Questions and Answers 7.pdf

PDF 693 KB Posted

Attached to
CONSTRUCT F-35 ALTER BUILDING 400 AMXS Federal contract opportunity
Solicitation number
W50S9F-22-R-0006
Issued by
Department of the Army National Guard

About this file

This document contains a federal contract opportunity solicitation for construction services to modify an aircraft hangar facility at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The scope of work includes altering the existing facility to accommodate F-35 operations such as demolishing and rebuilding administration and maintenance areas, adding two ABA-compliant elevators, and upgrading power, HVAC, fire suppression, and lightning and fall protection systems. The solicitation will result in a single firm fixed-price construction contract with a period of performance of 450 days from notice to proceed. The contract value is estimated between $10-25 million. The pre-proposal conference will be held on April 7, 2022 and proposals are due by May 5, 2022. Evaluation criteria are technical approach, past performance, and price. The award will be made without discussions to the responsible offeror providing the best value. The solicitation requires compliance with limitations on subcontracting and subcontracting plans.

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT F-35 ALTER BUILDING 400 AMXS, newest first.
File Type Posted
W50S9F22R0006 Solicitation Amendment 0005.pdf PDF
ATTACHMENT 21 - FSB2020-332-00_WI-ANG_B400 AMXS_ADD NO. 03_2022.05.12.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 5.pdf PDF
ATTACHMENT 18 - 01_FSB2020-332-00_WI-ANG_B400_ADD NO. 02_2022.05.06_Narrative.pdf PDF
ATTACHMENT 19 - FSB2020-332-00 - WI-ANG - B400 AMXS - Type B-3 Addendum 002 COMBINED DRAWINGS.pdf PDF
W50S9F22R0006 Solicitation Amendment 0004.pdf PDF
ATTACHMENT 20 - FSB2020-332-00_WI-ANG_B400 AMXS_ADD NO. 02_2022.05.06.pdf PDF
ATTACHMENT 16 - Addendum No. 01 Updated CD Plans (Affected Sheets Only).pdf PDF
W50S9F22R0006 Solicitation Amendment 0003.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE - Rev 1.docx DOCX document
Questions and Answers 4.pdf PDF
ATTACHMENT 15 - Addendum No. 01 Narrative.pdf PDF
ATTACHMENT 17 - Addendum No. 01 Updated CD Specifications (Affected Specifications Only).pdf PDF
W50S9F22R0006 Solicitation Amendment 0002.pdf PDF
Questions and Answers 3.pdf PDF
Questions and Answers 2.pdf PDF
Pre-Proposal Attendee Sign In Sheet.pdf PDF
B.07.Pre-Proposal Slides - F-35 B400 AMXS.pptx PPTX presentation
W50S9F22R0006 Solicitation Amendment 0001.pdf PDF
Supplemental Site Visit Instructions.pdf PDF
Amendment 0001 Summary of Changes.pdf PDF
Questions and Answers 1.pdf PDF
ATTACHMENT 07 - XGFG182009 F-35 Alter B400 AMXS - Material Management Plan PFAS.pdf PDF
ATTACHMENT 11 - XGFG182009 SAP Single Source Determination_Advantor.pdf PDF
ATTACHMENT 12 - XGFG182009 SAP Single Source Determination_Andover.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT G SUBCONTRACTING PLAN FORMAT.docx DOCX document
W50S9F22R0006 Solicitation 21 Mar 22.pdf PDF
ATTACHMENT 02 - Volume 4 - WI ANG F-35 B400 Final CD Specs Type B-3 (1 of 2) updated.pdf PDF
ATTACHMENT 05 - FSB2020-332-00 - WI-ANG - B400 AMXS - COMBINED DRAWINGS.pdf PDF
ATTACHMENT 06 - XGFG182009 F-35 Alter B400 AMXS - Asbestos LBP Hazmat Assessment.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
SAF_IE memo dtd 211116 - Sundown Policy for Foam Fire Supression Systems.pdf PDF
ATTACHMENT 01 - Volume 2 - WI ANG F-35 B400 ATFP Type B-3.pdf PDF
ATTACHMENT 03 - Volume 4 - WI ANG F-35 B400 Final CD Specs Type B-3 (2 of 2).pdf PDF
ATTACHMENT 08 - XGFG182009 F-35 Alter B400 AMXS - Site Characterization Report.pdf PDF
ATTACHMENT 10 - PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
ATTACHMENT 14 - XGFG182009 SAP Single Source Determination_Monaco.pdf PDF
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 04 - Volume 6 - WI ANG F-35 B400 GBCI Type B-3.pdf PDF
ATTACHMENT 09 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 13 - XGFG182009 SAP Single Source Determination_MBS.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation # W50S9F22R0006 Posted to SAM.Gov 21 Mar 22

Questions & Responses #7

Question Response

1.

Please provide specifications section for the waterproofing and drainage board shown on detail D1/A400.

Contract documents have been updated to provide requirements for bentonite waterproofing. This has been updated as part of Addendum No. 03, dated 12 May 2022.

Please see Addendum No. 03 Specifications, Section 07 17 00.

2.

Page 5, Standard 12 of the Antiterrorism Report found in the reference docs specifies that the exterior doors are to exceed the requirements of the 2018 ATFP standards. The 2018 AFTP document requires that the doors comply with UFC 4-010-01 from the DoD manual. In the newest version of the UFC 4-010-01, the appendix lists ASTM 2927 which is the "Standard Test Method for Door Systems Subject to Airblast Loadings".

There are multiple levels of protection for blast resistant openings.

The doors need one of the following levels of protection: High, Medium, Low, or Very Low. Please confirm levels for the doors.L3

Per Appendix B of UFC 4-010-01 (12 December 2018; Change 1, 19 August 2020), the contents in Appendix B are not required (UFC 4-010-01, Paragraph B-1 INTRODUCTION, p.

39). As such, requirements and standards noted in this Appendix are not applicable to the project unless specifically requested by the Contracting Office as noted in the reference document referenced in the bid question (Volume 2 - Antiterrorism Report). UFC 4-010-01, Paragraph 3-13 STANDARD 12. EXTERIOR DOORS (p. 26) provides AT/FP requirements for exterior doors, and for glazing in and around exterior doors with reference to Standard 10 for such glazing (Paragraph 3-13.2). UFC 4-010-01, Paragraph 3-11 STANDARD 10. GLAZING (pp. 24-25) states that "[g]lazing that is in compliance with this standard is not required to be designed or constructed for blast resistance" and provides prescriptive provisions for exterior glazing for existing buildings. The exterior doors and glazing in the exterior doors provided in the contract documents meet the requirements of, and the prescriptive provisions for exterior glazing included in, UFC 4-010-01.

Solicitation # W50S9F22R0006 Posted to SAM.Gov 21 Mar 22

Questions & Responses #7

3.

Also please confirm the following information.

In the above chart, either the left or the right column needs to be filled out completely. If the architect doesn't have the charge weight and standoff then they need to have the peak applied pressure with the duration or the impulse. The peak applied pressure is measured in PSI and the duration is measured in milliseconds.

Per Appendix B of UFC 4-010-01 (12 December 2018; Change 1, 19 August 2020), the contents in Appendix B are not required (UFC 4-010-01, Paragraph B-1 INTRODUCTION, p.

39). As such, requirements and standards noted in this Appendix are not applicable to the project unless specifically requested by the Contracting Office as noted in the reference document referenced in the bid question (Volume 2 - Antiterrorism Report). UFC 4-010-01, Paragraph 3-13 STANDARD 12. EXTERIOR DOORS (p. 26) provides AT/FP requirements for exterior doors, and for glazing in and around exterior doors with reference to Standard 10 for such glazing (Paragraph 3-13.2). UFC 4-010-01, Paragraph 3-11 STANDARD 10. GLAZING (pp. 24-25) states that "[g]lazing that is in compliance with this standard is not required to be designed or constructed for blast resistance" and provides prescriptive provisions for exterior glazing for existing buildings. The exterior doors and glazing in the exterior doors provided in the contract documents meet the requirements of, and the prescriptive provisions for exterior glazing included in, UFC 4-010-01.

File details come from the government source that posted it. Updated .