Questions and Answers 05 R1.pdf

PDF 149 KB Posted

Attached to
Construct Medical Readiness Facility Federal contract opportunity
Solicitation number
W50S9F22R0001
Issued by
Department of the Army National Guard

About this file

This document outlines a solicitation for construction services. The 115th Fighter Wing of the Wisconsin Air National Guard is seeking a firm fixed-price contract to construct an 18,650 square foot Medical Readiness Facility at Dane County Regional Airport in Madison, Wisconsin. The project scope includes site work, erecting precast concrete panels, and installing new mechanical, electrical, plumbing and technology systems. Nine optional items are also included. The period of performance is 450 calendar days from the notice to proceed with a closing date of May 5, 2022. The estimated value is between $5-10 million. The North American Industry Classification code is 236220 and small businesses are encouraged to compete. The source selection will consider technical, past performance and price factors.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Medical Readiness Facility, newest first.
File Type Posted
60613250_WIANG_TRUAX-MED-E_v19 - Sheet - E-601 - ELECTRICAL SCHEDULES.pdf PDF
SECTION 26 0573.19 ARC FLASH HAZARD ANALYSIS.pdf PDF
074213 23 compo wall panel.pdf PDF
Questions and Answers 04 R1.pdf PDF
W50S9F-22-R-0001_0004.pdf PDF
Questions and Answers 05.pdf PDF
Questions and Answers 04.pdf PDF
W50S9F-22-R-0001_0003.pdf PDF
DEMO PLAN BLDG 311.pdf PDF
Questions and Answers 01.pdf PDF
Bldg_311 Floor Layout.pdf PDF
Questions and Answers 03.pdf PDF
Photograph Log.docx DOCX document
Bldg_307 Floor Layout.pdf PDF
Questions and Answers 02.pdf PDF
W50S9F-22-R-0001_0002.pdf PDF
W50S9F-22-R-0001_0001.pdf PDF
Site Visit Sign In Log.pdf PDF
Pre-Proposal Slides - Medical Readiness.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
ATTACHMENT 01_PLANS AND SPECIFICATIONS Vol 1 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 02_PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 04_GEOTECHNICAL ENGINEERING REPORT Project No. XGFG139001 dated 08 Nov 2019.pdf PDF
ATTACHMENT 06_B311 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 07_SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
ATTACHMENT 11_SFS FORM 12.xlsx XLSX spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT C LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 03_DRAWINGS Project No. XGFG139001 dated 14 MAY 2021.pdf PDF
ATTACHMENT 05_B307 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 09_SAP SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 10_SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 12 PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
EXHIBIT D PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
EXHIBIT E SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
W50S9F-22-R-0001.pdf PDF
ATTACHMENT 08_SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT F SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT G PROPOSAL PRICE SCHEDULE.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Medical Readiness Q&A #05

60. Regarding the interior signage schedule listed on sheet A-615. In the list there are two sign types listed as follows. S1-B permanent room identification : S1-A Room identification The interior sign schedule states S1 but does not list A or B to clarify which sign type. Could you provide some clarification for me on this matter.

A. Provide 5A/A‐615 entitled “S1‐B PERMANENT ROOM IDENTIFICATION”, this matches the rest of the signage as far as white letters on black background.

61. I’m not seeing a specific WOS called out in the spec’s. Can we get a brand/style that the designer would like to go with? If not, is the OBEX Bar system from Milliken acceptable?

A. The Government does not sole-source Walk-Off Systems. Provide a product based on the information provided.

62. A-112 shows a gypsum board ceiling at Copy Area 200.4. Can you provide a detail on how this ceiling is to be supported?

A. See detail 3B/A-627 entitled “Gypsum Board Lid @ Partition”.

63. Can you provide the HPSB Scoresheet?

A. Refer to SECTION 01 3329 SUSTAINABILITY REPORTING

64. The specifications list conflicting base working hours. Can you provide the preferred base working hours?

A. Base working hours for contractors is 0630-1430 CST.

65. Is the CWM 3rd party verifier provided by the government? If so, please provide contact information.

A. Construction Waste Management and Disposal is the responsibility of the Contractor. The Government collects the information provided for waste reporting.

66. Please confirm that the government will provide special tests and inspections. GC required to coordinate schedule only.

A. The contractor is responsible for special tests and inspections.

67. Is there underslab treatment for termites and underslab pests? If so, please provide more details and information.

A. N/A

68. Per Section 051200.2.06.B, Section 220501.1.03, and Section 220507.3.04B a unit price is required/called out. Where on the proposal schedule do these unit prices need to be shown? Or will unit pricing for these items, and any others listed, be agreed upon following award?

A. The Government does not have an interest in unit prices are referenced in these sections.

69. There are alternates/CLINs listed on both the proposal schedule and in the alternates form (Section

004323). Are we required to submit both forms?

A. Use the proposal schedule provided by the KO in the solicitation documents. Offerors are NOT required to submit the Section 00 4323.

70. The specs do not call for a NDL warranty for either the standing seam metal or EPDM roofs. Is this intentional?

A. Provide a 20 year warranty for each.

71. 90mil self-adhering EPDM roofing is not available, is a fully adhered 60mil system an acceptable alternative?

A. Provide 90 mil fully adhered EPDM roofing system in accordance with manufacturer’s recommendations.

72. Is it acceptable to use 2 layers of 2.6 ISO on the roof? This will achieve an R30 rating.

A. Yes and stagger the joints. Provide tapered insulation as indicated on roof plan.

73. A “1-3/8” deep rainscreen metal panel, type 1” is shown on the drawings but no defined specifications could be found. Can you provide additional information on the desired rainscreen panel? (i.e. Manufacturer, Product, aluminum composite panels, etc.)

A. Where “Metal Facia Panel” and “1-3/8” DEEP RAINSCREEN METAL PANEL TYPE 1” is called for, replace with “Metal Composite Panel”. See attached Specification Section 074213.23

“COMPOSITE METAL PANELS”

74. Attached file named “Rainscreen Metal Wall Panel” is a manufacturer and style to be considered for acceptable if no additional information can be provided.

A. Refer to specification section “07 4213.13 Metal Wall Panel”, replace “Rainscreen Metal

Wall Panel” with “Metal Wall Panel” where referenced in Contract Documents. Section 07 4213.13 Metal Wall Panel, Delete Paragraph 2.01 A and replace with the following, “Metallic‐Coated Steel Sheet: Zinc‐coated (galvanized) steel sheet complying with ASTM A 653, G90 coating designation, structural quality. Prepainted by the coil‐coating process to comply with ASTM A 755. A. Nominal Thickness: 24 gauge. B. Surface: Smooth, flat finish. C Exterior Finish: 2. 2‐coat Mica fluoropolymer for panel types “A” and “C”; 3‐coat Metallic fluoropolymer for panel type “B”., 1) Color: As selected by Architect from Manufacturer’s full range of colors. 2) Primer minimum thickness: 0.2 mil dft. 3) Color Coat: minimum thickness: 0.8 mil dft. 4)Clearcoat for three‐coat system 0.5 mil dft. D. Concealed Finish: apply pretreatment and manufacturer’s standard white or light colored acrylic or polyester backer finish consisting of prime coat and ash coat. 1) Total dry film thickness: 1.0 mil minimum. D. Panel Configuration:

Depth 7/8”, Corrugations: 4’ on center, Face of Corrugations: 1 1/8” side.”

75. Detail 6D shown on A-311, includes a transition that is not warrantable per the manufacturer’s.

Roofer is requesting the attached “Standing Seam Vertical Transition” file be considered.

A. Provide manufactures standard 6 x 6 inch gutters on face of metal wall panels with 4 – 4 x 4 inch downspouts equally spaced down to concrete splash blocks in lieu of internal gutter. Delete purlins from the Detail 6D/A-311. Roof standing seams will be 2” high and panels shall be 18” wide.

76. Detail 6B on A-310 calls out a metal fascia panel on the drawings but no defined specifications could be found. Can you provide additional information on the desired metal fascia panel? i.e. Manufacturer and product info.

A. The metal fascia panel shall be “COMPOSITE METAL PANELS”, see attached Section 07

04213.23 COMPOSITE METAL PANELS.

ALL QUESTIONS RECEIVED HAVE BEEN POSTED. NO FURTHER QUESTIONS WILL BE

REVIEWED.