This is a solicitation for a construction contract to alter Building 400 at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The scope of work includes modifying the existing aircraft hangar facility to accommodate F-35 operations such as demolishing and rebuilding administration and maintenance areas, adding two elevators, and upgrading power, HVAC, and fire suppression systems at aircraft parking spots. The project also involves a partial roof replacement and upgrades to lightning and fall protection systems. The base award includes construction CLINs for the F-35 alterations, communication cabling, and security cabling. There are also two option CLINs for a communication tower and aircraft power. The contract duration is 450 days from notice to proceed. The solicitation closing date is May 5, 2022. The evaluation factors are technical, past performance, and price, with award intended without discussions.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Type B-3
Volume 4 – CD Specifications (2 of 2)
F-35: Alter Building 400 AMXS
Wisconsin Air National Guard 115th Fighter Wing Dane County Regional Airport
Truax Field Air National Guard Base
Madison, WI
NGB Contract: W9133L-16-D-0005
Task Order: W50S9F-20-F-0002
WI ANG PN: XGFG182009
January 21, 2022
ANG/WI – F-35: Alter Building 400 AMXS 20203320F35B400
Type B-3 Submission 21 January 2022
SEALS PAGE Page 1
SEALS PAGE
DESIGN PROFESSIONALS OF RECORD (DPOR)
A. Architect:
1. Jason Holuby, AIA, LEED AP BD+C
2. Responsible for Division 01 (Portion of Specification 01 57 19), U.N.O Herein; Divisions 06, 07, 08, 09, 10, 12, and 14; and
Specification 02 41 00
3. E-mail: jholuby@fsb-ae.com
4. Ph: 405.840.2931
B. Civil:
1. Lindsay Hausman, P.E.
2. Responsible for Divisions 31 and 32
3. E-mail: lhausman@hanson-inc.com
4. Ph: 217.747.9314
C. Structural:
1. Gene Brown, P.E., LEED AP
2. Responsible for Divisions 03, 04 and 05; and Specification 01 45 35
3. E-mail: gbrown@fsb-ae.com
D. Mechanical:
1. John Semtner, P.E.
2. Responsible for Divisions 22 and 23
3. E-mail: jsemtner@fsb-ae.com
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
GENE O.
BROWN
E-47748
OKLAHOMA CITY
OK
W
IS C O NS IN
A R C H I T E C T
JASON T.
HOLUBY
A-13101
OKLAHOMA CITY
OK
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
JOHN B.
SEMTNER
E-47742
OKLAHOMA CITY
OK
1/21/22 mailto:jholuby@fsb-ae.com mailto:lhausman@hanson-inc.com mailto:gbrown@fsb-ae.com mailto:jsemtner@fsb-ae.com hausm00682 Image
ANG/WI – F-35: Alter Building 400 AMXS 20203320F35B400
Type B-3 Submission 21 January 2021
SEALS PAGE Page 2
E. Electrical:
1. John T. Little, P.E.
2. Responsible for Divisions 25, 26, and 27
3. E-mail: jlittle@fsb-ae.com
4. Ph: 405.840.2931
F. Fire Protection:
1. Liane Ozmun, P.E.
2. Responsible for Divisions 21 and 28
3. E-mail: lozmun@fsb-ae.com
4. Ph: 405.840.2931
G. Environmental:
1. Ben Peotter, PE
2. Responsible for Portion of Specification 01 57 19; and
Specification 02 61 13, 02 81 00, 02 82 00, 02 83 00, 02 84 16, and 02 84 33
3. E-mail: peotterb@ayresassociates.com
4. Ph: 608.443.1200 1/20/22
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
LIANE F
OZMUN
E-48073
OKLAHOMA CITY
OK
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
JOHN T
LITTLE
E-47833
EDMOND
OK
mailto:jlittle@fsb-ae.com mailto:lozmun@fsb-ae.com mailto:steinerj@ayresassociates.com
ANG/WI - F-35: Alter Building 400 AMXS 20203320F35B400
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
PROJECT TABLE OF CONTENTS Page 1
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 60 45 SKYLIGHTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 87 35 ARCHITECTURAL WINDOW FILM
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 54 36 SUSPENDED DECORATIVE GRIDS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 77 20 FIBERGLASS REINFORCED WALL PANELS
09 84 20 ACOUSTICAL WALL AND CEILINGPANELS
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 00 CELL PHONE LOCKERS
10 51 13 METAL LOCKERS
10 53 00 MANUFACTURED CANOPY
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 23 ELECTRIC TRACTION PASSENGER AND SERVICE ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
PROJECT TABLE OF CONTENTS Page 2
21 13 18 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 31 13.00 40 METAL DUCTS
23 34 23.00 40 HVAC POWER VENTILATORS
23 36 00.00 40 AIR TERMINAL UNITS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES
23 52 00 HEATING BOILERS
23 74 33.00 40 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP
AIR-CONDITIONERS
23 75 15 CUSTOM-PACKAGED, AIRCRAFT PRE-CONDITIONED AIR UNITS
23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.01 CYBERSECURITY FOR LOW IMPACT HVAC CONTROL SYSTEMS
25 05 11.02 CYBERSECURITY FOR LOW IMPACT PORTABLE GENERATOR LOAD BANK
CONNECTION CABINET CONTROL SYSTEMS
25 05 11.03 CYBERSECURITY FOR LOW IMPACT SWITCH GEAR AUTOMATION
CONTROL SYSTEMS
25 05 11.04 CYBERSECURITY FOR LOW IMPACT FIRE PROTECTION/MASS
NOTIFICATION SYSTEM FACILITY-RELATEDCONTROL SYSTEMS
25 05 11.05 CYBERSECURITY FOR LOW IMPACT ACCESS CONTROL SYSTEM AND
INTRUSION DETECTION SYSTEM FACILITY-RELATED CONTROL
SYSTEMS
25 05 11.06 CYBERSECURITY FOR LOW IMPACT CCTV SYSTEM FACILITY-RELATED
CONTROL SYSTEMS
25 05 11.07 CYBERSECURITY FOR LOW IMPACT ELECTRICAL METERING AND
NETWORK LIGHTING CONTROLS FACILITY-RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 43 NETWORK LIGHTING CONTROLS (WIRED)
26 20 00 INTERIOR DISTRIBUTION SYSTEM
PROJECT TABLE OF CONTENTS Page 3
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 00.00 10 MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 35 44.00 20 270 VDC SOLID STATE GROUND POWER UNIT
26 36 20 PORTABLE GENERATOR AND LOAD BANK CONNECTION CABINETS
(PGLBCC)
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 20 BASE COURSE FOR SIDEWALK
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 21 13 13
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2016) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1013 (2011) Performance Requirements for Reduced Pressure Principle Backflow Preventers and Reduced Pressure Fire Protection Principle Backflow Preventers - (ANSI approved 2010)
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA M14 (2015) Manual: Recommended Practice for Backflow Prevention and Cross-Connection Control
ASTM INTERNATIONAL (ASTM)
ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A135/A135M (2009; R2014) Standard Specification for Electric-Resistance-Welded Steel Pipe
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
SECTION 21 13 13 Page 1
ASTM A183 (2014; R 2020) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A536 (1984; R 2019; E 2019) Standard Specification for Ductile Iron Castings
FM GLOBAL (FM)
FM 1637 (2010) Flexible Sprinkler Hose with Threaded End Fittings
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 (2010) Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and Threaded Ends
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 ( 2022 ) Standard for the Installation of Sprinkler Systems
NFPA 24 ( 2022 ) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NFPA 101 ( 2021 ) Life Safety Code
NFPA 291 (20 22) Recommended Practice for Fire Flow Testing and Marking of Hydrants
NFPA 1963 (2019) Standard for Fire Hose Connections
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
UNDERWRITERS LABORATORIES (UL)
UL 199 (2020) UL Standard for Safety Automatic Sprinklers for Fire-Protection Service
UL 312 (2010; Reprint Mar 2018) UL Standard for Safety Check Valves for Fire-Protection
SECTION 21 13 13 Page 2
Service
UL 405 (2013; Bul. 2020) UL Standard for Safety Fire Department Connection Devices
UL 668 (2004; Reprint Jul 2016) UL Standard for Safety Hose Valves for Fire-Protection Service
UL 1767 (3013; Bul. 2015) UL Standard for Safety Early-Suppression Fast-Response Sprinklers
UL 2443 (2015; Reprint May 2020) UL Standard for Safety Flexible Sprinkler Hose with Fitings for Fire Protection Service
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
UNIFORM FACILITIES CRITERIA (UFC)
UFC 3-600-01 (2016, Change 6) Fire Protection Engineering for Facilities
1.2 SYSTEM DESCRIPTION
Provide wet pipe sprinkler system(s) in areas indicated on the drawings .
Except as modified herein, the system must meet the requirements of NFPA 13 and UFC 3-600-01 . Pipe sizes must be determined by hydraulic calculations.
1.2.1 Hydraulic Design
1.2.1.1 Basis for Calculations
A waterflow test was performed on October 21, 2020 utilizing flow hydrants HYDR-6126-2 and HYDR-6025-10 and test(gauge) hydrant HYDR-6126-1 and resulted in a static pressure of 94 psi with a residual pressure of 80 psi while flowing 2924 gpm. Perform a fire hydrant flow test prior to shop drawing submittal in accordance with NFPA 291 , on which hydraulic calculations are based . Results must include hydrant elevations relative to the building and hydrant number/identifiers for the tested hydrants, including which were flowed, which had a gauge , with 15 psi margin of safety . This information must be presented in a tabular form if multiple hydrants were flowed. The results must be included with the hydraulic calculations. Hydraulic calculations must be based upon the Hazen-Williams formula with a "C" value noted in NFPA 13 for piping.
Hydraulic calculations must be based on operation of the fire pump(s) provided in Section 21 30 00 FIRE PUMPS. The minimum residual pressure in a service lateral (lead-in) at the 150% of the fire pump rated flow must be 20 psi at the inlet to the backflow preventer or greater, after derating the water supply by 15 psi at the inlet to the backflow preveenter .
1.2.1.2 Hydraulic Calculations
a. Water supply curves and system requirements must be plotted on semi-logarithmic graph (N^1.85) paper so as to present a summary of the complete hydraulic calculation.
b. Provide a summary sheet listing sprinklers in the design area and
SECTION 21 13 13 Page 3 their respective hydraulic reference points, elevations, minimum discharge pressures and minimum flows. Elevations of hydraulic reference points (nodes) must be indicated.
c. Documentation must identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe.
d. Where the sprinkler system is supplied by interconnected risers, the sprinkler system must be hydraulically calculated using the hydraulically most demanding single riser. The calculations must not assume the simultaneous use of more than one riser.
e. All calculations must include the backflow preventer manufacturer's stated friction loss at the design flow or 12 psi for a reduced pressure backflow preventer, whichever is greater.
f. All calculations must be performed back to the actual location of the flow test, taking into account the direction of flow in the service main at the test location.
g. For gridded systems, calculations must show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. A flow diagram indicating the quantity and direction of flows must be included.
1.2.1.3 Design Criteria
Hydraulically design the system to discharge a minimum density in accordance with UFC 3-600-01, Table 9-3, for the Hazard Classification indicated on the drawings . Hydraulic calculations must be in accordance with the Area/Density Method of NFPA 13. Add an allowance for exterior hose streams of 500 gpm to the sprinkler system demand at the fire hydrant shown on the drawings closest to the point where the water service enters the building , and 15 psi margin of safety .
1.2.2 Sprinkler Coverage
Sprinklers must be uniformly spaced on branch lines. Provide coverage throughout 100 percent of the area noted on the Contract drawings. This includes, but is not limited to, telephone rooms, electrical equipment rooms (regardless of the fire resistance rating of the enclosure), boiler rooms, switchgear rooms, transformer rooms, attached electrical vaults and other electrical and mechanical spaces. Coverage per sprinkler must be in accordance with NFPA 13 . Provide sprinklers below all obstructions in accordance with NFPA 13 . Exceptions are as follows:
a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101 .
1.2.3 Qualified Fire Protection Engineer (QFPE)
An individual who is a licensed professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience , including three projects similar to this one which have been in satisfactory use for at
SECTION 21 13 13 Page 4 least six months . Services of the QFPE must include:
a. Reviewing SD-02, SD-03, and SD-05 submittal packages and test procedures and reports for completeness and compliance with the provisions of this specification. Working (shop) drawings and calculations must be prepared by, or prepared under the immediate supervision of, the QFPE. The QFPE must affix their professional engineering seal or review stamp with signature to the shop drawings, calculations, and material data sheets, indicating approval prior to submitting the shop drawings to the DFPE.
b. Provide a letter documenting that the SD-02, SD-03, and SD-05 submittal package has been reviewed and noting all outstanding comments.
c. Performing in-progress construction surveillance prior to installation of ceilings (rough-in inspection).
d. Reviewing SD-06 test plans and procedures and test reports for completeness and compliance with the provisions of this specification. The QFPE must affix their review stamp with signature to the test plans and reports indicating approval before submitting to the DFPE.
e. Witnessing pre-Government and final Government functional performance testing and performing a final installation review.
f . Signing applicable certificates under SD-07.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Partial submittals and submittals not fully complying with NFPA 13 and this specification section must be returned disapproved without review. SD-02, SD-03 and SD-05 must be submitted simultaneously.
Shop drawings (SD-02), product data (SD-03) and calculations (SD-05) must be prepared by the designer and combined and submitted as one complete package , with the SD-o3 Product Data submitted under separate transmittal .
The QFPE must review the SD-02/SD-03/SD-05 submittal package for completeness and compliance with the Contract provisions prior to submission to the Government. The QFPE must provide a Letter of Confirmation that they have reviewed the submittal package for compliance with the contract provisions. This letter must include their professional engineer stamp and signature. Partial submittals and submittals not reviewed by the QFPE must be returned disapproved without review.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Qualified Fire Protection Engineer (QFPE) ; G
Sprinkler System Designer ; G
Sprinkler System Installer ; G
SECTION 21 13 13 Page 5
SD-02 Shop Drawings
Shop Drawing ; G
SD-03 Product Data
Pipe ; G
Fittings ; G
Valves , including gate, check, butterfly, and globe; G
Riser Check Valves ; G
Relief Valves ; G
Sprinklers ; G
Pipe Hangers and Supports ; G
Sprinkler Alarm Switch ; G
Valve Supervisory (Tamper) Switch ; G
Fire Department Connection ; G
Backflow Prevention Assembly ; G
Air Vent ; G
Hose Valve ; G
Nameplates ; G
SD-05 Design Data
Hydraulic Calculations ; G
SD-06 Test Reports
Preliminary Test Procedures ; G
Final Test Procedures ; G
Preliminary Test Report ; G
Final Test Report ; G
SD-07 Certificates
Verification of Compliant Installation ; G
Request for Government Final Test ; G
SD-10 Operation and Maintenance Data
Operating and Maintenance (O&M) Instructions ; G
Posted Operating and Maintenance (O&M) Instructions ; G
SECTION 21 13 13 Page 6
Spare Parts Data; G
SD-11 Closeout Submittals
As-built drawings
1.4 QUALITY ASSURANCE
1.4.1 Preconstruction Submittals
Within 36 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit the SD-01 Submittals for review and approval. SD-02, SD-03 and SD-05 submittals received prior to the review and approval of the qualifications will be returned Disapproved Without Review.
1.4.1.1 Shop Drawing
Three copies of the shop drawings plus one digital copy , no later than 28 days prior to the start of system installation. Working drawings conforming to the requirements prescribed in NFPA 13 and must be no smaller than the Contract Drawings. Each set of drawings must include the following:
1. A descriptive index with drawings listed in sequence by number. A legend sheet identifying device symbols, nomenclature, and conventions used in the package.
2. Floor plans drawn to a scale not less than 1/8-inch equals 1-foot clearly showing locations of devices, equipment, risers, and other details required to clearly describe the proposed arrangement. Text height shall be minimum 1/10".
3. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross mains and branch lines to finished floor and roof or ceiling. A detail must show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
4. Longitudinal and transverse building sections showing typical branch line and cross main pipe routing, elevation of each typical sprinkler above finished floor and elevation of "cloud" or false ceilings in relation to the building ceilings.
5. Plan and elevation views which establish that the equipment will fit the allotted spaces with clearance for installation and maintenance.
6. Enlarged r iser layout plans and section drawings drawn to a scale of not less than 1/2-inch equals 1-foot to show details of each system component, clearances between each other and from other equipment and construction in the room.
7. Details of each type of riser assembly, pipe hanger, and electrical devices and interconnecting wiring. The dimension from the edge of vertical piping to the nearest adjacent wall(s) must be indicated on the drawings when vertical piping is located in stairs or other portions of the means of egress.
SECTION 21 13 13 Page 7
8. Details of each type of pipe hanger , force protection bracing/restraint for components over 31 pounds, and related components.
9. Include fire pump curve with shop drawings and hydraulic calculations and a hand drawn combined water supply curve showing pump suction and discharge conditions plotted with hydraulic design data .
1.4.1.2 Product Data
Three paper and one digital copies of annotated catalog data to show the specific model, type, and size of each item. Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, options, and other pertinent information, that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements. Product data for all equipment must be combined into a single submittal , submitted at the same time as shop drawings and calculations. .
1.4.1.3 Hydraulic Calculations
Calculations must be as outlined in NFPA 13 except that calculations must be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings.
Calculations must include isometric diagram indicating hydraulic nodes and pipe segments. Include fire pump curve and combined water supply with flow test and pump curve with submittal.
1.4.1.4 Operating and Maintenance (O&M) Instructions
Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA as supplemented and modified by this specification section.
Provide six paper manuals with tabs and table of contents corresponding to page numbers, and one pdf version on electronic media. The manuals must include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment.
Submit spare parts data for each different item of material and equipment specified. The data must include a complete list of parts and supplies, and a list of parts recommended by the manufacturer to be replaced after 1-year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.
1.4.1.4.1 Posted Operating and Maintenance (O&M) Instructions
Provide Posted O&M Instructions, in color with professionally prepared graphics, 15" x 21" or larger, framed in heavy gauge extruded metal frames, mounted under glass, water/weatherproof. Permanently mount in a reserved clear wall area as shown on the shop drawings, near FACU and/or sprinkler riser. Include comprehensive schematics for sprinkler and fire alarm systems, facility floor plans showing location of all fire equipment and devices with coordinated identification. Include fire rated walls, fire dampers, fire alarm riser diagram, I/O matrix, point list, and all components. Include valve charts, equipment schedule and wiring diagrams and schematics.
SECTION 21 13 13 Page 8
1.4.2 Qualifications
1.4.2.1 Sprinkler System Designer
The sprinkler system designer must be certified as a Level IV Technician by National Institute for Certification in Engineering Technologies (NICET) in the Water-Based Systems Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 .
1.4.2.2 Sprinkler System Installer
The sprinkler system installer must be regularly engaged in the installation of the type and complexity of system specified in the contract documents, and must have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.3 Regulatory Requirements
Equipment and material must be listed or approved. Listed or approved, as used in this Section, means listed, labeled or approved by a Nationally Recognized Testing Laboratory (NRTL) such as UL Fire Prot Dir or FM APP GUIDE. The omission of these terms under the description of an item or equipment described must not be construed as waiving this requirement. All listings or approvals by testing laboratories must be from an existing ANSI or UL published standard. The recommended practices stated in the manufacturer's literature or documentation are mandatory requirements.
1.5 DELIVERY, STORAGE, AND HANDLING
Protect all equipment delivered and placed in storage from the weather, excessive humidity and temperature variations, dirt and dust, or other contaminants. All pipes must be either capped or plugged until installed.
1.6 EXTRA MATERIALS
Spare sprinklers and wrench(es) must be provided as spare parts in accordance with NFPA 13 .
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Standard Products
Provide materials, equipment, and devices listed for fire protection service when so required by NFPA 13 or this specification. Select material from one manufacturer, where possible, and not a combination of manufacturers, for a classification of material. Material and equipment must be standard products of a manufacturer regularly engaged in the manufacture of the products for at least 2 years prior to bid.
2.1.2 Nameplates
Major components of equipment must have the manufacturer's name, address, type or style, model or serial number, catalog number, date of installation, installing Contractor's name and address, and the contract number provided on a new name plate permanently affixed to the item or
SECTION 21 13 13 Page 9 equipment. Nameplates must be etched metal or plastic, permanently attached by screws to control units, panels or adjacent walls.
2.1.3 Identification and Marking
Pipe and fitting markings must include name or identifying symbol of manufacturer and nominal size. Pipe must be marked with ASTM designation. Valves and equipment markings must have name or identifying symbol of manufacturer, specific model number, nominal size, name of device, arrow indicating direction of flow, and position of installation (horizontal or vertical), except if valve can be installed in either position. Markings must be included on the body casting or on an etched or stamped metal nameplate permanently on the valve or cover plate.
2.1.4 Pressure Ratings
Valves, fittings, couplings, alarm switches, and similar devices must be rated for the maximum working pressures that can be experienced in the system, but in no case less than 175 psi .
2.2 ABOVEGROUND PIPING COMPONENTS
2.2.1 Steel Piping Components
2.2.1.1 Steel Pipe
Except as modified herein, pipe must be Sch 40 black steel as permitted by NFPA 13 and conform to the applicable provisions of ASTM A53/A53M, ASTM A135/A135M or ASTM A153/A153M .
Steel pipe must be minimum Schedule 40.
2.2.1.2 Fittings
Fittings must be shop welded, threaded, or grooved-end type. Threaded fittings must be cast-iron conforming to ASME B16.4 , malleable-iron conforming to ASME B16.3 or ductile-iron conforming to ASTM A536.
Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe, steel press fittings and field welded fittings are not permitted. Fittings, mechanical couplings, and rubber gaskets must be supplied by the same manufacturer. Threaded fittings must use Teflon tape or manufacturer's approved joint compound.
Saddle tees using rubber gasketed fittings are prohibited. Reducing couplings are not permitted.
2.2.1.3 Grooved Mechanical Joints and Fittings
Joints and fittings must be designed for not less than 175 psi service and the product of the same manufacturer. Field welded fittings must not be used. Fitting and coupling housing must be malleable-iron conforming to ASTM A47/A47M, Grade 32510; ductile-iron conforming to ASTM A536, Grade 65-45-12. Rubber gasketed grooved-end pipe and fittings with mechanical couplings are permitted in pipe sizes 2 inches and larger. Gasket must be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts must be heat-treated steel conforming to ASTM A183 and must be cadmium-plated or zinc-electroplated.
SECTION 21 13 13 Page 10
2.2.1.4 Flanges
Flanges must conform to NFPA 13 and ASME B16.1 . Gaskets must be non-asbestos compressed material in accordance with ASME B16.21 , 1/16-inch thick, and full face or self-centering flat ring type. Cleated flanges or flange adapters on any piping is prohibited.
2.2.2 Flexible Sprinkler Hose
The use of flexible hose is permitted. Flexible sprinkler hose must comply with UL 2443 and FM 1637 , and installed per FM recommended bend requirements .
2.2.3 Pipe Hangers and Supports
Provide galvanized pipe hangers, supports in accordance with NFPA 13 .
2.2.4 Valves
Provide valves of types approved for fire service. Valves must open by counterclockwise rotation.
2.2.4.1 Control Valve
Manually operated sprinkler control/gate valve must be outside stem and yoke (OS&Y) type or butterfly type as indicated on the drawings and must be listed.
2.2.4.2 Check Valves
Check valves must comply with UL 312 . Check valves 4 inches and larger must be of the swing type, have a clear waterway and meet the requirements of MSS SP-71 , for Type 3 or 4. Inspection plate must be provided on valves larger than 6 inches .
2.2.4.3 Hose Valve
Valve must comply with UL 668 .
2.2.5 Riser Check Valves
Existing wet pipe risers shall remain in place. Provide a new pressure relief valve where required by UFC 3-600-01 or UFC 4-211-01. Acceptance test at completion of project. Provide repairs and upgrades as required for compliance with UFC 3-600-01.
2.3 ALARM INITIATING AND SUPERVISORY DEVICES
2.3.1 Sprinkler Alarm Switch
Provide new Vane or pressure-type flow switch(es). Connection of switch must be by the fire alarm installer. Vane type alarm actuating devices must have mechanical diaphragm controlled retard device adjustable from 10 to 60 seconds and must instantly recycle. Flow switches for elevator power shunt must not have a retard feature.
2.3.2 Valve Supervisory (Tamper) Switch
Switch must be integral to the control valve or suitable for mounting to
SECTION 21 13 13 Page 11 the type of control valve to be supervised open. The switch must be tamper resistant and contain SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.
2.4 BACKFLOW PREVENTION ASSEMBLY
Reduced-pressure principle valve assembly backflow preventer complying with ASSE 1013 , and AWWA M14. Each check valve must have a drain.
Backflow prevention assemblies must have current "Certificate of Approval from the Foundation for Cross-Connection Control and Hydraulic Research, FCCCHR List" and be listed for fire protection use. Listing of the specific make, model, design, and size in the FCCCHR List is acceptable as the required documentation.
2.4.1 Backflow Preventer Test Connection
Test connection must consist of a series of listed hose valve s with 2 1/2-inch National Standard male hose threads with cap and chain. Fire pump test connection may be used if configured to test backflow preventer.
2.5 FIRE DEPARTMENT CONNECTION
Fire department connection must be projecting or flush type with cast-brass body, matching wall escutcheon lettered "Auto Spkr" with a polished-brass finish. The connection must have individual self-closing clappers, caps with drip drains and chains. Female inlets must have 2 1/2-inch diameter American National Fire Hose Connection Screw Threads (NH) per NFPA 1963 . Existing fire department connection may be reused if serviceable. Comply with UL 405 .
2.6 SPRINKLERS
Sprinklers must comply with UL 199 and NFPA 13 and UFC 3-600-01 .
Sprinklers with internal O-rings are not acceptable. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters must have temperature classification in accordance with NFPA 13 . Extended coverage sprinklers are permitted for loading docks, residential occupancies and high-piled storage applications only.
2.6.1 Pendent Sprinkler
Pendent sprinkler must be recessed quick-response type with nominal K-factor of 5.6 or 8.0 . Pendent sprinklers must have a polished chrome finish. Assembly must include an integral escutcheon.
2.6.2 Upright Sprinkler
Upright sprinkler must be brass quick-response type and have a nominal K-factor of 5.6 or 8.0 .
2.6.3 Sidewall Sprinkler
Sidewall sprinkler must be the quick-response type. Sidewall sprinkler must have a nominal K-factor of 5.6 or 8.0 . Sidewall sprinkler must have a brass finish.
SECTION 21 13 13 Page 12
2.6.4 Concealed Sprinkler
Concealed sprinkler must be quick-response type and have a nominal K-factor of 5.6 or 8.0 . Coverplate must be white.
2.6.5 Corrosion-Resistant Sprinkler
Corrosion-resistant sprinkler must be the upright or pendent type installed in locations as indicated. Corrosion-resistant coatings must be factory-applied by the sprinkler manufacturer.
2.6.6 Dry Sprinkler Assembly
Dry sprinkler assembly must be of the pendent or sidewall type as indicated. Assembly must include an integral escutcheon. Maximum length must not exceed maximum indicated in its listing. Sprinkler must have a polished chrome finish.
2.6.7 Control Mode Specific Application Sprinkler
Control mode specific application sprinkler must be of the pendent or upright type as indicated. Sprinkler must be specifically listed for high-piled storage only. Sprinkler must have a rough brass finish.
2.6.8 ESFR Sprinkler
ESFR sprinkler must be pendent or upright and comply with UL 1767 .
2.7 ACCESSORIES
2.7.1 Sprinkler Cabinet
Provide spare sprinklers in accordance with NFPA 13 and must be placed in a suitable metal or plastic cabinet of sufficient size to accommodate all the spare sprinklers and wrenches in designated locations. Spare sprinklers must be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed as required by NFPA 13 . At least one wrench of each type required must be provided.
2.7.2 Pendent Sprinkler Escutcheon
Escutcheon must be one-piece metallic type with a depth of less than 3/4-inch and suitable for installation on pendent sprinklers. The escutcheon must have a factory finish that matches the pendent sprinkler.
2.7.3 Pipe Escutcheon
Provide split hinge metal plates for piping entering walls, floors, and ceilings in exposed spaces. Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces.
2.7.4 Sprinkler Guard
Listed guard must be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards must be provided on sprinklers located within 7 feet of the floor.
SECTION 21 13 13 Page 13
2.7.5 Relief Valve
Relief valves must be listed and installed at the riser in accordance with
NFPA 13 .
2.7.6 Air Vent
Air vents must be of the automatic type and piped to drain to the building exterior.
2.7.7 Identification Sign
Valve identification sign must be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gage steel or 0.024-inch aluminum with red letters on a white background or white letters on red background. Wording of sign must include, but not be limited to "main drain", "auxiliary drain", "inspector's test", "alarm test", "alarm line", and similar wording as required to identify operational components. Where there is more than one sprinkler system, signage must include specific details as to the respective system.
2.7.8 Posted Operating and Maintenance (O&M) Instructions
O&M Manuals shall be completed, submitted and approved no later than 30 days prior to beneficial occupancy. Provide waterproof heavy metal extruded framed permanent posted O&M instructions under glass that are coordinated with and keyed to the O&M Manuals and that utilize the system and device identification and operations identifications. Instructions shall have professionally prepared graphics, printed on full sized sheets, in color. Posted instructions shall show, at a minimum:
(a) Comprehensive schematic piping diagrams including water supply, fire pump and sprinkler systems.
(b) Facility floor plans showing location of all fire equipment and devices with coordinated identification. Show items such as fire walls, fire barriers, fire dampers, etc.
(c) System diagrams, including isometrics of special equipment such as fire pumps and fire risers and all appurtenances.
(d) Valve charts.
(e) Equipment schedule.
(f) Wiring diagrams and schematics.
PART 3 EXECUTION
3.1 VERIFYING ACTUAL FIELD CONDITIONS
Before commencing work, examine all adjoining work on which the contractor's work that is dependent for perfect workmanship according to the intent of this specification section, and report to the Contracting Officer's Representative a condition that prevents performance of first class work. No "waiver of responsibility" for incomplete, inadequate or defective adjoining work will be considered unless notice has been filed before submittal of a proposal.
3.2 INSTALLATION
The installation must be in accordance with the applicable provisions of UFC 3-600-01 , UFC 4-211-01 , ANG ETL 15-01-03, NFPA 13 , NFPA 24 and
SECTION 21 13 13 Page 14 publications referenced therein. Locate sprinklers in a consistent pattern with ceiling grid, lights, and air supply diffusers. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively affect or disrupt the sprinkler discharge pattern and coverage.
a. Piping offsets, fittings, and other accessories required must be furnished to provide a complete installation and to eliminate interference with other construction.
b. Wherever the contractor's work interconnects with work of other trades the Contractor must coordinate with other Contractors to insure all Contractors have the information necessary so that they may properly install all necessary connections and equipment. Identify all work items needing access (dampers and similar equipment) that are concealed above hung ceilings by permanent color coded pins/tabs in the ceiling directly below the item.
c. Provide required supports and hangers for piping, conduit, and equipment so that loading will not exceed allowable loadings of structure. Submittal of a bid must be a deemed representation that the contractor submitting such bid has ascertained allowable loadings and has included in his estimates the costs associated in furnishing required supports.
3.2.1 Waste Removal
At the conclusion of each day's work, clean up and stockpile on site all waste, debris, and trash which may have accumulated during the day as a result of work by the contractor and of his presence on the job.
Sidewalks and streets adjoining the property must be kept broom clean and free of waste, debris, trash and obstructions caused by work of the contractor, which will affect the condition and safety of streets, walks, utilities, and property.
3.3 ABOVEGROUND PIPING INSTALLATION
The methods of fabrication and installation of the aboveground piping must fully comply with the requirements and recommended practices of NFPA 13 and this specification section.
3.3.1 Protection of Piping Against Earthquake Damage
Seismic restraint is not required for sprinkler piping .
3.3.2 Piping in Exposed Areas
Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, must be installed to provide maximum headroom.
3.3.3 Piping in Finished Areas
In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping must be concealed above ceilings. Piping must be inspected, hydrostatically tested and approved before being concealed. Risers and similar vertical runs of piping in finished areas must be concealed.
SECTION 21 13 13 Page 15
3.3.4 Pendent Sprinklers
a. Drop nipples to pendent sprinklers must consist of minimum 1-inch pipe with a reducing coupling into which the sprinkler must be threaded.
b. Where sprinklers are installed below suspended or dropped ceilings, drop nipples must be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling must not extend below the underside of the ceiling.
c. Recessed pendent sprinklers must be installed such that the distance from the sprinkler deflector to the underside of the ceiling must not exceed the manufacturer's listed range and must be of uniform depth throughout the finished area.
d. Pendent sprinklers in suspended ceilings must be located in the center of the tile (+/- 2 inches).
e. Dry pendent sprinkler assemblies must be such that sprinkler ceiling plates or escutcheons are of uniform depth throughout the finished space.
f. Dry pendent sprinklers must be of the required length to permit the sprinkler to be threaded directly into a branch line tee.
g. Where the maximum static or flowing pressure, whichever is greater at the sprinkler, applied other than through the fire department connection, exceeds 100 psi and a branch line above the ceiling supplies sprinklers in a pendent position below the ceiling, the cumulative horizontal length of an unsupported armover to a sprinkler or sprinkler drop must not exceed 12 inches for steel pipe.
3.3.5 Upright Sprinklers
Riser nipples or "sprigs" to upright sprinklers must contain no fittings between the branch line tee and the reducing coupling at the sprinkler.
3.3.6 Pipe Joints
Pipe joints must conform to NFPA 13 , except as modified herein. Not more than four threads must show after joint is made up. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints must be provided where indicated or required by NFPA 13 . Grooved pipe and fittings must be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools must be products of the same manufacturer. The diameter of grooves made in the field must be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe must be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances.
3.3.7 Reducers
Reductions in pipe sizes must be made with one-piece tapered reducing
SECTION 21 13 13 Page 16 fittings. Bushings are not allowed .
3.3.8 Pipe Penetrations
a. Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate concrete or masonry walls or concrete floors must be core-drilled and provided with pipe sleeves. Each sleeve must be Schedule 40 galvanized steel, ductile-iron or cast-iron pipe and extend through its respective wall or floor and be cut flush with each wall surface. Sleeves must provide required clearance between the pipe and the sleeve per NFPA 13 .
The space between the sleeve and the pipe must be firmly packed with mineral wool insulation.
b. Where pipes and sleeves penetrate fire walls, fire partitions, or floors, pipes/sleeves must be firestopped in accordance with Section 07 84 00 FIRESTOPPING by the approved firestop installer per approved firestop shop drawings .
c. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe must be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable mass or with a mechanically adjustable segmented elastomer seal.
d. All penetrations through the boundary of rooms/areas identified as secure space area must meet ICS 705-1 .
3.3.9 Escutcheons
Escutcheons must be provided for pipe penetration in finished areas of ceilings, floors and walls. Escutcheons must be securely fastened to the pipe at surfaces through which piping passes.
3.3.10 Inspector's Test Connection
Unless otherwise indicated, the test connection must consist of 1-inch pipe connected at the riser as a combination test and drain valve; a fully accessible test valve located approximately 7 feet above the floor; a smooth bore brass outlet equivalent to the smallest orifice sprinkler used in the system; and a painted metal identification sign affixed to the valve with the words "Inspector's Test". All test connection piping must be inside of the building and penetrate the exterior wall at the location of the discharge orifice only. The discharge orifice must be located outside the building wall no more than 2 feet above finished grade, directed so as not to cause damage to adjacent construction or landscaping during full flow discharge, or to the sanitary sewer. Discharge to the exterior must not interfere with exiting from the facility. Water discharge or runoff must not cross the path of egress from the building.
Do not discharge to the roof. Discharge to floor drains, janitor sinks or similar fixtures is not permitted.
Provide concrete splash blocks at all drain and inspector's test connection discharge locations if not discharging to a concrete surface.
Splash blocks must be large enough to mitigate erosion and not become dislodged during a full flow of the drain. Ensure all discharged water drains away from the facility and does not cause property damage.
SECTION 21 13 13 Page 17
3.3.11 Backflow Preventer
Install backflow preventers so that the bottom of the assembly is a minimum of 6 inches above the finished floor/grade. Install horizontal backflow preventers so that the bottom of the assembly is no greater than 24 inches above the finished floor/grade. Install vertical backflow preventers so that the upper operating handwheel is no more than 6 feet above the finished floor/grade. Clearance around control valve handles must be minimum 6 inches above grade/finished floor and away from walls.
Route minimum 12" relief valve piping with air gap, sloped to discharge at the building exterior onto a concrete splash block capable of recieving the full discharge flow rate of 400 gpm, or as recommended by the backflow preventer manufacturer, whichever is greater.
3.3.11.1 Test Connection
Provide downstream of the backflow prevention assembly UL 668 hose valves with 2.5-inch National Standard male hose threads with cap and chain.
Provide one valve for each 250 gpm of system demand or fraction thereof.
Provide a permanent sign in accordance with paragraph entitled "Identification Signs" which reads, "Test Valve". Indicate location of test header. If an exterior connection, provide a control valve inside a heated mechanical room to prevent freezing. Fire pump test header may be utilized instead of dedicated BFP test connection if piped appropriately.
3.3.12 Drains
a. Main drain piping must be provided to discharge at a safe point outside the building, no more than 2 feet above finished grade.
Provide a concrete splash block at drain outlet. Discharge to the exterior must not interfere with exiting from the facility. Water discharge or runoff must not cross the path of egress from the building.
b. Auxiliary drains must be provided as required by NFPA 13 , maximum height 7 feet above the floor Auxiliary drains are permitted to discharge to a floor drain if the drain is sized to accommodate full flow (min 40 gpm ). Discharge to service sinks or similar plumbing fixtures is not permitted.
3.3.13 Installation of Fire Department Connection
Connection must be mounted on the exterior wall…