Questions and Answers 04 R1.pdf

PDF 72 KB Posted

Attached to
Construct Medical Readiness Facility Federal contract opportunity
Solicitation number
W50S9F22R0001
Issued by
Department of the Army National Guard

About this file

This document provides details for a federal construction contract opportunity to construct a Medical Readiness Facility. The 115th Fighter Wing at Dane County Regional Airport - Truax Field, Madison, WI is soliciting proposals to award a firm fixed-price contract to construct an 18,650 square foot, two-story facility including administrative and storage space. The contract includes a base price for construction and nine options such as permeable pavers, glazed storefront, and daylighting systems. Interested offerors must register in the System for Award Management and attend an in-person pre-proposal conference on March 31, 2022. Proposals are due by May 5, 2022 and the contract is valued between $5-10 million. The North American Industry Classification Code is 236220 with a size standard of $39.5 million. The solicitation requires brand name products from Advantor, Andover, Marshall Best, and Monaco. The award will be made without discussions according to FAR Part 15.3 procedures evaluating Technical, Past Performance and Price factors.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Medical Readiness Facility, newest first.
File Type Posted
Questions and Answers 05 R1.pdf PDF
SECTION 26 0573.19 ARC FLASH HAZARD ANALYSIS.pdf PDF
074213 23 compo wall panel.pdf PDF
60613250_WIANG_TRUAX-MED-E_v19 - Sheet - E-601 - ELECTRICAL SCHEDULES.pdf PDF
W50S9F-22-R-0001_0004.pdf PDF
Questions and Answers 05.pdf PDF
Questions and Answers 04.pdf PDF
W50S9F-22-R-0001_0003.pdf PDF
Bldg_311 Floor Layout.pdf PDF
Questions and Answers 03.pdf PDF
Photograph Log.docx DOCX document
Bldg_307 Floor Layout.pdf PDF
DEMO PLAN BLDG 311.pdf PDF
Questions and Answers 01.pdf PDF
Questions and Answers 02.pdf PDF
W50S9F-22-R-0001_0002.pdf PDF
Site Visit Sign In Log.pdf PDF
Pre-Proposal Slides - Medical Readiness.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
W50S9F-22-R-0001_0001.pdf PDF
ATTACHMENT 01_PLANS AND SPECIFICATIONS Vol 1 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 02_PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 04_GEOTECHNICAL ENGINEERING REPORT Project No. XGFG139001 dated 08 Nov 2019.pdf PDF
ATTACHMENT 06_B311 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 07_SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
ATTACHMENT 11_SFS FORM 12.xlsx XLSX spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT C LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 03_DRAWINGS Project No. XGFG139001 dated 14 MAY 2021.pdf PDF
ATTACHMENT 05_B307 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 09_SAP SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 10_SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 12 PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
EXHIBIT D PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
EXHIBIT E SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
W50S9F-22-R-0001.pdf PDF
ATTACHMENT 08_SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT F SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT G PROPOSAL PRICE SCHEDULE.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Medical Readiness Q&A #04

45. Fixture types X2 and WA are designated in the drawings on pages E101 and E102, but they are not on the fixture schedule. Can you provide details on these fixtures?

A. See attached revised fixture schedule – Sheet E-601.

46. Please confirm if permits are indeed required for the water line and sanitary sewer as indicated in C-

001 since this is a federally owned base and city building permits are typically required.

A. Permits with the City of Madison are required. Domestic Water (Madison Water Utility), Electric and Gas (Madison Gas & Electric), and Sanitary Sewer (City of Madison) are all privatized utilities and have jurisdiction.

47. C401/Note 8 indicates to tap existing natural gas main line. Main line is not shown on drawing.

Please indicate where main line is located.

A. Natural Gas Distribution Line parallels the East curb of Pearson Street. It is approximately sited at the end of the leader on Sheet C401

48. 6B/A901 is referenced as “Add Alternate 3”. This does not correspond with any of the optional CLINS. If this is an alternate, what should be included in the base bid for this area of the building?

A. 6A/A901 and 6B/A901 are associated with CLIN 0004 - Option 3: Glazed Interior Storefront.

49. 2C/A901 and 3C/A901 indicates “Add Alternate 5: Roof Plan”. Confirm the add alternate is to furnish/install 14 solar tubes. This does not correspond with any of the options CLINS, please advise where cost should be included.

A. 2A/A901, 2C/A901, 3A/A901 and 3C/A901 are associated with CLIN 0006 – Option 5 Tubular

Daylighting System. Cost associated with this CLIN include 14 skylights, domes, flashing and diffusers.

50. In addition to above #48 and #49, there are multiple other alternates called out in plans that do not correspond with CLIN alternates. Please clarify.

A. 5C/A901 and 5B/A901 are associated with CLIN 0005 – Option 4 Laminated Wall Panels.

B. “Add Alternates” correspond with Option numbers in the solicitation.

51. Please clarify where 5A/A626 condition can be found. We are unclear where a ceiling cloud is located within 10” of an acoustical ceiling (and no wall between) A. See Sheet A-111, it is around Room 104.

52. Q&A #32 – If we are to provide access control system, please provide equipment required, material specifications and vendor requirements A. Access control system is sole-sourced to Advantor Systems.

53. Q&A #33 – If we are to provide video surveillance system, please provide equipment required, material specifications and vendor requirements A. Video surveillance system is sole-sourced to Advantor Systems.

54. Q&A #34 – If we are to provide intrusion detection system, please provide equipment required, A. Intrusion detection system is sole-sourced to Advantor Systems.

55. Q&A #35 – If we are to provide wireless access point system, please provide equipment required, A. Provide (2) biscuit jacks in ceiling for wireless access points.

56. Q&A #36 – If we are to provide data racks and comm room equipment, please provide equipment required, material specifications and vendor requirements A. Refer to Sheet T-701 and Division 27 of the Specifications.

57. Please indicate if excess topsoil and fill can be used on site or if it needs to be hauled from the site.

A. Contractor’s discretion - depending on if it meets the requirements of the contract documents.

58. Please confirm that no soil contamination has been found at the site.

A. Soil contamination was not detected during site investigation.

59. Spec section 26 2413 1.02 B refers to section 26 0573.19 “Arc Flash Hazard Analysis.” That referenced spec section isn’t in the spec book. Is the arc flash study required?

A. Please find attached Section 26 0537.19 – ARC-FLASH HAZARD ANALYSIS.

ALL QUESTIONS RECEIVED HAVE BEEN POSTED. NO FURTHER QUESTIONS WILL BE

REVIEWED.