B08-Attachment 0032- Appendix D FSR 30MAY2024.docx

DOCX document 26 KB Posted

Attached to
EAGLE Fort Cavazos, TX W519TC-23-R-0102
Solicitation number
W519TC23R0102
Issued by

About this file

This document is an Appendix D that provides details on the requirements for a Field Service Representative (FSR) to support the Global Combat System-Army (GCSS-A) system. The FSR is required to have a solid understanding of integrated logistics, transportation, maintenance, material management, distribution, and inventory management. The FSR will provide analysis of logistic information system data to develop performance metrics, capabilities, and recommendations for all levels of command.

The anticipated workload is provided in TD-02 and may fluctuate based on changes to unit operational tempo. The key responsibilities include analyzing Plant 2002 logistics performance, evaluating Material Requirement Planning (MRP) for higher and lower headquarters, researching the status of required parts in the distribution pipeline, and demonstrating strong technical skills. The normal work hours are 7:00 am to 4:00 pm Monday through Friday, excluding federal holidays, with the potential for split shift operations as required. The document is an appendix to the larger solicitation W519TC-23-R-0102 for maintenance, supply, and transportation services at Fort Cavazos, TX, issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal.

View the file

Other files

File Type Posted
B08-Attachment 0039- Ft. Cavazos Q&A responses round 5.xlsx XLSX spreadsheet
W519TC23R0102-0009.pdf PDF
B08 Attachment 0004 - Letter of Consent_FCTX-REV1.pdf PDF
B08 - Attachment 0038- Ft. Cavazos Q&A responses round 4.xlsx XLSX spreadsheet
W519TC23R0102-0008.pdf PDF
B08 Attachment 0036- Ft. Cavazos Q&A Responses Round 2.xlsx XLSX spreadsheet
W519TC23R0102-0007.pdf PDF
B08 - Attachment 0037- FT. Cavazos Q&A responses round 3.xlsx XLSX spreadsheet
W519TC23R0102-0006.pdf PDF
W519TC23R0102-0004.pdf PDF
W519TC23R0102-0003.pdf PDF
Attachment 0035- Ft. Cavazos Q&A Responses Round 2.xlsx XLSX spreadsheet
FCTX QA Round 02_26JUN2024 - FOR OFFERORS.xlsx XLSX spreadsheet
B08 Attachment 0011 - Contract References Spreadsheet_18JUN24.xlsx XLSX spreadsheet
B08 Attachment 0001 - Performance Work Statement - PWS 24JUN2024.pdf PDF
W519TC23R0102-0002.pdf PDF
B08-Attachment 0001- Performance Work Statement - PWS 30MAY2024.pdf PDF
B08-Attachment 0035- Ft. Cavazos Q&A Responses_10JUN2024.xlsx XLSX spreadsheet
B08-Attachment 0031- Appendix C Red Hat 30MAY2024.docx DOCX document
B08-Attachment 0005 - Cost Price Matrix-Cavazos 03JUN2024.xlsx XLSX spreadsheet
B08-Attachment 0030- Appendix B Phantom SSA 30MAY2024.docx DOCX document
W519TC23R0102-0001.pdf PDF
B08-Attachment 0033- Appendix E PAAT 30MAY2024.docx DOCX document
B08-Attachment 0034- Appendix F 3SFAB 30MAY2024.docx DOCX document
B08 Exhibit E - MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
B08 Attachment 0010 Blocked File Extensions_with updated DoDAAC (1).pdf PDF
W519TC23R0102.pdf PDF
B08 Exhibit J - SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
B08 Attachment 0008 - NOT APPLICABLE.pdf PDF
B08 Attachment 0014 - Small Business Participation Plan.docx DOCX document
B08 Attachment 0001 - Performance Work Statement - PWS 20240307.pdf PDF
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf PDF
B08 Attachment 0016 - PWS Annex A Maintenance PRS 20240301.pdf PDF
B08 Exhibit A - dd1423-1.pdf PDF
B08 Exhibit G - PM-09 Performance Management Review Format (version 3-04-24).pptx PPTX presentation
B08 Attachment 0020 - PWS Annex E - Definitions Acronyms Abbreviations.pdf PDF
B08 Attachment 0009 - Purchasing Invoicing Guide (PIG) FCTX.pdf PDF
B08 Attachment 0018 - PWS Annex C Transportation PRS 20240301.pdf PDF
B08 Attachment 0005 - Cost Price Matrix-Cavazos.xlsx XLSX spreadsheet
B08 Attachment 0002 - Staffing and Labor Mix 7MAR24.xlsx XLSX spreadsheet
B08 Attachment 0004 - Letter of Consent_FCTX.pdf PDF
B08 Exhibit B - CDRL Listing 6MAR24.xlsx XLSX spreadsheet
B08 Attachment 0022 - PWS Appendix A MDRS 20240229.pdf PDF
B08 Attachment 0021 - PWS Annex F - Publications and Forms.pdf PDF
B08 Exhibit D - ITD-01 Transportation Report Format.xlsx XLSX spreadsheet
B08 Attachment 0011 - Contract References Spreadsheet_FCTX.xlsx XLSX spreadsheet
B08 Attachment 0003 - Performance Questionnaire_FCTX.pdf PDF
B08 Attachment 0029 Government Responses to Industry FCTX.xlsx XLSX spreadsheet
B08 Exhibit F - PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
B08 Exhibit C - CD-02 Burn Rate Report Format v10.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX D

SUBJECT: Global Combat System-Army (GCSS-A) Field Service Representative (FSR)

Functional Area: Maintenance, Supply, and Transportation

1.1 Description of Requirements. The contractor shall provide individual and collective assistance to Soldiers, Officers, and Civilians on GCSS-A. Demonstrate a solid understanding of integrated logistics, transportation, maintenance, material management, distribution, and inventory management. Provide analysis of logistic information system raw data outputs for maintenance, supply, and transportation to develop logistic performance, metrics, and capability formatted briefing and white papers to provide recommendations, solutions, and corrective action to all levels of command.

1.2 Anticipated workload. The current workload is provided on TD-02. This has the potential to fluctuate based on increase or decrease to the units OPTEMPO.

1.2.2 Detailed Performance Requirements.

1.2.2.1 The contractor shall be able to provide analysis of Plant 2002 to include logistic performance, metrics, and capabilities.

1.2.2.2 The contractor personnel shall be able to provide analysis of Plant 2000 and 2001 to include Material Requirement Planning (MRP) performance for requiring activity headquarters and subordinate organizations.

1.2.2.3 The contractor shall research and provide analysis regarding the status of required parts within the distribution pipeline and their impact on readiness.

1.2.2.4 The contractor shall demonstrate knowledge of logistic management systems, Army regulations and policies, directives, and local policies. Demonstrate strong computer skills and proficiency in the current Windows OS, Adobe Acrobat/Reader and Microsoft Word, Excel, and Power Point as well as ability to conduct basic troubleshooting techniques with computer and printer failures.

1.2.2.5 The contractor’s normal hours for the Supply Support Activities operation shall be 7:00 a.m. to 4:00 p.m., Mondays through Fridays; excluding federal holidays. Mission dependent and with notification, the contractor may be required to conduct split shift operations to support customer requirements.

File details come from the government source that posted it. Updated .