This document is a Performance Work Statement (PWS) that outlines the requirements for transportation, fleet management, and rail operations services at Fort Cavazos, TX. Key details include:

The PWS covers various transportation-related tasks such as maintaining vehicle justifications, dispatching and inspecting vehicles, processing accident/incident reports, coordinating vehicle maintenance, assisting with unit movement planning, performing maintenance on government-owned locomotives, ordering fuel and lubricants, coordinating track repairs, managing security seals, processing inbound freight, and coordinating railcar movements. Specific performance standards, sampling methods, lot sizes, and acceptable quality levels are defined for each task. The PWS is related to Solicitation W519TC-23-R-0102 issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal for maintenance, supply, and transportation services at Fort Cavazos, TX.

View the file

Other files

File Type Posted
B08-Attachment 0039- Ft. Cavazos Q&A responses round 5.xlsx XLSX spreadsheet
W519TC23R0102-0009.pdf PDF
B08 Attachment 0004 - Letter of Consent_FCTX-REV1.pdf PDF
B08 - Attachment 0038- Ft. Cavazos Q&A responses round 4.xlsx XLSX spreadsheet
W519TC23R0102-0008.pdf PDF
B08 Attachment 0036- Ft. Cavazos Q&A Responses Round 2.xlsx XLSX spreadsheet
W519TC23R0102-0007.pdf PDF
B08 - Attachment 0037- FT. Cavazos Q&A responses round 3.xlsx XLSX spreadsheet
W519TC23R0102-0006.pdf PDF
W519TC23R0102-0004.pdf PDF
W519TC23R0102-0003.pdf PDF
Attachment 0035- Ft. Cavazos Q&A Responses Round 2.xlsx XLSX spreadsheet
FCTX QA Round 02_26JUN2024 - FOR OFFERORS.xlsx XLSX spreadsheet
B08 Attachment 0011 - Contract References Spreadsheet_18JUN24.xlsx XLSX spreadsheet
B08 Attachment 0001 - Performance Work Statement - PWS 24JUN2024.pdf PDF
W519TC23R0102-0002.pdf PDF
B08-Attachment 0001- Performance Work Statement - PWS 30MAY2024.pdf PDF
B08-Attachment 0035- Ft. Cavazos Q&A Responses_10JUN2024.xlsx XLSX spreadsheet
B08-Attachment 0031- Appendix C Red Hat 30MAY2024.docx DOCX document
B08-Attachment 0005 - Cost Price Matrix-Cavazos 03JUN2024.xlsx XLSX spreadsheet
B08-Attachment 0030- Appendix B Phantom SSA 30MAY2024.docx DOCX document
W519TC23R0102-0001.pdf PDF
B08-Attachment 0033- Appendix E PAAT 30MAY2024.docx DOCX document
B08-Attachment 0034- Appendix F 3SFAB 30MAY2024.docx DOCX document
B08-Attachment 0032- Appendix D FSR 30MAY2024.docx DOCX document
B08 Exhibit E - MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
B08 Attachment 0010 Blocked File Extensions_with updated DoDAAC (1).pdf PDF
W519TC23R0102.pdf PDF
B08 Exhibit J - SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
B08 Attachment 0008 - NOT APPLICABLE.pdf PDF
B08 Attachment 0014 - Small Business Participation Plan.docx DOCX document
B08 Attachment 0001 - Performance Work Statement - PWS 20240307.pdf PDF
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf PDF
B08 Attachment 0016 - PWS Annex A Maintenance PRS 20240301.pdf PDF
B08 Exhibit A - dd1423-1.pdf PDF
B08 Exhibit G - PM-09 Performance Management Review Format (version 3-04-24).pptx PPTX presentation
B08 Attachment 0020 - PWS Annex E - Definitions Acronyms Abbreviations.pdf PDF
B08 Attachment 0009 - Purchasing Invoicing Guide (PIG) FCTX.pdf PDF
B08 Attachment 0005 - Cost Price Matrix-Cavazos.xlsx XLSX spreadsheet
B08 Attachment 0002 - Staffing and Labor Mix 7MAR24.xlsx XLSX spreadsheet
B08 Attachment 0004 - Letter of Consent_FCTX.pdf PDF
B08 Exhibit B - CDRL Listing 6MAR24.xlsx XLSX spreadsheet
B08 Attachment 0022 - PWS Appendix A MDRS 20240229.pdf PDF
B08 Attachment 0021 - PWS Annex F - Publications and Forms.pdf PDF
B08 Exhibit D - ITD-01 Transportation Report Format.xlsx XLSX spreadsheet
B08 Attachment 0011 - Contract References Spreadsheet_FCTX.xlsx XLSX spreadsheet
B08 Attachment 0003 - Performance Questionnaire_FCTX.pdf PDF
B08 Attachment 0029 Government Responses to Industry FCTX.xlsx XLSX spreadsheet
B08 Exhibit F - PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
B08 Exhibit C - CD-02 Burn Rate Report Format v10.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task/Requirement Standard Sampling Method, Lot & Acceptable Quality Level (AQL)

TRANSPORTATION - GENERAL

5.26.3 Provide reports and statistical data

Timeliness: Reports and statistical data delivered by the due date.

Quality: IAW DLRS ITD-01 Accurate and complete

Surveillance activity report

Lot: Inspect reports submitted per quarter.

AQL: 95%

FLEET MANAGEMENT OPERATIONS

5.29.1 Maintain a copy of justification on each motor vehicle utilized for official use and notify users when it is due to expire excluding

LSEV.

Timeliness: Annually

Quality: Justification must meet the requirements of AR 58-1.

Random sampling

Lot: GSA vehicle justifications prepared each year.

AQL: 100%

Inspect & dispatch GSA vehicles and GSA credit cards

Timeliness: Vehicle inspected at time of dispatch and upon return. LSEV inspected and dispatch quarterly.

Quality: Inspection shall be performed accurately

Random sampling

Lot: Each GSA vehicle dispatch in process or completed at time of surveillance.

Perform dispatch operation

a. Timeliness: Vehicle and forms prepared as scheduled

b. Quality: Complete required forms and briefs customers for approved missions

LOT: The number of dispatches completed at time of surveillance.

AQL: 97%

Pick up and deliver vehicles

a. Timeliness: Vehicle and forms prepared as scheduled

b. Quality: Complete required forms and briefs customers for approved missions

LOT: The number of dispatches completed at

5.29.1, 5.29.4 Control & Account for GSA vehicles, keys, and credit cards report loss/abuse

a. Timeliness: By COB daily Notify COR upon discovery.

b. Quality: complete & accurate

Lot: Each vehicle requiring pickup and delivery completed at time of

AQL: 98%

5.29.2 Process vehicles accident and incidents reports

a. Timeliness: Notify TMO of accident or incident within 2 working days

b. Quality: Complete reports documentations and file documents

Surveillance activity checklist

Lot: Accident and incident report available at time or surveillance

5.29.3 GSA Vehicle Accountability Form when processing vehicle replacements, annotate and submit to

IPBO

a. Timeliness: Have vehicle paperwork completed and ready for TMO signature by 7th workday after rotation or termination.

b. Quality: Complete & accurate

Lot: Each GSA vehicle, keys and credit cards accounted for at time of

5.29.6 Coordinate Schedule for Maintenance of GSA vehicles.

a. Timeliness: Users notified 5 business days prior to scheduled maintenance date

b. Quality: Scheduled maintenance performed.

Surveillance activity checklist

Lot: Each GSA vehicle requiring maintenance completed at time of

UNIT MOVEMENT

5.30.1 Provide necessary assistance to the Unit Movement Coordinator (UMC) with unit movement data maintenance and movement planning.

Timeliness: Meet UMC’s processing times.

Quality: All unit moves completed as required.

Surveillance activity checklist

Lot: Each unit move

Document loaded equipment Properly

Timeliness: Upon completion of loading.

Quality: Load data will be obtained complete and accurate.

Random sampling

Lot: Each piece of equipment loaded in process or completed at time of surveillance

AQL: 99%

Utilize Radio Communications

Timeliness: At all times during unit movement.

Quality: Radios are operational during unit movements.

Random sampling

Lot: Inspect transportation operation in process or completed at time of

5.30.2 Assist and advise unit movement planning and coordination

Timeliness: Meet UMC’s processing times.

Quality: Assist and advise UMO training 100 percent of the time

Random sampling

Lot: Each unit move

RAIL OPERATIONS

5.34.1 Perform operator level maintenance on on-hand government owned locomotives

Timeliness: IAW applicable maintenance manuals and to meet mission requirements.

Quality: Complete & accurate

Random sampling

Lot: Each maintenance inspection completed at

Order all required petroleum liquids and lubricants for locomotives.

Timeliness:

Fuel: Ordered when on hand fuel reaches 1000 gallons minimum.

Oil: Ordered when on hand oil reaches 110 gallons minimum.

Oil sample: submitted every 25 hours of operation or 90 days, whichever occurs first.

Quality: fuel & petroleum levels maintained at or above level of ordering.

Surveillance Activity Checklist

Lot: Inspect fuel order request per quarter.

Take oil samples for oil test

Timeliness: oil sample: submitted every 25 hours of operation or 90 calendar days, whichever occurs first.

Quality: Completely, efficiently, and effectively.

Random sampling

Lot: Inspection completed at time of surveillance.

Coordinate for track repairs & foliage/debris removal.

Timeliness: Second and fourth week of each month.

Quality: Completely, efficiently, and effectively.

Random sampling

Lot: Track coordination performed and complete at time of surveillance.

Control Government and/or Commercial Security Seals

Timeliness: To meet mission requirements.

Quality: Security seals will be properly requisitioned, received, controlled, and utilized.

Surveillance Activity Checklist

Lot: Inspect security seals inventory

Process inbound freight documentation

Timeliness: SF 361, Discrepancy report, and necessary reshipment will be completed within 30 calendar days of receipt of shipment.

Quality: Mis-cosigned and/or mismarked shipments will be correctly re-consigned inbound shipment documentation processed, recorded, and reviewed promptly and accurately.

Random sampling

Lot: Each inbound shipment received or completed at time of

AQL 95%

Movement of DODX Railcars

Timeliness: Disposition instructions from SDDC will be requested within 2 business days of notification of completion of mission. Coordinate with TSP to meet SDDC timelines. CBL will be provided to TSP at the time of pick up.

Quality: DODX cars will be completely and safely moved. Random sampling

Random sampling

Lot: Each request for DODX railcar movement completed at time of

5.34.2 Provide loaded/empty rail car numbers to TSP, UMC, & SDDC; release rail cars to

TSP.

Timeliness: Within 4 hours of interchange.

Quality: Information & release order is complete and accurate.

Surveillance activity checklist

Lot: Inspect rail carload plan completed at time of

5.34.3 Coordinate interchange with

TSP

Timeliness: Coordination completed not less than 24 hours prior to arrival/departure of railcars.

Quality: To meet mission requirements.

Surveillance activity checklist

Lot: Inspect interchange completed at time of

Protect Rail Crossings

Timeliness: Prior to Locomotive approach at pedestrian/vehicle crossing.

Quality: Completely and safely. Flagmen will possess PPE which is visible in day and night.

Surveillance activity checklist

Lot: Each track crossing protected at time of

Perform Interchange with rail carrier. Clear obstructions on track.

Timeliness: Arrive 30 minutes prior to scheduled interchange. Obstructions cleared to allow timely arrival at interchange.

Quality: Safely and efficiently.

Surveillance activity checklist

Lot: Inspect interchange with Carrier.

AQL: 98%