About this file

This document contains an arc flash hazard analysis report and related federal contract opportunity solicitation. The arc flash hazard analysis report provides specifications for conducting an analysis to determine arc flash hazard distances and incident energy exposures for electrical equipment work. The related federal contract opportunity is a solicitation for construction services to build a new 18,650 square foot Medical Readiness Facility at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The solicitation seeks a single firm fixed-price contract with a 450 day performance period. Services include site work, erecting precast concrete panels and mechanical/electrical/plumbing systems, and demolishing two existing buildings. The solicitation also includes nine options such as permeable pavers and special interior finishes. The project value is between $5-10 million. The solicitation closes on May 5, 2022 and award will be made without discussions under FAR Part 15 using technical, past performance and price factors.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Medical Readiness Facility, newest first.
File Type Posted
074213 23 compo wall panel.pdf PDF
Questions and Answers 05 R1.pdf PDF
Questions and Answers 04 R1.pdf PDF
60613250_WIANG_TRUAX-MED-E_v19 - Sheet - E-601 - ELECTRICAL SCHEDULES.pdf PDF
W50S9F-22-R-0001_0004.pdf PDF
Questions and Answers 05.pdf PDF
Questions and Answers 04.pdf PDF
W50S9F-22-R-0001_0003.pdf PDF
Bldg_311 Floor Layout.pdf PDF
Questions and Answers 03.pdf PDF
Photograph Log.docx DOCX document
Bldg_307 Floor Layout.pdf PDF
DEMO PLAN BLDG 311.pdf PDF
Questions and Answers 01.pdf PDF
Questions and Answers 02.pdf PDF
W50S9F-22-R-0001_0002.pdf PDF
Site Visit Sign In Log.pdf PDF
Pre-Proposal Slides - Medical Readiness.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
W50S9F-22-R-0001_0001.pdf PDF
ATTACHMENT 03_DRAWINGS Project No. XGFG139001 dated 14 MAY 2021.pdf PDF
ATTACHMENT 05_B307 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 09_SAP SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 10_SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 12 PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
EXHIBIT D PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
EXHIBIT E SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 01_PLANS AND SPECIFICATIONS Vol 1 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 02_PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 04_GEOTECHNICAL ENGINEERING REPORT Project No. XGFG139001 dated 08 Nov 2019.pdf PDF
ATTACHMENT 06_B311 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 07_SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
ATTACHMENT 11_SFS FORM 12.xlsx XLSX spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT C LETTER OF COMMITMENT.docx DOCX document
W50S9F-22-R-0001.pdf PDF
ATTACHMENT 08_SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT F SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT G PROPOSAL PRICE SCHEDULE.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Medical Readiness Facility 115th Fighter Wing Truax Field - Building 506, Madison, Wisconsin

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section 26 0573.19

ARC-FLASH HAZARD ANALYSIS

Project No. XGFG139001

MEDICAL READINESS FACILITY

SECTION 26 0573.19

ARC-FLASH HAZARD ANALYSIS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes a computer-based, arc-flash study to determine the arc-flash hazard distance and the incident energy to which personnel could be exposed during work on or near electrical equipment.

1.3 DEFINITIONS

A. One-Line Diagram: A diagram that shows, by means of single lines and graphic symbols, the course of an electric circuit or system of circuits and the component devices or parts used therein.

B. Power System Analysis Software Developer: An entity that commercially develops, maintains, and distributes computer software used for power system studies.

C. Power Systems Analysis Specialist: Professional engineer in charge of performing the study and documenting recommendations, licensed in the state where Project is located.

D. Protective Device: A device that senses when an abnormal current flow exists and then removes the affected portion from the system.

E. SCCR: Short-circuit current rating.

F. Service: The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the premises served.

G. Single-Line Diagram: See "One-Line Diagram."

1.4 ACTION SUBMITTALS

A. Product Data: For computer software program to be used for studies.

B. Study Submittals: Submit the following submittals after the approval of system protective devices submittals. Submittals shall be in digital form:

1. Arc-flash study input data, including completed computer program input data sheets.

2. Arc-flash study report; signed, dated, and sealed by Power Systems Analysis Specialist.

3. Submit study report for action prior to receiving final approval of distribution equipment submittals.

If formal completion of studies will cause delay in equipment manufacturing, obtain approval from Architect for preliminary submittal of sufficient study data to ensure that selection of devices and associated characteristics is satisfactory.

Section 26 0573.19

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data:

1. For Power Systems Analysis Software Developer.

2. For Power System Analysis Specialist.

3. For Field Adjusting Agency.

B. Product Certificates: For arc-flash hazard analysis software, certifying compliance with IEEE 1584 and

NFPA 70E.

1.6 CLOSEOUT SUBMITTALS Section

A. Operation and Maintenance Data:

1. Provide maintenance procedures in equipment manuals according to requirements in NFPA 70E.

2. Operation and Maintenance Procedures: In addition to items specified in Division 01, provide maintenance procedures for use by Owner's personnel that comply with requirements in NFPA 70E.

1.7 QUALITY ASSURANCE

A. Study shall be performed using commercially developed and distributed software designed specifically for power system analysis.

B. Software algorithms shall comply with requirements of standards and guides specified in this Section.

C. Manual calculations are unacceptable.

D. Power System Analysis Software Qualifications: An entity that owns and markets computer software used for studies, having performed successful studies of similar magnitude on electrical distribution systems using similar devices.

1. Computer program shall be designed to perform arc-flash analysis or have a function, component, or add-on module designed to perform arc-flash analysis.

2. Computer program shall be developed under the charge of a licensed professional engineer who holds IEEE Computer Society's Certified Software Development Professional certification.

E. Power Systems Analysis Specialist Qualifications: Professional engineer in charge of performing the arc-flash study, analyzing the arc flash, and documenting recommendations, licensed in the state where Project is located. All elements of the study shall be performed under the direct supervision and control of this professional engineer.

F. Arc-Flash Study Certification: Arc-Flash Study Report shall be signed and sealed by Power Systems Analysis Specialist.

PART 2 - PRODUCTS

2.1 COMPUTER SOFTWARE DEVELOPERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. ESA Inc.

2. Power Analytics, Corporation.

3. SKM Systems Analysis, Inc.

Section 26 0573.19

B. Comply with IEEE 1584 and NFPA 70E.

C. Analytical features of device coordination study computer software program shall have the capability to calculate "mandatory," "very desirable," and "desirable" features as listed in IEEE 399.

2.2 ARC-FLASH STUDY REPORT CONTENT

A. Executive summary of study findings.

B. Study descriptions, purpose, basis, and scope. Include case descriptions, definition of terms, and guide for interpretation of results.

C. One-line diagram, showing the following:

1. Protective device designations and ampere ratings.

2. Conductor types, sizes, and lengths.

3. Transformer kilovolt ampere (kVA) and voltage ratings, including derating factors and environmental conditions.

4. Motor and generator designations and kVA ratings.

5. Switchgear, switchboard, motor-control center, panelboard designations, and ratings.

D. Study Input Data: As described in "Power System Data" Article.

E. Short-Circuit Study Output Data: As specified in "Short-Circuit Study Output Reports" Paragraph in "Short-Circuit Study Report Contents" Article in Section 26 0573.13 "Short-Circuit Studies."

F. Protective Device Coordination Study Report Contents: As specified in "Coordination Study Report Contents" Article in Section 26 0573.16 "Coordination Studies."

G. Arc-Flash Study Output Reports:

1. Interrupting Duty Report: Three-phase and unbalanced fault calculations, showing the following for each equipment location included in the report:

a. Voltage.

b. Calculated symmetrical fault-current magnitude and angle.

c. Fault-point X/R ratio.

d. No AC Decrement (NACD) ratio.

e. Equivalent impedance.

f. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a symmetrical basis.

g. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a total basis.

H. Incident Energy and Flash Protection Boundary Calculations:

1. Arcing fault magnitude.

2. Protective device clearing time.

3. Duration of arc.

4. Arc-flash boundary.

5. Restricted approach boundary.

6. Limited approach boundary.

7. Working distance.

8. Incident energy.

9. Hazard risk category.

10. Recommendations for arc-flash energy reduction.

I. Fault study input data, case descriptions, and fault-current calculations including a definition of terms and guide for interpretation of computer printout.

Section 26 0573.19

2.3 ARC-FLASH WARNING LABELS

A. Comply with requirements in Section 26 0553 "Identification for Electrical Systems" for self-adhesive equipment labels. Produce a 3.5-by-5-inch self-adhesive equipment label for each work location included in the analysis.

B. Label shall have an orange header with the wording, "WARNING, ARC-FLASH HAZARD," and shall include the following information taken directly from the arc-flash hazard analysis:

1. Location designation.

2. Nominal voltage.

3. Protection boundaries.

a. Arc-flash boundary.

b. Restricted approach boundary.

c. Limited approach boundary.

4. Arc flash PPE category.

5. Required minimum arc rating of PPE in Cal/cm squared.

6. Available incident energy.

7. Working distance.

8. Engineering report number, revision number, and issue date.

C. Labels shall be machine printed, with no field-applied markings.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine Project overcurrent protective device submittals. Proceed with arc-flash study only after relevant equipment submittals have been assembled. Overcurrent protective devices that have not been submitted and approved prior to arc-flash study may not be used in study.

3.2 ARC-FLASH HAZARD ANALYSIS

A. Comply with NFPA 70E and its Annex D for hazard analysis study.

B. Preparatory Studies: Perform the [Short-Circuit] [and] [Protective Device Coordination] [study] [studies] prior to starting the Arc-Flash Hazard Analysis[ or obtain results from another source].

1. Short-Circuit Study Output: As specified in "Short-Circuit Study Output Reports" Paragraph in

"Short-Circuit Study Report Contents" Article in Section 26 0573.13 "Short-Circuit Studies."

2. Coordination Study Report Contents: As specified in "Coordination Study Report Contents" Article in Section 26 0573.16 "Coordination Studies."

C. Calculate maximum and minimum contributions of fault-current size.

1. Maximum calculation shall assume a maximum contribution from the utility and shall assume motors to be operating under full-load conditions.

2. Calculate arc-flash energy at 38 percent of maximum short-circuit current according to NFPA 70E recommendations.

D. Calculate the arc-flash protection boundary and incident energy at locations in electrical distribution system where personnel could perform work on energized parts.

E. Include medium- and low-voltage equipment locations, except equipment rated 240 V ac or less fed from transformers less than 125 kVA.

Section 26 0573.19

F. Calculate the limited, restricted, and prohibited approach boundaries for each location.

G. Incident energy calculations shall consider the accumulation of energy over time when performing arc-flash calculations on buses with multiple sources. Iterative calculations shall take into account the changing current contributions, as the sources are interrupted or decremented with time. Fault contribution from motors and generators shall be decremented as follows:

1. Fault contribution from induction motors shall not be considered beyond three to five cycles.

2. Fault contribution from synchronous motors and generators shall be decayed to match the actual decrement of each as closely as possible (for example, contributions from permanent magnet generators will typically decay from 10 per unit to three per unit after 10 cycles).

H. Arc-flash energy shall generally be reported for the maximum of line or load side of a circuit breaker.

However, arc-flash computation shall be performed and reported for both line and load side of a circuit breaker as follows:

1. When the circuit breaker is in a separate enclosure.

2. When the line terminals of the circuit breaker are separate from the work location.

I. Base arc-flash calculations on actual overcurrent protective device clearing time. Cap maximum clearing time at two seconds based on IEEE 1584, Section B.1.2.

3.3 POWER SYSTEM DATA

A. Obtain all data necessary for conduct of the arc-flash hazard analysis.

1. Verify completeness of data supplied on one-line diagram on Drawings and under "Preparatory

Studies" Paragraph in "Arc-Flash Hazard Analysis" Article. Call discrepancies to Architect's attention.

2. For new equipment, use characteristics from approved submittals under provisions of action submittals and information submittals for this Project.

3. For existing equipment, whether or not relocated, obtain required electrical distribution system data by field investigation and surveys conducted by qualified technicians and engineers.

B. Electrical Survey Data: Gather and tabulate the following input data to support study. Comply with recommendations in IEEE 1584 and NFPA 70E as to the amount of detail that is required to be acquired in the field. Field data gathering shall be under the direct supervision and control of the engineer in charge of performing the study, and shall be by the engineer or its representative who holds NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certification. Data include, but are not limited to, the following:

1. Product Data for overcurrent protective devices specified in other Sections and involved in overcurrent protective device coordination studies. Use equipment designation tags that are consistent with electrical distribution system diagrams, overcurrent protective device submittals, input and output data, and recommended device settings.

2. Obtain electrical power utility impedance or available short circuit current at the service.

3. Power sources and ties.

4. Short-circuit current at each system bus (three phase and line to ground).

5. Full-load current of all loads.

6. Voltage level at each bus.

7. For transformers, include kVA, primary and secondary voltages, connection type, impedance, X/R ratio, taps measured in percent, and phase shift.

8. For circuit breakers and fuses, provide manufacturer and model designation. List type of breaker, type of trip and available range of settings, SCCR, current rating, and breaker settings.

9. Generator short-circuit current contribution data, including short-circuit reactance, rated kVA, rated voltage, and X/R ratio.

10. For relays, provide manufacturer and model designation, current transformer ratios, potential transformer ratios, and relay settings.

11. Motor horsepower and NEMA MG 1 code letter designation.

Section 26 0573.19

12. Low-voltage conductor sizes, lengths, number, conductor material and conduit material (magnetic or nonmagnetic).

3.4 LABELING

A. Apply one arc-flash label on the front cover of each section of the equipment and on side or rear covers with accessible live parts and hinged doors or removable plates for each equipment included in the study. Base arc-flash label data on highest values calculated at each location.

B. Each piece of equipment listed below shall have an arc-flash label applied to it:

1. Motor-control center.

2. Low-voltage switchboard.

3. Switchgear.

4. Low voltage transformers.

5. Panelboard and safety switch over 250 V.

6. Applicable panelboard and safety switch under 250 V.

7. Control panel.

C. Note on record Drawings the location of equipment where the personnel could be exposed to arc-flash hazard during their work.

1. Indicate arc-flash energy.

2. Indicate protection level required.

3.5 APPLICATION OF WARNING LABELS

A. Install arc-flash warning labels under the direct supervision and control of Power System Analysis Specialist.

3.6 DEMONSTRATION

A. Engage Power Systems Analysis Specialist to train Owner's maintenance personnel in potential arc-flash hazards associated with working on energized equipment and the significance of arc-flash warning labels.

END OF SECTION