment TM, military, and industry standard.
Random (shop/activity scheduled periodically)
Lot: All in process and completed carpentry work as well as all existing logs and files at time of surveillance.
REPAIR PARTS AND MATERIEL MANAGEMENT TASKS
5.5.1 Perform shop supply services;
use the automated Army supply system as the primary means of attaining materiel.
Quality: IAW AR 750-1, AR 710-2, DA
PAM 25-30, AR 725-50, DA PAM 710-2-
2; AR 740-1; AR 735-5; AR 710-1; AR
710-3; DA Pam 710-7; AR 710-3, DA Pam 710-2-1; FEDLOG; and LIS user’s manual
Random (shop/activity scheduled periodically)
Lot: All in-process and completed work orders, requisitions, requests, files, records, SOPs, and stockage at time of surveillance.
AQL: 95%
5.5.6 Manage Standard Pricing (SP) items.
Timeliness: Meet SP turn- in criteria for timeliness of turn-ins.
Quality: IAW DFAS-IN Reg 37-1 Chapter 13, finance & accounting policy, implementation, unserviceable turn-ins, and current army guidance.
Periodic
Lot: The numbers of SP items processed during the period at time of surveillance.
PRODUCTION CONTROL
5.6.1 Operate a production control capability that effectively manages the maintenance workload; provide personnel technically capable of performing all tasks found in the applicable maintenance LIS End User Manual. Operate multiple equipment receiving points; provide order statuses.
Timeliness: Work completed IAW time estimates given at work induction.
Quality: IAW work request, AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable LIS publications, local policies and procedures.
Random
Lot: All in process and completed work as well as all existing logs and files at time of surveillance
AQL 95%
FOOD SERVICE EQUIPMENT
5.7.1 Provide preventive, scheduled, and unscheduled repair services.
Quality: IAW Density list
Bi-Weekly
Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing
AQL:90%
5.7.2 Perform inspections, services, and maintenance.
Quality: IAW applicable technical manual / manufacturer's instructions.
Random
Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing
AQL: 90%
5.7.3 Provide unscheduled maintenance.
Timeliness: Unscheduled maintenance service calls are responded to within 24 hours or 1 business day of notification from DFAC maintenance
POC.
Random
Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing
AQL: 90%
5.7.4 Utilizing ODCs to perform maintenance tasks.
Quality: ODCs approved by DFAC Manager are utilized when contractor does not possess a unique skillset needed to complete a repair/service.
Random
Lot: All in process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.
AQL: 90%
TECHNICAL INSPECTION
5.8.1 The contractor shall perform technical inspections in Accordance with maintenance request
Quality: IAW AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable TMs, OEM instructions, installation policies and procedures, external and internal SOPs and COR guidance
Random
Lot: All initial, in-process and completed technical inspection includes condition is fair wear and tear, extent of maintenance effort, classified as economically or non-economically repairable, provide verification of proper condition code
AQL 97%
File details come from the government source that posted it. Updated .