ATTACHMENT 15 - Addendum No. 01 Narrative.pdf

PDF 336 KB Posted

Attached to
CONSTRUCT F-35 ALTER BUILDING 400 AMXS Federal contract opportunity
Solicitation number
W50S9F-22-R-0006
Issued by
Department of the Army National Guard

About this file

This document provides details for a federal solicitation seeking construction services. The solicitation will result in a single firm fixed-price contract to construct and alter Building 400 at Dane County Regional Airport-Truax Field in Madison, Wisconsin to accommodate F-35 operations for the 115th Fighter Wing. Scope of work includes demolishing and rebuilding administration and maintenance areas, adding two elevators, and upgrading systems to all aircraft parking spots. Additional options include a communication tower and aircraft power. The contract term is 450 days from notice to proceed. The estimated value is between $10-25 million. The solicitation closes May 5th, 2022 and follows a best-value evaluation of technical, past performance and price factors without discussions. Interested parties must register in SAM and check the beta.SAM.GOV website for solicitation documents and any amendments. Brand name justification will be provided.

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT F-35 ALTER BUILDING 400 AMXS, newest first.
File Type Posted
W50S9F22R0006 Solicitation Amendment 0005.pdf PDF
ATTACHMENT 21 - FSB2020-332-00_WI-ANG_B400 AMXS_ADD NO. 03_2022.05.12.pdf PDF
Questions and Answers 7.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 5.pdf PDF
ATTACHMENT 18 - 01_FSB2020-332-00_WI-ANG_B400_ADD NO. 02_2022.05.06_Narrative.pdf PDF
ATTACHMENT 19 - FSB2020-332-00 - WI-ANG - B400 AMXS - Type B-3 Addendum 002 COMBINED DRAWINGS.pdf PDF
W50S9F22R0006 Solicitation Amendment 0004.pdf PDF
ATTACHMENT 20 - FSB2020-332-00_WI-ANG_B400 AMXS_ADD NO. 02_2022.05.06.pdf PDF
ATTACHMENT 16 - Addendum No. 01 Updated CD Plans (Affected Sheets Only).pdf PDF
Questions and Answers 4.pdf PDF
ATTACHMENT 17 - Addendum No. 01 Updated CD Specifications (Affected Specifications Only).pdf PDF
W50S9F22R0006 Solicitation Amendment 0003.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE - Rev 1.docx DOCX document
W50S9F22R0006 Solicitation Amendment 0002.pdf PDF
Questions and Answers 3.pdf PDF
Questions and Answers 2.pdf PDF
Pre-Proposal Attendee Sign In Sheet.pdf PDF
B.07.Pre-Proposal Slides - F-35 B400 AMXS.pptx PPTX presentation
W50S9F22R0006 Solicitation Amendment 0001.pdf PDF
Supplemental Site Visit Instructions.pdf PDF
Amendment 0001 Summary of Changes.pdf PDF
Questions and Answers 1.pdf PDF
ATTACHMENT 07 - XGFG182009 F-35 Alter B400 AMXS - Material Management Plan PFAS.pdf PDF
ATTACHMENT 11 - XGFG182009 SAP Single Source Determination_Advantor.pdf PDF
ATTACHMENT 12 - XGFG182009 SAP Single Source Determination_Andover.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT G SUBCONTRACTING PLAN FORMAT.docx DOCX document
SAF_IE memo dtd 211116 - Sundown Policy for Foam Fire Supression Systems.pdf PDF
ATTACHMENT 01 - Volume 2 - WI ANG F-35 B400 ATFP Type B-3.pdf PDF
ATTACHMENT 03 - Volume 4 - WI ANG F-35 B400 Final CD Specs Type B-3 (2 of 2).pdf PDF
ATTACHMENT 08 - XGFG182009 F-35 Alter B400 AMXS - Site Characterization Report.pdf PDF
ATTACHMENT 10 - PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
ATTACHMENT 14 - XGFG182009 SAP Single Source Determination_Monaco.pdf PDF
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
W50S9F22R0006 Solicitation 21 Mar 22.pdf PDF
ATTACHMENT 02 - Volume 4 - WI ANG F-35 B400 Final CD Specs Type B-3 (1 of 2) updated.pdf PDF
ATTACHMENT 05 - FSB2020-332-00 - WI-ANG - B400 AMXS - COMBINED DRAWINGS.pdf PDF
ATTACHMENT 06 - XGFG182009 F-35 Alter B400 AMXS - Asbestos LBP Hazmat Assessment.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 04 - Volume 6 - WI ANG F-35 B400 GBCI Type B-3.pdf PDF
ATTACHMENT 09 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 13 - XGFG182009 SAP Single Source Determination_MBS.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

h:\prj\2020\20203320\08-submissions\2022_05_02_add 1-b3 submission\fsb2020-332-00_wi-ang_b400_add no. 01_2022.05.02_narrative.docx Page 1 of 19

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

ADDENDUM NO. 01

Date: 2 May 2022

To: ALL BIDDERS OF RECORD

From: Frankfurt-Short-Bruza Associates, P.C.

5801 N. Broadway Ext., Suite 500 Oklahoma City, OK 73118

Subject: XGFG182009: F-35: Alter Building 400 AMXS, WI/ANG, Truax Field, Madison, WI

FSB Project No.: FSB2020-332-00

NOTE: This Addendum forms a part of the Contract Documents and modifies the Original Documents dated 21 January 2022.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

ATTACHMENTS

Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of (19) pages and the following attachments:

Specifications:

01 14 00 – WORK RESTRICTIONS

01 20 00 – PRICE AND PAYMENT PROCEDURES

01 32 01.00 10 – PROJECT SCHEDULE

05 50 13 – MISCELLANEOUS METAL FABRICATIONS

06 41 16.00 10 – PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

08 71 00 – DOOR HARDWARE

12 24 13 – ROLLER WINDOW SHADES

21 13 13 – WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

21 13 18 – PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION

23 75 15 – CUSTOM-PACKAGED, AIRCRAFT PRE-CONDITIONED AIR UNITS

23 82 00.00 20 – TERMINAL HEATING UNITS

26 08 00 – APPARATUS INSPECTION AND TESTING

26 20 00 – INTERIOR DISTRIBUTION SYSTEM

26 24 13 – SWITCHBOARDS

26 28 01.00 10 – COORDINATED POWER SYSTEM PROTECTION

26 35 44 – 270 VDC SOLID STATE CONVERTER

26 51 00 – INTERIOR LIGHTING

26 56 00 – EXTERIOR LIGHTING

28 31 76 – INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE

FSB | DefineDesignDeliver

Drawings:

G-002 – SHEET INDEX

G-100 – CODE SUMMARY

G-110 – LIFE SAFETY PLAN – GROUND FLOOR

G-120 – LIFE SAFETY PLAN – SECOND FLOOR

SB101 – FOUNDATION AND SLAB PLAN

SF102 – ROOF FRAMING PLAN

SF502 – ENLARGED FRAMING PLANS AND DETAILS – ROOF

SF503 – ENLARGED FRAMING PLANS AND DETAILS – ELEVATOR ROOF

AD110 – COMPOSITE GROUND FLOOR DEMOLITION PLAN

AD120 – COMPOSITE SECOND FLOOR DEMOLITION PLAN

AD130 – COMPOSITE DEMOLITION ROOF PLAN

A-110 – COMPOSITE GROUND FLOOR PLAN

A-111 – GROUND FLOOR PLAN SECTOR A

A-112 – GROUND FLOOR PLAN SECTOR B

A-120 – COMPOSITE SECOND FLOOR PLAN

A-121 – SECOND FLOOR PLAN SECTOR A

A-122 – SECOND FLOOR PLAN SECTOR B

A-130 – COMPOSITE ROOF PLAN

A-132 – ROOF PLAN SECTOR B

AC110 – COMPOSITE GROUND FLOOR REFLECTED CEILING PLAN

AC111 – GROUND FLOOR REFLECTED CEILING PLAN SECTOR A

AC112 – GROUND FLOOR REFLECTED CEILING PLAN SECTOR B

AC120 – COMPOSITE SECOND FLOOR REFLECTED CEILING PLAN

AC121 – SECOND FLOOR REFLECTED CEILING PLAN SECTOR A

AC122 - SECOND FLOOR REFLECTED CEILING PLAN SECTOR B

A-201 – BUILDING ELEVATIONS

A-400 – ELEVATOR PLAN AND SECTIONS

A-404 – INTERIOR ELEVATIONS

A-500 – DOOR AND WINDOW DETAILS

A-602 – ROOM FINISH SCHEDULE

A-603 – FINISH MATERIALS SCHEDULE AND DETAILS

IN500 – INTERIOR FINISH DETAILS

IG112 – GROUND FLOOR SIGNAGE PLAN AREA ‘B’

IG122 – SECOND FLOOR SIGNAGE PLAN AREA ‘B’

IG600 – SIGNAGE SCHEDULE

F-001 – FIRE PROTECTION LEGEND & ABBREVIATIONS AND FIRE ALARM AREA PLANS

FD401 – FIRE PROTECTION ROOM DEMOLITION PLAN

FX110 – GROUND FLOOR FIRE SUPPRESSION PLAN

FX120 – SECOND FLOOR FIRE SUPPRESSION PLAN

FX401 – FIRE PROTECTION ROOM ENLARGED PLAN AND SECTIONS

FX601 – FIRE SUPPRESSION SCHEMATIC DIAGRAMS

FA111 – MISSING THIS SHEET IN SUBM. FOLDER

FA112 – GROUND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR B

FA121 – SECOND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR A

FA122 – SECOND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTION B

FA601 – FIRE ALARM & MASS NOTIFICATION INPUT/OUTPUT MATRIX

FA701 – FIRE ALARM RISER DIAGRAM

FC110 – PREACTION RELEASING SYSTEM PLAN

FC601 – RELEASING SYSTEM RISER DIAGRAM

FC701 – RELEASING SYSTEM CONTROLS INPUT/OUTPUT MATRIX

P-111 – GROUND FLOOR PLUMBING PLAN SECTOR A

M-001 – LEGEND & ABBREVIATIONS

MD101 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-A

MD102 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-B

MD201 – MECHANICAL DEMOLITION PLAN-SECOND FLOOR-SECTOR-A

MD202 – MECHANICAL DEMOLITION PLAN-SECOND FLOOR-SECTOR-B

MD301 – MECHANICAL DEMOLITION PLAN-ROOF-SECTOR-A

MD302 – MECHANICAL DEMOLITION PLAN-ROOF-SECTOR-B

MH101 – MECHANICAL HVAC PLAN-FIRST FLOOR-SECTOR-A

MH102 – MECHANICAL HVAC PLAN-FIRST FLOOR-SECTOR-B

MH201 – MECHANICAL HVAC PLAN-SECOND FLOOR-SECTOR-A

MH202 – MECHANICAL HVAC PLAN-SECOND FLOOR-SECTOR-B

MH301 – MECHANICAL HVAC PLAN-ROOF-SECTOR-A

MH302 – MECHANICAL HVAC PLAN-ROOF-SECTOR-B

MP101 – MECHANICAL PIPING PLAN-FIRST FLOOR-SECTOR-A

MP102 – MECHANICAL PIPING PLAN-FIRST FLOOR-SECTOR-B

MP201 – MECHANICAL PIPING PLAN-SECOND FLOOR-SECTOR-A

MP202 – MECHANICAL PIPING PLAN-SECOND FLOOR-SECTOR-B

M-301 – SECTIONS/ENLARGED VIEWS

M-501 – DETAILS

M-502 – DETAILS

M-601 – FLOW DIAGRAMS

M-602 – FLOW DIAGRAMS

M-701 – SCHEDULES

M-702 – SCHEDULES

M-801 – CONTROLS

M-802 – CONTROLS

M-803 – CONTROLS

M-804 – CONTROLS

M-805 – CONTROLS

E-001 – LEGEND, ABBREVIATIONS, & MOUNTING HEIGHT DETAIL

EG101 – ELECTRICAL GROUNDING PLAN

EG103 – LIGHTNING PROTECTION PLAN

EG502 – GROUNDING AND LIGHTNING PROTECTION DETAILS

EP110 – GROUND FLOOR MECHANICAL POWER PLAN

EP111 – ELECTRICAL FIRST FLOOR POWER PLAN – SECTOR A

EP112 – ELECTRICAL FIRST FLOOR POWER PLAN – SECTOR B

EP120 – SECOND FLOOR MECHANICAL POWER PLAN

EP121 – ELECTRICAL SECOND FLOOR POWER PLAN – SECTOR A

EP122 – ELECTRICAL SECOND FLOOR POWER PLAN – SECTOR B

EP131 – ELECTRICAL ROOF POWER PLAN

EP401 – ELECTRICAL ENLARGED PLANS

EP601 – ELECTRICAL POWER ONE-LINE DIAGRAM

EP701 – ELECTRICAL PANEL SCHEDULES

EP702 – ELECTRICAL PANEL SCHEDULES

EP703 – ELECTRICAL PANEL SCHEDULES

EP704 – ELECTRICAL PANEL SCHEDULES

EL111 – ELECTRICAL FIRST FLOOR LIGHTING PLAN – SECTOR A

EL112 – ELECTRICAL FIRST FLOOR LIGHTING PLAN – SECTOR B

EL121 – ELECTRICAL SECOND FLOOR LIGHTING PLAN – SECTOR A

EL122 – ELECTRICAL SECOND FLOOR LIGHTING PLAN – SECTOR B & ROOF LIGHTING PLAN

ET121 – TELECOMMUNICATION SECOND FLOOR PLAN – SECTOR A

ET601 – TELECOMMUNICATION RISER DIAGRAM

TY111 – TELECOMMUNICATION GROUND FLOOR SECURITY PLAN – SECTOR A

TY112 – TELECOMMUNICATION GROUND FLOOR SECURITY PLAN – SECTOR B

MODIFICATIONS TO THE CONDITIONS OF THE CONTRACT

None.

MODIFICATIONS TO THE SPECIFICATIONS

ITEM 01.2-1 Refer to attached Project Table of Contents, dated 2 May 2022:

A. Project Table of Contents is hereby revised and re-issued in its entirety to incorporate changes noted as part of this Addendum related to specifications included on the project. Replace Project Table of Contents dated 21 January 2022 with attached revised Project Table of Contents dated 2 May 2022.

ITEM 01.2-2 Refer to attached Specification Section 01 14 00 – WORK RESTRICTIONS, dated 2 May 2022:

A. Specification Section 01 14 00 is hereby revised and re-issued in its entirety to clarify requirements for working hours in Subpart 1.3.2 Working Hours. Replace Section 01 14 00 dated 21 January 2022 with attached revised Specification Section 01 14 00 dated 2 May 2022.

ITEM 01.2-3 Refer to attached Specification Section 01 20 00 – PRICE AND PAYMENT PROCEDURES, dated 2 May 2022:

A. Specification Section 01 20 00 is hereby revised and re-issued in its entirety to strike requirements for submission of invoices in Subpart 1.2.1 Submission of Invoices. Replace Section 01 20 00 dated 21 January 2022 with attached revised Specification Section 01 20 00 dated 2 May 2022.

ITEM 01.2-4 Refer to attached Specification Section 01 32 01.00 10 – PROJECT SCHEDULE, dated 2 May 2022:

A. Specification Section 01 32 01.00 10 is hereby revised and re-issued in its entirety to strike requirement for two (2) computers when using scheduling software other than Primavera in Subpart 2.1.2.2 Other Than Primavera. Replace Section 01 32 01.00 10 dated 21 January 2022 with attached revised Specification Section 01 32 01.00 10 dated 2 May 2022.

ITEM 01.2-5 Refer to attached Specification Section 05 50 13 – MISCELLANEOUS METAL FABRICATONS, dated

A. Specification Section 05 50 13 is hereby revised and re-issued in its entirety to strike requirements for galvanized steel pipe handrail; to strike requirements for downspout termination; and to strike requirements for bollards/pipe guards. Replace Section 05 50 13 dated 21 January 2022 with attached revised Specification Section 05 50 13 dated

ITEM 01.2-6 Refer to attached Specification Section 06 41 16.00 10 – PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS, dated 2 May 2022:

B. Specification Section 06 41 16.00 10 is hereby revised and re-issued in its entirety to provide updated requirements for cabinet hardware in Subpart 2.6 Cabinet Hardware. Replace Section 06 41 16.00 10 dated 21 January 2022 with attached revised Specification Section 06 41 16.00 10 dated 2 May 2022.

ITEM 01.2-7 Refer to attached Specification Section 08 71 00 – DOOR HARDWARE, dated 2 May 2022:

A. Specification Section 08 71 00 is hereby revised and re-issued in its entirety to provide updated requirements for door hardware and to include the Door Hardware Schedule. Replace Section 08 71 00 dated 21 January 2022 with attached revised Specification Section 08 71 00 dated 2 May 2022.

ITEM 01.2-8 Refer to attached Specification Section 12 24 13 – ROLLER WINDOW SHADES, dated 2 May 2022:

A. Specification Section 12 24 13 is hereby revised and re-issued in its entirety to strike electrical requirements included in Subpart 1.4.3; to strike all electrical requirements included in the specification; and to strike requirements for light traps included in Subpart 2.1.2.7.b. Replace Section 12 24 13 dated 21 January 2022 with attached revised Specification Section 12 24 13 dated 2 May 2022.

ITEM 01.2-9 Refer to attached Specification Section 21 13 13 – WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION, dated 2 May 2022:

A. Specification Section 21 13 13 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for wet pipe sprinkler systems on the project. Replace Section 21 13 13 dated 21 January 2022 with attached revised Specification Section 21 13 13 dated 2 May 2022.

ITEM 01.2-10 Refer to attached Specification Section 21 13 18 – PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION, dated 2 May 2022:

A. Specification Section 21 13 18 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for preaction sprinkler systems on the project. Replace Section 21 13 18 dated 21 January 2022 with attached revised Specification Section 21 13 18 dated 2 May 2022.

ITEM 01.2-11 Refer to Specification Section 21 13 25 – HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION, dated 21 January 2022:

A. Specification Section 21 13 25 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project. Remove Section 21 13 25 dated 21 January 2022 from the contract documents.

ITEM 01.2-12 Refer to Specification Section 21 30 00 – FIRE PUMPS, dated 21 January 2022:

A. Specification Section 21 30 00 is hereby deleted in its entirety to strike all requirements for fire pumps on the project.

Remove Section 21 30 00 dated 21 January 2022 from the contract documents.

ITEM 01.2-13 Refer to attached Specification Section 23 75 15 – CUSTOM-PACKAGED, AIRCRAFT PRE-CONDITIONED AIR UNITS, dated 2 May 2022:

A. Specification Section 23 75 15 is hereby revised and re-issued in its entirety provide clarification for all requirements of the mechanical systems on the project. Replace Section 23 75 15 dated 21 January 2022 with attached revised Specification Section 23 75 15 dated 2 May 2022.

ITEM 01.2-14 Refer to attached Specification Section 23 82 00.00 20 – TERMINAL HEATING UNITS, dated 2 May 2022:

A. Specification Section 23 82 00.00 20 is hereby issued in its entirety to provide requirements for terminal heating units on the project.

ITEM 01.2-15 Refer to attached Specification Section 26 08 00 – APPARATUS INSPECTION AND TESTING, dated 2 May 2022:

A. Specification Section 26 08 00 is hereby revised and re-issued in its entirety to provide updated requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Section 26 08 00 dated 21 January 2022 with attached revised Specification Section 26 08 00 dated 2 May 2022.

ITEM 01.2-16 Refer to Specification Section 26 09 43 – NETWORK LIGHTING CONTROLS (WIRED), dated 21 January 2022:

A. Specification Section 26 09 43 is hereby deleted in its entirety to strike all requirements for wired network lighting controls included in this specification on the project. Remove Section 26 09 43 dated 21 January 2022 from the contract documents.

ITEM 01.2-17 Refer to attached Specification Section 26 20 00 – INTERIOR DISTRIBUTION SYSTEM, dated 2 May 2022:

A. Specification Section 26 20 00 is hereby revised and re-issued in its entirety to provide updated requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Section 26 20 00 dated 21 January 2022 with attached revised Specification Section 26 20 00 dated 2 May 2022.

ITEM 01.2-18 Refer to attached Specification Section 26 24 13 – SWITCHBOARDS, dated 2 May 2022:

A. Specification Section 26 24 13 is hereby revised and re-issued in its entirety to provide updated requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Section 26 24 13 dated 21 January 2022 with attached revised Specification Section 26 24 13 dated 2 May 2022.

ITEM 01.2-19 Refer to Specification Section 26 28 00.00 10 – MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS, dated 21 January 2022:

A. Specification Section 26 28 00.00 10 is hereby deleted in its entirety to strike all requirements for motor control centers, switchboards, and panelboards included in this specification on the project. Remove Section 26 28 00.00 10 dated 21 January 2022 from the contract documents.

ITEM 01.2-20 Refer to attached Specification Section 26 28 01.00 10 – SWITCHBOARDS, dated 2 May 2022:

A. Specification Section 26 28 01.00 10 is hereby revised and re-issued in its entirety to provide updated requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Section 26 28 01.00 10 dated 21 January 2022 with attached revised Specification Section 26 28 01.00 10 dated

ITEM 01.2-21 Refer to attached Specification Section 26 35 44 – 270 VDC SOLID STATE CONVERTER, dated 2 May 2022:

A. Specification Section 26 35 44 is hereby revised and re-issued in its entirety to provide updated requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Section 26 35 44 dated 21 January 2022 with attached revised Specification Section 26 35 44 dated 2 May 2022.

ITEM 01.2-22 Refer to Specification Section 26 36 20 – PORTABLE GENERATOR AND LOAD BANK CONNECTION CABINETS, dated 21 January 2022:

A. Specification Section 26 36 20 is hereby deleted in its entirety to strike all requirements for portable generator and load bank connection cabinets included in this specification on the project. Remove Section 26 36 20 dated 21 January 2022 from the contract documents.

ITEM 01.2-23 Refer to attached Specification Section 26 51 00 – INTERIOR LIGHTING, dated 2 May 2022:

A. Specification Section 26 51 00 is hereby revised and re-issued in its entirety to provide updated requirements for interior lighting. Replace Section 26 51 00 dated 21 January 2022 with attached revised Specification Section 26 51 00 dated 2 May 2022.

ITEM 01.2-24 Refer to attached Specification Section 26 56 00 – EXTERIOR LIGHTING, dated 2 May 2022:

A. Specification Section 26 56 00 is hereby revised and re-issued in its entirety to provide updated requirements for exterior lighting. Replace Section 26 56 00 dated 21 January 2022 with attached revised Specification Section 26 56 00

ITEM 01.2-25 Refer to attached Specification Section 28 31 76 – INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE, dated 2 May 2022:

A. Specification Section 28 31 76 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for interior fire alarm and mass notification systems on the project. Replace Section 28 31 76 dated 21 January 2022 with attached revised Specification Section 28 31 76 dated

MODIFICATIONS TO THE DRAWINGS

ITEM 01.3-1 Refer to attached Sheet G-002 – SHEET INDEX, dated 2 May 2022:

A. Sheet G-002 is hereby revised and re-issued in its entirety to update plan sheets removed or issued as part of this Addendum on the project. Replace Sheet G-002 dated 21 January 2022 with attached revised Sheet G-002 dated

ITEM 01.3-2 Refer to attached Sheet G-100 – CODE SUMMARY, dated 2 May 2022:

B. Sheet G-100 is hereby revised and re-issued in its entirety to remove an incorrect reference to Puerto Rico Amendments in Building Codes and Standards. Replace Sheet G-100 dated 21 January 2022 with attached revised Sheet G-100 dated 2 May 2022.

ITEM 01.3-3 Refer to attached Sheet G-110 – LIFE SAFETY PLAN – GROUND FLOOR, dated 2 May 2022:

A. Sheet G-110 is hereby revised and re-issued in its entirety to provide requirements for maintenance of existing fire rating at all walls between hangar bay and administration/shop spaces. Replace Sheet G-110 dated 21 January 2022 with attached revised Sheet G-110 dated 2 May 2022.

ITEM 01.3-4 Refer to attached Sheet G-120 – LIFE SAFETY PLAN – SECOND FLOOR, dated 2 May 2022:

A. Sheet G-120 is hereby revised and re-issued in its entirety to provide requirements for maintenance of existing fire rating at all walls between hangar bay and administration/shop spaces. Replace Sheet G-120 dated 21 January 2022 with attached revised Sheet G-120 dated 2 May 2022.

ITEM 01.3-5 Refer to attached Sheet SB101 – FOUNDATION AND SLAB PLAN, dated 2 May 2022:

A. Sheet SB101 is hereby revised and re-issued in its entirety to provide requirements for antenna (communications) tower and ice bridge of Bid Option. Replace Sheet SB101 dated 21 January 2022 with attached revised Sheet SB101

ITEM 01.3-6 Refer to attached Sheet SF102 – ROOF FRAMING PLAN, dated 2 May 2022:

A. Sheet SF102 is hereby revised and re-issued in its entirety to provide requirements for antenna (communications) tower and ice bridge of Bid Option; and to provide updated structural requirements due to clarification of the mechanical systems on the project. Replace Sheet SF102 dated 21 January 2022 with attached revised Sheet SF102 dated

ITEM 01.3-7 Refer to attached Sheet SF502 – ENLARGED FRAMING PLANS AND DETAILS – ROOF, dated 2 May 2022:

A. Sheet SF502 is hereby revised and re-issued in its entirety to provide additional requirements in Detail C4/SF502.

Replace Sheet SF502 dated 21 January 2022 with attached revised Sheet SF502 dated 2 May 2022.

ITEM 01.3-8 Refer to attached Sheet SF503 – ENLARGED FRAMING PLANS AND DETAILS – ELEVATOR ROOF, dated

A. Sheet SF503 is hereby revised and re-issued in its entirety to updated details to provide metal deck at elevator shaft lid. Replace Sheet SF503 dated 21 January 2022 with attached revised Sheet SF503 dated 2 May 2022.

ITEM 01.3-9 Refer to attached Sheet AD110 – COMPOSITE GROUND FLOOR DEMOLITION PLAN, dated 2 May 2022:

A. Sheet AD110 is hereby revised and re-issued in its entirety to provide additional clarification for demolition work to be performed. Replace Sheet AD110 dated 21 January 2022 with attached revised Sheet AD110 dated 2 May 2022.

ITEM 01.3-10 Refer to attached Sheet AD120 – COMPOSITE SECOND FLOOR DEMOLITION PLAN, dated 2 May 2022:

A. Sheet AD120 is hereby revised and re-issued in its entirety to provide additional clarification for demolition work to be performed. Replace Sheet AD120 dated 21 January 2022 with attached revised Sheet AD120 dated 2 May 2022.

ITEM 01.3-11 Refer to attached Sheet AD130 – COMPOSITE DEMOLITION ROOF PLAN, dated 2 May 2022:

A. Sheet AD130 is hereby revised and re-issued in its entirety to provide additional clarification for demolition work to be performed. Replace Sheet AD130 dated 21 January 2022 with attached revised Sheet AD130 dated 2 May 2022.

ITEM 01.3-12 Refer to attached Sheet A-110 – COMPOSITE GROUND FLOOR PLAN, dated 2 May 2022:

A. Sheet A-110 is hereby revised and re-issued in its entirety to provide room number for Conference Room, Room 106.1, and to provide updated background in Fire Protection, Room 144. Replace Sheet A-110 dated 21 January 2022 with attached revised Sheet A-110 dated 2 May 2022.

ITEM 01.3-13 Refer to attached Sheet A-111 – GROUND FLOOR PLAN SECTOR A, dated 2 May 2022:

A. Sheet A-111 is hereby revised and re-issued in its entirety to provide room number for Conference Room, Room 106.1. Replace Sheet A-111 dated 21 January 2022 with attached revised Sheet A-111 dated 2 May 2022.

ITEM 01.3-14 Refer to attached Sheet A-112 – GROUND FLOOR PLAN SECTOR B, dated 2 May 2022:

A. Sheet A-112 is hereby revised and re-issued in its entirety to provide room number for Conference Room, Room 106.1; to provide updated background in Fire Protection, Room 144; and to provide clarification of work in select areas. Replace Sheet A-112 dated 21 January 2022 with attached revised Sheet A-112 dated 2 May 2022.

ITEM 01.3-15 Refer to attached Sheet A-120 – COMPOSITE SECOND FLOOR PLAN, dated 2 May 2022:

A. Sheet A-120 is hereby revised and re-issued in its entirety to change Room 201 to Storage. Replace Sheet A-120 dated 21 January 2022 with attached revised Sheet A-120 dated 2 May 2022.

ITEM 01.3-16 Refer to attached Sheet A-121 – SECOND FLOOR PLAN SECTOR A, dated 2 May 2022:

A. Sheet A-121 is hereby revised and re-issued in its entirety to change Room 201 to Storage; and to provide updated requirements due to clarification of the mechanical systems on the project. Replace Sheet A-121 dated 21 January 2022 with attached revised Sheet A-121 dated 2 May 2022.

ITEM 01.3-17 Refer to attached Sheet A-122 – SECOND FLOOR PLAN SECTOR B, dated 2 May 2022:

A. Sheet A-122 is hereby revised and re-issued in its entirety to provide updated information in Mother’s Room, Room 204. Replace Sheet A-122 dated 21 January 2022 with attached revised Sheet A-122 dated 2 May 2022.

ITEM 01.3-18 Refer to attached Sheet A-130 – COMPOSITE ROOF PLAN, dated 2 May 2022:

A. Sheet A-130 is hereby revised and re-issued in its entirety to provide updated requirements due to clarification of the mechanical systems on the project. Replace Sheet A-130 dated 21 January 2022 with attached revised Sheet A-130

ITEM 01.3-19 Refer to attached Sheet A-132 – ROOF PLAN SECTOR B, dated 2 May 2022:

A. Sheet A-132 is hereby revised and re-issued in its entirety to provide updated information on roofing construction; to provide updated requirements due to clarification of the mechanical systems on the project; and to update keynotes for sunshades. Replace Sheet A-132 dated 21 January 2022 with attached revised Sheet A-132 dated 2 May 2022.

ITEM 01.3-20 Refer to attached Sheet AC110 – COMPOSITE GROUND FLOOR REFLECTED CEILING PLAN, dated

A. Sheet AC110 is hereby revised and re-issued in its entirety to provide updated information due to deletion of high-expansion foam systems on the project; and to provide updated lighting in select areas. Replace Sheet AC110 dated 21 January 2022 with attached revised Sheet AC110 dated 2 May 2022.

ITEM 01.3-21 Refer to attached Sheet AC111 – GROUND FLOOR REFLECTED CEILING PLAN SECTOR A, dated

A. Sheet AC111 is hereby revised and re-issued in its entirety to provide updated information due to deletion of high-expansion foam systems on the project; and to provide updated lighting in select areas. Replace Sheet AC111 dated 21 January 2022 with attached revised Sheet AC111 dated 2 May 2022.

ITEM 01.3-22 Refer to attached Sheet AC112 – GROUND FLOOR REFLECTED CEILING PLAN SECTOR B, dated

A. Sheet AC112 is hereby revised and re-issued in its entirety to provide updated information due to deletion of high-expansion foam systems on the project; and to update keynotes for sunshades. Replace Sheet AC112 dated 21 January 2022 with attached revised Sheet AC112 dated 2 May 2022.

ITEM 01.3-23 Refer to attached Sheet AC120 – COMPOSITE SECOND FLOOR REFLECTED CEILING PLAN, dated

A. Sheet AC120 is hereby revised and re-issued in its entirety to provide updated information due to deletion of high-expansion foam systems on the project; and to provide updated lighting in select areas. Replace Sheet AC120 dated 21 January 2022 with attached revised Sheet AC120 dated 2 May 2022.

ITEM 01.3-24 Refer to attached Sheet AC121 – SECOND FLOOR REFLECTED CEILING PLAN SECTOR A, dated

A. Sheet AC121 is hereby revised and re-issued in its entirety to provide updated information due to deletion of high-expansion foam systems on the project; and to change Room 201 to Storage. Replace Sheet AC121 dated 21 January 2022 with attached revised Sheet AC121 dated 2 May 2022.

ITEM 01.3-25 Refer to attached Sheet AC122 – SECOND FLOOR REFLECTED CEILING PLAN SECTOR B, dated

A. Sheet AC122 is hereby revised and re-issued in its entirety to provide updated information due to deletion of high-expansion foam systems on the project; and to provide updated lighting in select areas. Replace Sheet AC122 dated 21 January 2022 with attached revised Sheet AC122 dated 2 May 2022.

ITEM 01.3-26 Refer to attached Sheet A-201 – BUILDING ELEVATIONS, dated 2 May 2022:

Sheet A-201 is hereby revised and re-issued in its entirety to provide information on wall penetration for antenna tower into building as part of the Bid Option. Replace Sheet A-400 dated 21 January 2022 with attached revised Sheet A- 400 dated 2 May 2022.

ITEM 01.3-27 Refer to attached Sheet A-400 – ELEVATOR PLAN AND SECTIONS, dated 2 May 2022:

Sheet A-400 is hereby revised and re-issued in its entirety to change Room 201 to Storage. Replace Sheet A-400 dated 21 January 2022 with attached revised Sheet A-400 dated 2 May 2022.

ITEM 01.3-28 Refer to attached Sheet A-404 – INTERIOR ELEVATIONS, dated 2 May 2022:

Sheet A-404 is hereby revised and re-issued in its entirety to provide updated requirements for ceiling construction in

Detail A2/A-404 and Detail C1/A-404. Replace Sheet A-404 dated 21 January 2022 with attached revised Sheet A- 404 dated 2 May 2022.

ITEM 01.3-29 Refer to attached Sheet A-500 – DOOR AND WINDOW DETAILS, dated 2 May 2022:

Sheet A-500 is hereby revised and re-issued in its entirety to provide updated requirements for solid surface sill at window in Detail C1/A-500. Replace Sheet A-500 dated 21 January 2022 with attached revised Sheet A-500 dated 2 May 2022.

ITEM 01.3-30 Refer to attached Sheet A-602 – ROOM FINISH SCHEDULE, dated 2 May 2022:

Sheet A-602 is hereby revised and re-issued in its entirety to provide updated requirements for solid surface sill in Room Finish Schedule. Replace Sheet A-602 dated 21 January 2022 with attached revised Sheet A-602 dated 2 May 2022.

ITEM 01.3-31 Refer to attached Sheet A-603 – FINISH MATERIALS SCHEDULE AND DETAILS, dated 2 May 2022:

Sheet A-603 is hereby revised and re-issued in its entirety to provide updated requirements for location of solid surface sill in Casework Finishes Schedule. Replace Sheet A-603 dated 21 January 2022 with attached revised Sheet A-603

ITEM 01.3-32 Refer to attached Sheet IN500 – INTERIOR FINISH DETAILS, dated 2 May 2022:

Sheet IN500 is hereby revised and re-issued in its entirety to update title of Detail D2/IN500. Replace Sheet IN500 dated 21 January 2022 with attached revised Sheet IN500 dated 2 May 2022.

ITEM 01.3-33 Refer to attached Sheet IG112 – GROUND FLOOR SIGNAGE PLAN AREA ‘B’, dated 2 May 2022:

Sheet IG112 is hereby revised and re-issued in its entirety to provide updated signage requirements at door to Secure, Room 116. Replace Sheet IG112 dated 21 January 2022 with attached revised Sheet IG112 dated 2 May 2022.

ITEM 01.3-34 Refer to attached Sheet IG122 – SECOND FLOOR SIGNAGE PLAN AREA ‘B’, dated 2 May 2022:

Sheet IG122 is hereby revised and re-issued in its entirety to provide updated signage requirements at door to U.D.M. SIPR, Room 230. Replace Sheet IG122 dated 21 January 2022 with attached revised Sheet IG122 dated

ITEM 01.3-35 Refer to attached Sheet IG600 – SIGNAGE SCHEDULE, dated 2 May 2022:

Sheet IG600 is hereby revised and re-issued in its entirety to provide updated signage requirements for Secure, Room 116, and U.D.M. SIPR, Room 230. Replace Sheet IG600 dated 21 January 2022 with attached revised Sheet IG600 dated 2 May 2022.

ITEM 01.3-36 Refer to attached Sheet F-001 – FIRE PROTECTION LEGEND & ABBREVIATIONS AND FIRE ALARM AREA PLANS, dated 2 May 2022:

Sheet F-001 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire suppression systems on the project. Replace Sheet F-001 dated 21 January 2022 with attached revised Sheet F-001 dated 2 May 2022.

ITEM 01.3-37 Refer to attached Sheet FD401 – FIRE PROTECTION ROOM DEMOLITION PLAN, dated 2 May 2022:

Sheet FD401 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire suppression systems on the project. Replace Sheet FD401 dated 21 January 2022 with attached revised Sheet FD401 dated 2 May 2022.

ITEM 01.3-38 Refer to Sheet FX101 – GROUND FLOOR FIRE SUPPRESSION PLAN, dated 21 January 2022:

Sheet FX101 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FX101 dated 21 January 2022 from the contract documents.

ITEM 01.3-39 Refer to Sheet FX102 – SECOND FLOOR FIRE SUPPRESSION PLAN, dated 21 January 2022:

Sheet FX102 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FX102 dated 21 January 2022 from the contract documents.

ITEM 01.3-40 Refer to attached Sheet FX110 – GROUND FLOOR FIRE SUPPRESSION PLAN, dated 2 May 2022:

A. Sheet FX110 is hereby issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire suppression systems on the project.

ITEM 01.3-41 Refer to attached Sheet FX120 – SECOND FLOOR FIRE SUPPRESSION PLAN, dated 2 May 2022:

A. Sheet FX120 is hereby issued in its entirety to strike all requirements for high-expansion foam systems and to modify

ITEM 01.3-42 Refer to attached Sheet FX401 – FIRE PROTECTION ROOM ENLARGED PLAN AND SECTIONS, dated

Sheet FX401 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire suppression systems on the project. Replace Sheet FX401 dated 21 January 2022 with attached revised Sheet FX401 dated 2 May 2022.

ITEM 01.3-43 Refer to Sheet FX501 – FOAM SUPPRESSION SYSTEM DETAILS, dated 21 January 2022:

Sheet FX501 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FX501 dated 21 January 2022 from the contract documents.

ITEM 01.3-44 Refer to attached Sheet FX601 – FIRE SUPPRESSION SCHEMATIC DIAGRAMS, dated 2 May 2022:

Sheet FX601 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire suppression systems on the project. Replace Sheet FX601 dated 21 January 2022 with attached revised Sheet FX601 dated 2 May 2022.

ITEM 01.3-45 Refer to Sheet FA101 – GROUND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR A, dated

Sheet FA101 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FA101 dated 21 January 2022 from the contract documents.

ITEM 01.3-46 Refer to Sheet FA102 – GROUND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR B, dated

Sheet FA102 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FA102 dated 21 January 2022 from the contract documents.

ITEM 01.3-47 Refer to Sheet FA103 – SECOND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR A, dated

Sheet FA103 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FA103 dated 21 January 2022 from the contract documents.

ITEM 01.3-48 Refer to Sheet FA104 – SECOND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR B, dated

Sheet FA104 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FA104 dated 21 January 2022 from the contract documents.

ITEM 01.3-49 Refer to attached Sheet FA111 – GROUND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR A, dated 2 May 2022:

A. Sheet FA111 is hereby issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire alarm and mass notification systems on the project.

ITEM 01.3-50 Refer to attached Sheet FA112 – GROUND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN – SECTOR B, dated 2 May 2022:

A. Sheet FA112 is hereby issued in its entirety to strike all requirements for high-expansion foam systems and to modify

ITEM 01.3-51 Refer to attached Sheet FA121 – SECOND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN –

A. Sheet FA121 is hereby issued in its entirety to strike all requirements for high-expansion foam systems and to modify

ITEM 01.3-52 Refer to attached Sheet FA122 – SECOND FLOOR FIRE ALARM & MASS NOTIFICATION PLAN –

A. Sheet FA122 is hereby issued in its entirety to strike all requirements for high-expansion foam systems and to modify

ITEM 01.3-53 Refer to attached Sheet FA601 – FIRE ALARM RISER DIAGRAM, dated 2 May 2022:

Sheet FA601 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire alarm systems on the project. Replace Sheet FA601 dated 21 January 2022 with attached revised Sheet FA601 dated 2 May 2022.

ITEM 01.3-54 Refer to attached Sheet FA701 – FIRE ALARM & MASS NOTIFICATION INPUT/OUTPUT MATRIX, dated

Sheet FA701 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for fire alarm and mass notification systems on the project. Replace Sheet FA701 dated 21 January 2022 with attached revised Sheet FA701 dated 2 May 2022.

ITEM 01.3-55 Refer to Sheet FC101 – HEF & PREACTION RELEASING SYSTEM PLAN, dated 21 January 2022:

Sheet FC101 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FC101 dated 21 January 2022 from the contract documents.

ITEM 01.3-56 Refer to attached Sheet FC110 – PREACTION RELEASING SYSTEM PLAN, dated 2 May 2022:

A. Sheet FC110 is hereby issued in its entirety to strike all requirements for high-expansion foam systems and to modify

ITEM 01.3-57 Refer to Sheet FC501 – FOAM CONTROL SYSTEM DETAILS, dated 21 January 2022:

Sheet FC501 is hereby deleted in its entirety to strike all requirements for high-expansion foam systems on the project.

Remove Sheet FC501 dated 21 January 2022 from the contract documents.

ITEM 01.3-58 Refer to attached Sheet FC601 – RELEASING SYSTEM RISER DIAGRAM, dated 2 May 2022:

Sheet FC601 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for releasing systems on the project. Replace Sheet FC601 dated 21 January 2022 with attached revised Sheet FC601 dated 2 May 2022.

ITEM 01.3-59 Refer to attached Sheet FC701 – RELEASING SYSTEM CONTROLS INPUT/OUTPUT MATRIX, dated

Sheet FC701 is hereby revised and re-issued in its entirety to strike all requirements for high-expansion foam systems and to modify requirements for releasing systems on the project. Replace Sheet FC701 dated 21 January 2022 with attached revised Sheet FC701 dated 2 May 2022.

ITEM 01.3-60 Refer to attached Sheet P-111 – GROUND FLOOR PLUMBING PLAN SECTOR A, dated 2 May 2022:

Sheet P-111 is hereby revised and re-issued in its entirety to provide updated requirements at Service Elevator, SE001.

Replace Sheet P-111 dated 21 January 2022 with attached revised Sheet P-111 dated 2 May 2022.

ITEM 01.3-61 Refer to attached Sheet M-001 – LEGEND & ABBREVIATIONS, dated 2 May 2022:

Sheet M-001 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-001 dated 21 January 2022 with attached revised Sheet M-001 dated

ITEM 01.3-62 Refer to attached Sheet MD101 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-A, dated

Sheet MD101 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MD101 dated 21 January 2022 with attached revised Sheet MD101 dated

ITEM 01.3-63 Refer to attached Sheet MD102 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-B, dated

Sheet MD102 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MD102 dated 21 January 2022 with attached revised Sheet MD102 dated

ITEM 01.3-64 Refer to attached Sheet MD201 – MECHANICAL DEMOLITION PLAN-SECOND FLOOR-SECTOR-A, dated

Sheet MD201 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MD201 dated 21 January 2022 with attached revised Sheet MD201 dated

ITEM 01.3-65 Refer to attached Sheet MD202 – MECHANICAL DEMOLITION PLAN-SECOND FLOOR-SECTOR-B, dated

Sheet MD202 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MD202 dated 21 January 2022 with attached revised Sheet MD202 dated

ITEM 01.3-66 Refer to attached Sheet MD301 – MECHANICAL DEMOLITION PLAN-ROOF-SECTOR-A, dated

Sheet MD301 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MD301 dated 21 January 2022 with attached revised Sheet MD301 dated

ITEM 01.3-67 Refer to attached Sheet MD302 – MECHANICAL DEMOLITION PLAN-ROOF-SECTOR-B, dated

Sheet MD302 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MD302 dated 21 January 2022 with attached revised Sheet MD302 dated

ITEM 01.3-68 Refer to attached Sheet MH101 – MECHANICAL HVAC PLAN-FIRST FLOOR-SECTOR-A, dated

Sheet MH101 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MH101 dated 21 January 2022 with attached revised Sheet MH101 dated

ITEM 01.3-69 Refer to attached Sheet MH102 – MECHANICAL HVAC PLAN-FIRST FLOOR-SECTOR-B, dated

Sheet MH102 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MH102 dated 21 January 2022 with attached revised Sheet MH102 dated

ITEM 01.3-70 Refer to attached Sheet MH201 – MECHANICAL HVAC PLAN-SECOND FLOOR-SECTOR-A, dated

Sheet MH201 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MH201 dated 21 January 2022 with attached revised Sheet MH201 dated

ITEM 01.3-71 Refer to attached Sheet MH202 – MECHANICAL HVAC PLAN-SECOND FLOOR-SECTOR-B, dated

Sheet MH202 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MH202 dated 21 January 2022 with attached revised Sheet MH202 dated

ITEM 01.3-72 Refer to attached Sheet MH301 – MECHANICAL HVAC PLAN-ROOF-SECTOR-A, dated 2 May 2022:

Sheet MH301 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MH301 dated 21 January 2022 with attached revised Sheet MH301 dated

ITEM 01.3-73 Refer to attached Sheet MH302 – MECHANICAL HVAC PLAN-ROOF-SECTOR-B, dated 2 May 2022:

Sheet MH302 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MH302 dated 21 January 2022 with attached revised Sheet MH302 dated

ITEM 01.3-74 Refer to attached Sheet MP101 – MECHANICAL PIPING PLAN-FIRST FLOOR-SECTOR-A, dated

Sheet MP101 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MP101 dated 21 January 2022 with attached revised Sheet MP101 dated

ITEM 01.3-75 Refer to attached Sheet MP102 – MECHANICAL PIPING PLAN-FIRST FLOOR-SECTOR-B, dated

Sheet MP102 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MP102 dated 21 January 2022 with attached revised Sheet MP102 dated

ITEM 01.3-76 Refer to attached Sheet MP201 – MECHANICAL PIPING PLAN-SECOND FLOOR-SECTOR-A, dated

Sheet MP201 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MP201 dated 21 January 2022 with attached revised Sheet MP201 dated

ITEM 01.3-77 Refer to attached Sheet MP202 – MECHANICAL PIPING PLAN-SECOND FLOOR-SECTOR-B, dated

Sheet MP202 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet MP202 dated 21 January 2022 with attached revised Sheet MP202 dated

ITEM 01.3-78 Refer to attached Sheet M-301 – SECTIONS/ENLARGED VIEWS, dated 2 May 2022:

Sheet M-301 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-301 dated 21 January 2022 with attached revised Sheet M-301 dated

ITEM 01.3-79 Refer to attached Sheet M-501 – DETAILS, dated 2 May 2022:

Sheet M-501 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-501 dated 21 January 2022 with attached revised Sheet M-501 dated

ITEM 01.3-80 Refer to attached Sheet M-502 – DETAILS, dated 2 May 2022:

Sheet M-502 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-502 dated 21 January 2022 with attached revised Sheet M-502 dated

ITEM 01.3-81 Refer to attached Sheet M-601 – FLOW DIAGRAMS, dated 2 May 2022:

Sheet M-601 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-601 dated 21 January 2022 with attached revised Sheet M-601 dated

ITEM 01.3-82 Refer to attached Sheet M-602 – FLOW DIAGRAMS, dated 2 May 2022:

Sheet M-602 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-602 dated 21 January 2022 with attached revised Sheet M-602 dated

ITEM 01.3-83 Refer to attached Sheet M-701 – SCHEDULES, dated 2 May 2022:

Sheet M-701 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-701 dated 21 January 2022 with attached revised Sheet M-701 dated

ITEM 01.3-84 Refer to attached Sheet M-702 – SCHEDULES, dated 2 May 2022:

Sheet M-702 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-702 dated 21 January 2022 with attached revised Sheet M-702 dated

ITEM 01.3-85 Refer to attached Sheet M-801 – CONTROLS, dated 2 May 2022:

Sheet M-801 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-801 dated 21 January 2022 with attached revised Sheet M-801 dated

ITEM 01.3-86 Refer to attached Sheet M-802 – CONTROLS, dated 2 May 2022:

Sheet M-802 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-802 dated 21 January 2022 with attached revised Sheet M-802 dated

ITEM 01.3-87 Refer to attached Sheet M-803 – CONTROLS, dated 2 May 2022:

Sheet M-803 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-803 dated 21 January 2022 with attached revised Sheet M-803 dated

ITEM 01.3-88 Refer to attached Sheet M-804 – CONTROLS, dated 2 May 2022:

Sheet M-804 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-804 dated 21 January 2022 with attached revised Sheet M-804 dated

ITEM 01.3-89 Refer to attached Sheet M-805 – CONTROLS, dated 2 May 2022:

Sheet M-805 is hereby revised and re-issued in its entirety to provide clarification for all requirements of the mechanical systems on the project. Replace Sheet M-805 dated 21 January 2022 with attached revised Sheet M-805 dated

ITEM 01.3-90 Refer to attached Sheet E-001 – LEGEND, ABBREVIATIONS, & MOUNTING HEIGHT DETAIL, dated

Sheet E-001 is hereby revised and re-issued in its entirety to provide updated requirements for switches and receptacles to Detail A1/E-001. Replace Sheet E-001 dated 21 January 2022 with attached revised Sheet E-001 dated 2 May 2022.

ITEM 01.3-91 Refer to attached Sheet EG101 – ELECTRICAL GROUNDING PLAN, dated 2 May 2022:

Sheet EG101 is hereby revised and re-issued in its entirety to provide updated grounding requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EG101 dated 21 January 2022 with attached revised Sheet EG101 dated 2 May 2022.

ITEM 01.3-92 Refer to attached Sheet EG103 – LIGHTNING PROTECTION PLAN, dated 2 May 2022:

Sheet EG103 is hereby revised and re-issued in its entirety to provide updated grounding requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EG103 dated 21 January 2022 with attached revised Sheet EG103 dated 2 May 2022.

ITEM 01.3-93 Refer to attached Sheet EG502 – GROUNDING AND LIGHTNING PROTECTION DETAILS, dated

Sheet EG502 is hereby revised and re-issued in its entirety to provide updated grounding requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EG502 dated 21 January 2022 with attached revised Sheet EG502 dated 2 May 2022.

ITEM 01.3-94 Refer to attached Sheet EP110 – GROUND FLOOR MECHANICAL POWER PLAN, dated 2 May 2022:

Sheet EP110 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP110 dated 21 January 2022 with attached revised Sheet EP110 dated 2 May 2022.

ITEM 01.3-95 Refer to attached Sheet EP111 – ELECTRICAL FIRST FLOOR POWER PLAN – SECTOR A, dated

Sheet EP111 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP111 dated 21 January 2022 with attached revised Sheet EP111 dated 2 May 2022.

ITEM 01.3-96 Refer to attached Sheet EP112 – ELECTRICAL FIRST FLOOR POWER PLAN – SECTOR B, dated

Sheet EP112 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP112 dated 21 January 2022 with attached revised Sheet EP112 dated 2 May 2022.

ITEM 01.3-97 Refer to attached Sheet EP120 – SECOND FLOOR MECHANICAL POWER PLAN, dated 2 May 2022:

Sheet EP120 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP120 dated 21 January 2022 with attached revised Sheet EP120 dated 2 May 2022.

ITEM 01.3-98 Refer to attached Sheet EP121 – ELECTRICAL SECOND FLOOR POWER PLAN – SECTOR A, dated

Sheet EP121 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP121 dated 21 January 2022 with attached revised Sheet EP121 dated 2 May 2022.

ITEM 01.3-99 Refer to attached Sheet EP122 – ELECTRICAL SECOND FLOOR POWER PLAN – SECTOR B, dated

Sheet EP122 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP122 dated 21 January 2022 with attached revised Sheet EP122 dated 2 May 2022.

ITEM 01.3-100 Refer to attached Sheet EP131 – ELECTRICAL ROOF POWER PLAN – SECTOR A, dated 2 May 2022:

Sheet EP131 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP131 dated 21 January 2022 with attached revised Sheet EP131 dated 2 May 2022.

ITEM 01.3-101 Refer to attached Sheet EP401 – ELECTRICAL ENLARGED PLANS, dated 2 May 2022:

Sheet EP401 is hereby revised and re-issued in its entirety to provide updated power requirements due to deletion of high-expansion foam systems and clarification of the mechanical systems on the project. Replace Sheet EP401 dated 21 January 2022 with attached revised Sheet EP401 dated 2 May 2022.

ITEM 01.3-102 Refer to attached Sheet EP601 –…

This is the start of the file's text. The full file is on GovTribe.