ATTACHMENT 20 - FSB2020-332-00_WI-ANG_B400 AMXS_ADD NO. 02_2022.05.06.pdf

PDF 3 MB Posted

Attached to
CONSTRUCT F-35 ALTER BUILDING 400 AMXS
Solicitation number
W50S9F-22-R-0006
Issued by

About this file

This is a solicitation for a firm fixed-price construction contract to alter Building 400 at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The scope of work includes demolishing and rebuilding administration and maintenance areas, adding two elevators, and upgrading power, HVAC, fire suppression, and fall protection systems to accommodate F-35 operations. The project also involves a partial roof replacement and upgrades to the lightning protection system. The base award includes work in CLIN 0001, with options for communication tower work in CLIN 0004 and aircraft power work in CLIN 0005. The contract duration is 450 days from notice to proceed. The solicitation closing date is May 5, 2022. The evaluation factors are technical, past performance, and price, with award intended without discussions. The document identifies brands required and provides information on a pre-proposal site visit.

View the file

Other files

File Type Posted
Questions and Answers 7.pdf PDF
ATTACHMENT 21 - FSB2020-332-00_WI-ANG_B400 AMXS_ADD NO. 03_2022.05.12.pdf PDF
W50S9F22R0006 Solicitation Amendment 0005.pdf PDF
Questions and Answers 6.pdf PDF
Questions and Answers 5.pdf PDF
ATTACHMENT 18 - 01_FSB2020-332-00_WI-ANG_B400_ADD NO. 02_2022.05.06_Narrative.pdf PDF
ATTACHMENT 19 - FSB2020-332-00 - WI-ANG - B400 AMXS - Type B-3 Addendum 002 COMBINED DRAWINGS.pdf PDF
W50S9F22R0006 Solicitation Amendment 0004.pdf PDF
W50S9F22R0006 Solicitation Amendment 0003.pdf PDF
ATTACHMENT 17 - Addendum No. 01 Updated CD Specifications (Affected Specifications Only).pdf PDF
ATTACHMENT 16 - Addendum No. 01 Updated CD Plans (Affected Sheets Only).pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE - Rev 1.docx DOCX document
ATTACHMENT 15 - Addendum No. 01 Narrative.pdf PDF
Questions and Answers 4.pdf PDF
W50S9F22R0006 Solicitation Amendment 0002.pdf PDF
Questions and Answers 3.pdf PDF
Questions and Answers 2.pdf PDF
Pre-Proposal Attendee Sign In Sheet.pdf PDF
B.07.Pre-Proposal Slides - F-35 B400 AMXS.pptx PPTX presentation
Supplemental Site Visit Instructions.pdf PDF
W50S9F22R0006 Solicitation Amendment 0001.pdf PDF
Questions and Answers 1.pdf PDF
Amendment 0001 Summary of Changes.pdf PDF
SAF_IE memo dtd 211116 - Sundown Policy for Foam Fire Supression Systems.pdf PDF
ATTACHMENT 01 - Volume 2 - WI ANG F-35 B400 ATFP Type B-3.pdf PDF
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT G SUBCONTRACTING PLAN FORMAT.docx DOCX document
ATTACHMENT 12 - XGFG182009 SAP Single Source Determination_Andover.pdf PDF
ATTACHMENT 11 - XGFG182009 SAP Single Source Determination_Advantor.pdf PDF
ATTACHMENT 06 - XGFG182009 F-35 Alter B400 AMXS - Asbestos LBP Hazmat Assessment.pdf PDF
ATTACHMENT 02 - Volume 4 - WI ANG F-35 B400 Final CD Specs Type B-3 (1 of 2) updated.pdf PDF
ATTACHMENT 07 - XGFG182009 F-35 Alter B400 AMXS - Material Management Plan PFAS.pdf PDF
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 04 - Volume 6 - WI ANG F-35 B400 GBCI Type B-3.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
ATTACHMENT 09 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 05 - FSB2020-332-00 - WI-ANG - B400 AMXS - COMBINED DRAWINGS.pdf PDF
W50S9F22R0006 Solicitation 21 Mar 22.pdf PDF
ATTACHMENT 13 - XGFG182009 SAP Single Source Determination_MBS.pdf PDF
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 03 - Volume 4 - WI ANG F-35 B400 Final CD Specs Type B-3 (2 of 2).pdf PDF
ATTACHMENT 14 - XGFG182009 SAP Single Source Determination_Monaco.pdf PDF
ATTACHMENT 08 - XGFG182009 F-35 Alter B400 AMXS - Site Characterization Report.pdf PDF
ATTACHMENT 10 - PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

h:\prj\2020\20203320\08-submissions\2022_05_06_add 2\fsb2020-332-00_wi-ang_b400_add no. 02_2022.05.06_narrative.docx Page 1 of 4

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

ADDENDUM NO. 02

Date: 6 May 2022

To: ALL BIDDERS OF RECORD

From: Frankfurt-Short-Bruza Associates, P.C.

5801 N. Broadway Ext., Suite 500 Oklahoma City, OK 73118

Subject: XGFG182009: F-35: Alter Building 400 AMXS, WI/ANG, Truax Field, Madison, WI

FSB Project No.: FSB2020-332-00

NOTE: This Addendum forms a part of the Contract Documents and modifies the Original Documents dated 21 January 2022.

Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

ATTACHMENTS

Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of (4) pages and the following attachments:

Specifications:

PROJECT TABLE OF CONTENTS

01 14 00 – WORK RESTRICTIONS

01 32 01.00 10 – PROJECT SCHEDULE

01 91 00.15 10 – TOTAL BUILDING COMMISSIONING

03 30 00 – CAST-IN-PLACE CONCRETE

09 65 00 – RESILIENT FLOORING

Drawings:

SB101 – FOUNDATION AND SLAB PLAN

SF102 – ROOF FRAMING PLAN

AD200 – BUILDING ELEVATIONS - DEMOLITION

A-500 – DOOR AND WINDOW DETAILS

A-501 – ROOF DETAILS

MD101 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-A

MD102 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-B

MD202 – MECHANICAL DEMOLITION PLAN-SECOND FLOOR-SECTOR-B

EP111 – ELECTRICAL FIRST FLOOR POWER PLAN – SECTOR A

EP601 – ELECTRICAL POWER ONE-LINE DIAGRAM

FSB | DefineDesignDeliver

MODIFICATIONS TO THE CONDITIONS OF THE CONTRACT

None.

MODIFICATIONS TO THE SPECIFICATIONS

ITEM 01.2-1 Refer to attached Project Table of Contents, dated 6 May 2022:

A. Project Table of Contents is hereby revised and re-issued in its entirety to incorporate changes noted as part of this Addendum related to specifications included on the project. Replace Project Table of Contents dated 2 May 2022 with attached revised Project Table of Contents dated 6 May 2022.

ITEM 01.2-2 Refer to attached Specification Section 01 14 00 – WORK RESTRICTIONS, dated 6 May 2022:

A. Specification Section 01 14 00 is hereby revised and re-issued in its entirety to reduce requirements for application of work outside regular hours from 15 calendar days to 5 calendar days in Subpart 1.3.3 Work Outside Regular Hours;

to strike last sentence related to utility cutovers in Subpart 1.3.3 Work Outside Regular Hours; and to revise list item ‘a’ in Subpart 1.3.4 Utility Cutovers and Interruptions. Replace Section 01 14 00 dated 2 May 2022 with attached revised Specification Section 01 14 00 dated 6 May 2022.

ITEM 01.2-3 Refer to attached Specification Section 01 32 01.00 10 – PROJECT SCHEDULE, dated 6 May 2022:

A. Specification Section 01 32 01.00 10 is hereby revised and re-issued in its entirety to provide updated requirements for timing of the submission of Preliminary Project Schedule in Subpart 3.4.1. Replace Section 01 32 01.00 10 dated 2 May 2022 with attached revised Specification Section 01 32 01.00 10 dated 6 May 2022.

ITEM 01.2-4 Refer to Specification Section 01 91 00.15 – TOTAL BUILDING COMMISSIONING, dated 21 January 2022:

A. Specification Section 01 91 00.15 is hereby deleted in its entirety to strike all requirements included in this specification from the project. Remove Section 01 91 00.15 dated 21 January 2022 from the contract documents.

ITEM 01.2-5 Refer to attached Specification Section 01 91 00.15 10 – TOTAL BUILDING COMMISSIONING, dated 6 May 2022:

A. Specification Section 01 91 00.15 10 is hereby issued in its entirety to provide requirements for building commissioning on the project.

ITEM 01.2-6 Refer to attached Specification Section 03 30 00 – CAST-IN-PLACE CONCRETE, dated 6 May 2022:

A. Specification Section 03 30 00 is hereby revised and re-issued in its entirety to modify requirements for concrete mix design strength in Subpart 2.3.1.5; to provide an allowance for the use of Class C fly ash in place of Class F fly ash in Subpart 2.4.1.1; to provide an allowance for the use of Type 1L blended cement in Subpart 2.4.1.6; and to provide an allowance for the use of aggregates that meet WisDOT standards and requirements for expansion in Subpart 2.4.3.

Replace Section 03 30 00 dated 21 January 2022 with attached revised Specification Section 03 30 00 dated 6 May 2022.

ITEM 01.2-7 Refer to attached Specification Section 09 65 00 – RESILIENT FLOORING, dated 6 May 2022:

A. Specification Section 09 65 00 is hereby revised and re-issued in its entirety to provide updated requirement for wall-base type in Subpart 2.2 Wall Base. Replace Section 09 65 00 dated 21 January 2022 with attached revised Specification Section 09 65 00 dated 6 May 2022.

MODIFICATIONS TO THE DRAWINGS

ITEM 01.3-1 Refer to attached Sheet SB101 – FOUNDATION AND SLAB PLAN, dated 6 May 2022:

A. Sheet SB101 is hereby revised and re-issued in its entirety to remove “BY OTHERS” language from callout for antenna tower. Replace Sheet SB101 dated 2 May 2022 with attached revised Sheet SB101 dated 6 May 2022.

ITEM 01.3-2 Refer to attached Sheet SF102 – ROOF FRAMING PLAN, dated 6 May 2022:

A. Sheet SF102 is hereby revised and re-issued in its entirety to remove “BY OTHERS” language from callout for antenna tower. Replace Sheet SF102 dated 2 May 2022 with attached revised Sheet SF102 dated 6 May 2022.

ITEM 01.3-3 Refer to attached Sheet AD200 – BUILDING ELEVATIONS – DEMOLITION, dated 6 May 2022:

A. Sheet AD200 is hereby revised and re-issued in its entirety to provide additional clarification on mechanical components to be included in demolition and requirements for infill of areas affected by demolition of mechanical components. Replace Sheet AD200 dated 21 January 2022 with attached revised Sheet AD200 dated 6 May 2022.

ITEM 01.3-4 Refer to attached Sheet A-500 – DOOR AND WINDOW DETAILS, dated 6 May 2022:

A. Sheet A-500 is hereby revised and re-issued in its entirety to provide Detail C4/A-500 that includes requirements for infill of areas affected by demolition of mechanical components. Replace Sheet A-500 dated 2 May 2022 with attached revised Sheet A-500 dated 6 May 2022.

ITEM 01.3-5 Refer to attached Sheet A-501 – ROOF DETAILS, dated 6 May 2022:

A. Sheet A-501 is hereby revised and re-issued in its entirety to provide Detail C3/A-501 that includes requirements for skylight curbs. Replace Sheet A-501 dated 21 January 2022 with attached revised Sheet A-501 dated 6 May 2022.

ITEM 01.3-6 Refer to attached Sheet MD101 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-A, dated

A. Sheet MD101 is hereby revised and re-issued in its entirety to provide additional clarification on mechanical components to be included in demolition. Replace Sheet MD101 dated 2 May 2022 with attached revised Sheet MD101 dated 6 May 2022.

ITEM 01.3-7 Refer to attached Sheet MD102 – MECHANICAL DEMOLITION PLAN-FIRST FLOOR-SECTOR-B, dated

A. Sheet MD102 is hereby revised and re-issued in its entirety to provide additional clarification on mechanical components to be included in demolition. Replace Sheet MD102 dated 2 May 2022 with attached revised Sheet MD102

ITEM 01.3-8 Refer to attached Sheet MD202 – MECHANICAL DEMOLITION PLAN-SECOND FLOOR-SECTOR-B, dated

A. Sheet MD202 is hereby revised and re-issued in its entirety to provide additional clarification on mechanical components to be included in demolition. Replace Sheet MD202 dated 2 May 2022 with attached revised Sheet MD202

ITEM 01.3-9 Refer to attached Sheet EP111 – ELECTRICAL FIRST FLOOR POWER PLAN – SECTOR A, dated

A. Sheet EP111 is hereby revised and re-issued in its entirety to provide additional clarification on Optional Line Item (OLI) #2 included in Sheet Keynote 8. Replace Sheet EP111 dated 2 May 2022 with attached revised Sheet EP111

ITEM 01.3-10 Refer to attached Sheet EP601 – ELECTRICAL POWER ONE-LINE DIAGRAM, dated 6 May 2022:

A. Sheet EP601 is hereby revised and re-issued in its entirety to provide additional clarification on Optional Line Item

(OLI) #2 included in Sheet Keynote 6. Replace Sheet EP601 dated 2 May 2022 with attached revised Sheet EP601

BIDDER RFI RESPONSES

ITEM 01.4-1 Refer to attached document – BID RFI QUESTIONS AND RESPONSES, dated 6 May 2022, for responses to Bid RFI Questions received by the A/E as of 4 May 2022.

SUSTITUTION REQUESTS

None.

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

GENE O.

BROWN

E-47748

OKLAHOMA CITY

OK

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

JOHN B.

SEMTNER

E-47742

OKLAHOMA CITY

OK

5/6/2022

W

IS C O NS IN

P R

O F

E

S S I O N A L

E N G

I N E

E R

JOHN T

LITTLE

E-47833

EDMOND

OK

W

IS C O NS IN

A R C H I T E C T

JASON T.

HOLUBY

A-13101

OKLAHOMA CITY

OK

ANG/WI - F-35: Alter Building 400 AMXS 20203320F35B400 Addendum No. 02 6 May 2022

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 10 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

DI VI SI ON 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 UNIT MASONRY

DI VI SI ON 05 - METALS

05 05 20.00 27 POST-INSTALLED CONCRETE AND MASONRY ANCHORS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

PROJECT TABLE OF CONTENTS Page 1

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 33 13 COILING COUNTER DOORS

08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES

08 60 45 SKYLIGHTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 87 35 ARCHITECTURAL WINDOW FILM

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 06 00 SCHEDULES FOR FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 54 36 SUSPENDED DECORATIVE GRIDS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM

09 68 00 CARPETING

09 77 20 FIBERGLASS REINFORCED WALL PANELS

09 84 20 ACOUSTICAL WALL AND CEILINGPANELS

09 90 00 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 39 FOLDING PANEL PARTITIONS

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

10 51 00 CELL PHONE LOCKERS

10 51 13 METAL LOCKERS

10 53 00 MANUFACTURED CANOPY

DI VI SI ON 12 - FURNI SHI NGS

12 24 13 ROLLER WINDOW SHADES

DI VI SI ON 14 - CONVEYI NG EQUI PMENT

14 21 23 ELECTRIC TRACTION PASSENGER AND SERVICE ELEVATORS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

PROJECT TABLE OF CONTENTS Page 2

21 13 18 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBING, GENERAL PURPOSE

22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 48.19 BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 31 13.00 40 METAL DUCTS

23 34 23.00 40 HVAC POWER VENTILATORS

23 36 00.00 40 AIR TERMINAL UNITS

23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES

23 52 00 HEATING BOILERS

23 74 33.00 40 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP

AIR-CONDITIONERS

23 75 15 CUSTOM-PACKAGED, AIRCRAFT PRE-CONDITIONED AIR UNITS

23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS

23 82 00.00 20 TERMINAL HEATING UNITS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.01 CYBERSECURITY FOR LOW IMPACT HVAC CONTROL SYSTEMS

25 05 11.02 CYBERSECURITY FOR LOW IMPACT PORTABLE GENERATOR LOAD BANK

CONNECTION CABINET CONTROL SYSTEMS

25 05 11.03 CYBERSECURITY FOR LOW IMPACT SWITCH GEAR AUTOMATION

CONTROL SYSTEMS

25 05 11.04 CYBERSECURITY FOR LOW IMPACT FIRE PROTECTION/MASS

NOTIFICATION SYSTEM FACILITY-RELATEDCONTROL SYSTEMS

25 05 11.05 CYBERSECURITY FOR LOW IMPACT ACCESS CONTROL SYSTEM AND

INTRUSION DETECTION SYSTEM FACILITY-RELATED CONTROL

SYSTEMS

25 05 11.06 CYBERSECURITY FOR LOW IMPACT CCTV SYSTEM FACILITY-RELATED

CONTROL SYSTEMS

25 05 11.07 CYBERSECURITY FOR LOW IMPACT ELECTRICAL METERING AND

NETWORK LIGHTING CONTROLS FACILITY-RELATED CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 05 19.10 10 INSULATED WIRE AND CABLE

26 05 26.00 40 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 13.10 30 ELECTRIC METERS

PROJECT TABLE OF CONTENTS Page 3

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 35 44 270 VDC SOLID STATE CONVERTER

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 20 BASE COURSE FOR SIDEWALK

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION 01 14 00

WORK RESTRICTIONS

11/ 11, CHG 12: 05/ 21

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.1.1 Employee List

The Contractor must provide to the Contracting Officer, in writing, the names of two designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract.

1.3.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

SECTION 01 14 00 Page 1

1.3.2 Working Hours

Regular working hours will consist of a 10 hour period established by the Contracting Officer, sometime between 0 600 and 1 700, Monday through Friday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 5 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.3.4 Utility Cutovers and Interruptions

a. Coordinate utility cutovers and interruptions a minimum of 5 working days prior to execution to minimize effect on Base operations.

Scheduling outages must be pre-coordinated and approved by the Government. If on a non-duty day, conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and data/communications are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to 8 hours. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 14 00 Page 2

SECTION 01 32 01.00 10

PROJECT SCHEDULE

02/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AACE INTERNATIONAL (AACE)

AACE 29R-03 (2011) Forensic Schedule Analysis

AACE 52R-06 (2006) Time Impact Analysis - As Applied in Construction

U.S. ARMY CORPS OF ENGINEERS (USACE)

ER 1-1-11 (1995) Administration -- Progress, Schedules, and Network Analysis Systems

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING .

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Project Scheduler Qualifications ; G

Preliminary Project Schedule ; G

Initial Project Schedule ; G

Periodic Schedule Update ; G

1.3 PROJECT SCHEDULER QUALIFICATIONS

Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 2-years experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application.

SECTION 01 32 01.00 10 Page 1

PART 2 PRODUCTS

2.1 SOFTWARE

The scheduling software utilized to produce and update the schedules required herein must be capable of meeting all requirements of this specification.

2.1.1 Government Default Software

The Government intends to use Primavera P6.

2.1.2 Contractor Software

Scheduling software used by the contractor must be commercially available from the software vendor for purchase with vendor software support agreements available. The software routine used to create the required sdef file must be created and supported by the software manufacturer.

2.1.2.1 Primavera

If Primavera P6 is selected for use, provide the "xer" export file in a version of P6 importable by the Government system.

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules.

Prepare each Project Schedule using the Precedence Diagram Method (PDM).

3.2 BASIS FOR PAYMENT AND COST LOADING

The schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment. The aggregate value of all activities coded to a contract CLIN must equal the value of the CLIN.

3.2.1 Activity Cost Loading

Activity cost loading must be reasonable and without front-end loading.

Provide additional documentation to demonstrate reasonableness if requested by the Contracting Officer.

3.2.2 Withholdings / Payment Rejection

Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.

SECTION 01 32 01.00 10 Page 2

In the event that the Contracting Officer directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the Contracting Officer may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.

3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS

3.3.1 Level of Detail Required

Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:

3.3.2 Activity Durations

Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods.

Less than 2 percent of all non-procurement activities may have Original Durations (OD) greater than 20 work days or 30 calendar days.

3.3.3 Procurement Activities

Include activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days.

3.3.4 Mandatory Tasks

Include the following activities/tasks in the initial project schedule and all updates.

a. Submission, review and acceptance of SD-01 Preconstruction Submittals (individual activity for each).

b. Long procurement activities

c. Submission and approval of O & M manuals.

d. Submission and approval of as-built drawings.

e. Submission and approval of DD1354 data and installed equipment lists.

f. Submission and approval of testing and air balance (TAB).

g. Submission of TAB specialist design review report.

h. Submission and approval of fire protection specialist.

i. Submission and approval of Building Commissioning Plan, test data, and reports: Develop the schedule logic associated with testing and commissioning of mechanical systems to a level of detail consistent with the contract commissioning requirements. All tasks associated

SECTION 01 32 01.00 10 Page 3 with all building testing and commissioning will be completed prior to submission of building commissioning report and subsequent contract completion.

j. Air and water balancing.

k. Building commissioning - Functional Performance Testing.

l. Controls testing plan submission.

m. Controls testing.

n. Performance Verification testing.

o. Other systems testing, if required.

p. Contractor's pre-final inspection.

q. Correction of punch list from Contractor's pre-final inspection.

r. Government's pre-final inspection.

s. Correction of punch list from Government's pre-final inspection.

t. Final inspection.

3.3.5 Government Activities

Show Government and other agency activities that could impact progress.

These activities include, but are not limited to: approvals, acceptance, inspections, utility tie-in, and Notice to Proceed (NTP).

3.3.6 Standard Activity Coding Dictionary

Use the activity coding structure defined in the Standard Data Exchange Format (SDEF) in ER 1-1-11 . This exact structure is mandatory. Develop and assign all Activity Codes to activities as detailed herein. A template SDEF compatible schedule backup file is available on the QCS web site: http://rms.usace.army.mil .

The SDEF format is as follows:

Field Activity Code Length Description

1 WRKP 3 Workers per day

2 RESP 4 Responsible party

3 AREA 4 Area of work

4 MODF 6 Modification Number

5 BIDI 6 Bid Item (CLIN)

6 PHAS 2 Phase of work

SECTION 01 32 01.00 10 Page 4

Field Activity Code Length Description

7 CATW 1 Category of work

8 FOW 20 Feature of work*

*Some systems require that FEATURE OF WORK values be placed in several activity code fields. The notation shown is for Primavera P6. Refer to the specific software guidelines with respect to the FEATURE OF WORK field requirements.

3.3.6.1 Workers Per Day (WRKP)

Assign Workers per Day for all field construction or direct work activities, if directed by the Contracting Officer. Workers per day is based on the average number of workers expected each day to perform a task for the duration of that activity.

3.3.6.2 Responsible Party Coding (RESP)

Assign responsibility code for all activities to the Prime Contractor, Subcontractor(s) or Government agency(ies) responsible for performing the activity.

a. Activities coded with a Government Responsibility code include, but are not limited to: Government approvals, Government design reviews, environmental permit approvals by State regulators, Government Furnished Property/Equipment (GFP) and Notice to Proceed (NTP) for phasing requirements.

b. Activities cannot have more than one Responsibility Code. Examples of acceptable activity code values are: DOR (for the designer of record);

ELEC (for the electrical subcontractor); MECH (for the mechanical subcontractor); and GOVT (for USACE).

3.3.6.3 Area of Work Coding (AREA)

Assign Work Area code to activities based upon the work area in which the activity occurs. Define work areas based on resource constraints or space constraints that would preclude a resource, such as a particular trade or craft work crew from working in more than one work area at a time due to restraints on resources or space. Examples of Work Area Coding include different areas within a floor of a building, different floors within a building, and different buildings within a complex of buildings.

Activities cannot have more than one Work Area Code.

Not all activities are required to be Work Area coded. A lack of Work Area coding indicates the activity is not resource or space constrained.

3.3.6.4 Modification Number (MODF)

Assign a Modification Number Code to any activity or sequence of activities added to the schedule as a result of a Contract Modification, when approved by Contracting Officer. Key all Code values to the Government's modification numbering system. An activity can have only one Modification Number Code.

SECTION 01 32 01.00 10 Page 5

3.3.6.5 Bid Item Coding (BIDI)

Assign a Bid Item Code to all activities using the Contract Line Item Schedule (CLIN) to which the activity belongs, even when an activity is not cost loaded. An activity can have only one BIDI Code.

3.3.6.6 Phase of Work Coding (PHAS)

Assign Phase of Work Code to all activities. Examples of phase of work are procurement phase and construction phase. Each activity can have only one Phase of Work code.

a. Code proposed fast track design and construction phases proposed to allow filtering and organizing the schedule by fast track design and construction packages.

b. If the contract specifies phasing with separately defined performance periods, identify a Phase Code to allow filtering and organizing the schedule accordingly.

3.3.6.7 Category of Work Coding (CATW)

Assign a Category of Work Code to all activities. Category of Work Codes include, but are not limited to permits, construction submittal, procurement, fabrication, weather sensitive installation, non-weather sensitive installation, start-up, and testing activities. Each activity can have no more than one Category of Work Code.

3.3.6.8 Feature of Work Coding (FOW)

Assign a Feature of Work Code to appropriate activities based on the Definable Feature of Work to which the activity belongs based on the approved QC plan.

Definable Feature of Work is defined in Section 01 45 00.00 10 QUALITY CONTROL. An activity can have only one Feature of Work Code.

3.3.7 Contract Milestones and Constraints

Milestone activities are to be used for significant project events including, but not limited to, project phasing, project start and end activities, or interim completion dates. The use of artificial float constraints such as "zero free float" or "zero total float" are prohibited.

Mandatory constraints that ignore or effect network logic are prohibited.

No constrained dates are allowed in the schedule other than those specified herein. Submit additional constraints to the Contracting Officer for approval on a case by case basis.

3.3.7.1 Project Start Date Milestone and Constraint

The first activity in the project schedule must be a start milestone titled "NTP Acknowledged," which must have a "Start On" constraint date equal to the date that the NTP is acknowledged.

3.3.7.2 End Project Finish Milestone and Constraint

The last activity in the schedule must be a finish milestone titled "End

SECTION 01 32 01.00 10 Page 6

Project."

Constrain the project schedule to the Contract Completion Date in such a way that if the schedule calculates an early finish, then the float calculation for "End Project" milestone reflects positive float on the longest path. If the project schedule calculates a late finish, then the "End Project" milestone float calculation reflects negative float on the longest path. The Government is under no obligation to accelerate Government activities to support a Contractor's early completion.

3.3.7.3 Interim Completion Dates and Constraints

Constrain contractually specified interim completion dates to show negative float when the calculated late finish date of the last activity in that phase is later than the specified interim completion date.

3.3.7.3.1 Start Phase

Use a start milestone as the first activity for a project phase. Call the start milestone "Start Phase X" where "X" refers to the phase of work.

3.3.7.3.2 End Phase

Use a finish milestone as the last activity for a project phase. Call the finish milestone "End Phase X" where "X" refers to the phase of work.

3.3.8 Calendars

Schedule activities on a Calendar to which the activity logically belongs. Develop calendars to accommodate any contract defined work period such as a 7-day calendar for Government Acceptance activities, concrete cure times, etc. Develop the default Calendar to match the physical work plan with non-work periods identified including weekends and holidays. Develop sSeasonal Calendar(s) and assign to seasonally affected activities as applicable.

If an activity is weather sensitive it should be assigned to a calendar showing non-work days on a monthly basis, with the non-work days selected at random across the weeks of the calendar, using the anticipated adverse weather delay work days provided in the Special Contract . Assign non-work days over a seven-day week as weather records are compiled on seven-day weeks, which may cause some of the weather related non-work days to fall on weekends .

3.3.9 Open Ended Logic

Only two open ended activities are allowed: the first activity "NTP Acknowledged" may have no predecessor logic, and the last activity -"End Project" may have no successor logic.

Predecessor open ended logic may be allowed in a time impact analyses upon the Contracting Officer's approval.

3.3.10 Default Progress Data Disallowed

Actual Start and Finish dates must not automatically update with default mechanisms included in the scheduling software. Updating of the percent complete and the remaining duration of any activity must be independent functions. Disable program features that calculate one of these

SECTION 01 32 01.00 10 Page 7 parameters from the other. Activity Actual Start (AS) and Actual Finish (AF) dates assigned during the updating process must match those dates provided in the Contractor Quality Control Reports. Failure to document the AS and AF dates in the Daily Quality Control report will result in disapproval of the Contractor's schedule.

3.3.11 Out-of-Sequence Progress

Activities that have progressed before all preceding logic has been satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case basis subject to approval by the Contracting Officer.

Propose logic corrections to eliminate out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule. Address out of sequence progress or logic changes in the Narrative Report and in the periodic schedule update meetings.

3.3.12 Added and Deleted Activities

Do not delete activities from the project schedule or add new activities to the schedule without approval from the Contracting Officer. Activity ID and description changes are considered new activities and cannot be changed without Contracting Officer approval.

3.3.13 Original Durations

Activity Original Durations (OD) must be reasonable to perform the work item. OD changes are prohibited unless justification is provided and approved by the Contracting Officer.

3.3.14 Leads, Lags, and Start to Finish Relationships

Lags must be reasonable as determined by the Government and not used in place of realistic original durations, must not be in place to artificially absorb float, or to replace proper schedule logic.

a. Leads (negative lags) are prohibited.

b. Start to Finish (SF) relationships are prohibited.

3.3.15 Retained Logic

Schedule calculations must retain the logic between predecessors and successors ("retained logic" mode) even when the successor activity(s) starts and the predecessor activity(s) has not finished (out-of-sequence progress). Software features that in effect sever the tie between predecessor and successor activities when the successor has started and the predecessor logic is not satisfied ("progress override") are not be allowed.

3.3.16 Percent Complete

Update the percent complete for each activity started, based on the realistic assessment of earned value. Activities which are complete but for remaining minor punch list work and which do not restrain the initiation of successor activities may be declared 100 percent complete to allow for proper schedule management.

SECTION 01 32 01.00 10 Page 8

3.3.17 Remaining Duration

Update the remaining duration for each activity based on the number of estimated work days it will take to complete the activity. Remaining duration may not mathematically correlate with percentage found under paragraph entitled Percent Complete.

3.3.18 Cost Loading of Closeout Activities

Cost load the "Correction of punch list from Government pre-final inspection" activity(ies) not less than 1 percent of the present contract value. Activity(ies) may be declared 100 percent complete upon the Government's verification of completion and correction of all punch list work identified during Government pre-final inspection(s).

3.3.18.1 As-Built Drawings

If there is no separate contract line item (CLIN) for as-built drawings, cost load the "Submission and approval of as-built drawings" activity not less than $35,000 or 1 percent of the present contract value, which ever is greater, up to $200,000. Activity will be declared 100 percent complete upon the Government's approval.

3.3.18.2 O & M Manuals

Cost load the "Submission and approval of O & M manuals" activity not less than $20,000. Activity will be declared 100 percent complete upon the Government's approval of all O & M manuals.

3.3.19 Early Completion Schedule and the Right to Finish Early

An Early Completion Schedule is an Initial Project Schedule (IPS) that indicates all scope of the required contract work will be completed before the contractually required completion date.

a. No IPS indicating an Early Completion will be accepted without being fully resource-loaded (including crew sizes and manhours) and the Government agreeing that the schedule is reasonable and achievable.

b. The Government is under no obligation to accelerate work items it is responsible for to ensure that the early completion is met nor is it responsible to modify incremental funding (if applicable) for the project to meet the contractor's accelerated work.

3.4 PROJECT SCHEDULE SUBMISSIONS

Provide the submissions as described below. The data CD/DVD, reports, and network diagrams required for each submission are contained in paragraph SUBMISSION REQUIREMENTS. If the Contractor fails or refuses to furnish the information and schedule updates as set forth herein, then the Contractor will be deemed not to have provided an estimate upon which a progress payment can be made.

Review comments made by the Government on the schedule(s) do not relieve the Contractor from compliance with requirements of the Contract Documents.

3.4.1 Preliminary Project Schedule Submission

Prior to or at the Preconstruction Meeting, submit the Preliminary Project

SECTION 01 32 01.00 10 Page 9

Schedule defining the planned operations detailed for the first 90 calendar days for approval. The approved Preliminary Project Schedule will be used for payment purposes not to exceed 90 calendar days after NTP. Completely cost load the Preliminary Project Schedule to balance the contract award CLINS shown on the Price Schedule. The Preliminary Project Schedule may be summary in nature for the remaining performance period. It must be early start and late finish constrained and logically tied as specified. The Preliminary Project Schedule forms the basis for the Initial Project Schedule specified herein and must include all of the required plan and program preparations, submissions and approvals identified in the contract (for example, Quality Control Plan, Safety Plan, and Environmental Protection Plan) as well as design activities, planned submissions of all early design packages, permitting activities, design review conference activities, and other non-construction activities intended to occur within the first 90 calendar days. Government acceptance of the associated design package(s) and all other specified Program and Plan approvals must occur prior to any planned construction activities. Activity code any activities that are summary in nature after the first 90 calendar days with Bid Item (CLIN) code (BIDI), Responsibility Code (RESP) and Feature of Work code (FOW).

3.4.2 Initial Project Schedule Submission

Submit the Initial Project Schedule for approval within 35 calendar days after notice to proceed is issued. The schedule must demonstrate a reasonable and realistic sequence of activities which represent all work through the entire contract performance period. No payment will be made for work items not fully detailed in the Project Schedule.

3.4.3 Periodic Schedule Updates

Update the Project Schedule on a regular basis, monthly at a minimum.

Provide a draft Periodic Schedule Update for review at the schedule update meetings as prescribed in the paragraph PERIODIC SCHEDULE UPDATE MEETINGS. These updates will enable the Government to assess Contractor's progress.

a. Update information including Actual Start Dates (AS), Actual Finish Dates (AF), Remaining Durations (RD), and Percent Complete is subject to the approval of the Government at the meeting.

b. AS and AF dates must match the date(s) reported on the Contractor's Quality Control Report for an activity start or finish.

3.5 SUBMISSION REQUIREMENTS

Submit the following items for the Preliminary Schedule, Initial Schedule, and every Periodic Schedule Update throughout the life of the project:

3.5.1 Data CD/DVDs

Provide two sets of data CD/DVDs containing the current project schedule and all previously submitted schedules in the format of the scheduling software (e.g. .xer). Also include on the data CD/DVDs the Narrative Report and all required Schedule Reports. Label each CD/DVD indicating the type of schedule (Preliminary, Initial, Update), full contract number, Data Date and file name. Each schedule must have a unique file name and use project specific settings.

SECTION 01 32 01.00 10 Page 10

3.5.2 Narrative Report

Provide a Narrative Report with each schedule submission. The Narrative Report is expected to communicate to the Government the thorough analysis of the schedule output and the plans to compensate for any problems, either current or potential, which are revealed through that analysis.

Include the following information as minimum in the Narrative Report:

a. Identify and discuss the work scheduled to start in the next update period.

b. A description of activities along the two most critical paths where the total float is less than or equal to 20 work days.

c. A description of current and anticipated problem areas or delaying factors and their impact and an explanation of corrective actions taken or required to be taken.

d. Identify and explain why activities based on their calculated late dates should have either started or finished during the update period but did not.

e. Identify and discuss all schedule changes by activity ID and activity name including what specifically was changed and why the change was needed. Include at a minimum new and deleted activities, logic changes, duration changes, calendar changes, lag changes, resource changes, and actual start and finish date changes.

f. Identify and discuss out-of-sequence work.

3.5.3 Schedule Reports

The format, filtering, organizing and sorting for each schedule report will be as directed by the Contracting Officer. Typically, reports contain Activity Numbers, Activity Description, Original Duration, Remaining Duration, Early Start Date, Early Finish Date, Late Start Date, Late Finish Date, Total Float, Actual Start Date, Actual Finish Date, and Percent Complete. Provide the reports electronically in .pdf format.

Provid e hardcopy reports to each meeting attendee, the BCE, and the COR .

The following lists typical reports that will be requested:

3.5.3.1 Activity Report

List of all activities sorted according to activity number.

3.5.3.2 Logic Report

List of detailed predecessor and successor activities for every activity in ascending order by activity number.

3.5.3.3 Total Float Report

A list of all incomplete activities sorted in ascending order of total float. List activities which have the same amount of total float in ascending order of Early Start Dates. Do not show completed activities on this report.

SECTION 01 32 01.00 10 Page 11

3.5.3.4 Earnings Report by CLIN

A compilation of the Total Earnings on the project from the NTP to the data date, which reflects the earnings of activities based on the agreements made in the schedule update meeting defined herein. Provided a complete schedule update has been furnished, this report serves as the basis of determining progress payments. Group activities by CLIN number and sort by activity number. Provide a total CLIN percent earned value, CLIN percent complete, and project percent complete. The printed report must contain the following for each activity: the Activity Number, Activity Description, Original Budgeted Amount, Earnings to Date, Earnings this period, Total Quantity, Quantity to Date, and Percent Complete (based on cost).

3.5.3.5 Schedule Log

Provide a Scheduling/Leveling Report generated from the current project schedule being submitted.

3.5.4 Network Diagram

The Network Diagram is required for the Preliminary, Initial and Periodic Updates. Depict and display the order and interdependence of activities and the sequence in which the work is to be accomplished. The Contracting Officer will use, but is not limited to, the following conditions to review compliance with this paragraph:

3.5.4.1 Continuous Flow

Show a continuous flow from left to right with no arrows from right to left. Show the activity number, description, duration, and estimated earned value on the diagram.

3.5.4.2 Project Milestone Dates

Show dates on the diagram for start of project, any contract required interim completion dates, and contract completion dates.

3.5.4.3 Critical Path

Show all activities on the critical path. The critical path is defined as the longest path.

3.5.4.4 Banding

Organize activities using the WBS or as otherwise directed to assist in the understanding of the activity sequence. Typically, this flow will group activities by major elements of work, category of work, work area and/or responsibility.

3.5.4.5 Cash Flow / Schedule Variance Control (SVC) Diagram

With each schedule submission, provide a SVC diagram showing 1) Cash Flow S-Curves indicating planned project cost based on projected early and late activity finish dates, and 2) Earned Value to-date.

SECTION 01 32 01.00 10 Page 12

3.6 PERIODIC SCHEDULE UPDATE

3.6.1 Periodic Schedule Update Meetings

Conduct periodic schedule update meetings for the purpose of reviewing the proposed Periodic Schedule Update, Narrative Report, Schedule Reports, and progress payment. Conduct meetings at least monthly within five days of the proposed schedule data date. Provide a computer with the scheduling software loaded and a projector which allows all meeting participants to view the proposed schedule during the meeting. The Contractor's authorized scheduler must organize, group, sort, filter, perform schedule revisions as needed and review functions as requested by the Contractor and/or Government. The meeting is a working interactive exchange which allows the Government and Contractor the opportunity to review the updated schedule on a real time and interactive basis. The meeting will last no longer than 8 hours. Provide a draft of the proposed narrative report and schedule data file to the Government a minimum of two workdays in advance of the meeting. The Contractor's Project Manager and scheduler must attend the meeting with the authorized representative of the Contracting Officer. Superintendents, foremen and major subcontractors must attend the meeting as required to discuss the project schedule and work.

Following the periodic schedule update meeting, make corrections to the draft submission. Include only those changes approved by the Government in the submission and invoice for payment.

3.6.2 Update Submission Following Progress Meeting

Submit the complete Periodic Schedule Update of the Project Schedule containing all approved progress, revisions, and adjustments, pursuant to paragraph SUBMISSION REQUIREMENTS not later than 4 work days after the periodic schedule update meeting.

3.7 WEEKLY PROGRESS MEETINGS

Conduct a weekly meeting with the Government (or as otherwise mutually agreed to) between the meetings described in paragraph entitled PERIODIC SCHEDULE UPDATE MEETINGS for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities for the upcoming two weeks. Use the current approved schedule update for the purposes of this meeting and for the production and review of reports. At the weekly progress meeting, address the status of RFIs, RFPs and Submittals.

3.8 REQUESTS FOR TIME EXTENSIONS

Provide a justification of delay to the Contracting Officer in accordance with the contract provisions and clauses for approval within 10 days of a delay occurring. Also prepare a time impact analysis for each Government request for proposal (RFP) to justify time extensions.

3.8.1 Justification of Delay

Provide a description of the event(s) that caused the delay and/or impact to the work. As part of the description, identify all schedule activities impacted. Show that the event that caused the delay/impact was the responsibility of the Government. Provide a time impact analysis that demonstrates the effects of the delay or impact on the project completion date or interim completion date(s).