DEMO PLAN BLDG 311.pdf

PDF 31 KB Posted

Attached to
Construct Medical Readiness Facility Federal contract opportunity
Solicitation number
W50S9F22R0001
Issued by
Department of the Army National Guard

About this file

This document provides details for a federal construction solicitation seeking offers to construct a Medical Readiness Facility. The 115th Fighter Wing of the Wisconsin Air National Guard is soliciting fixed-price bids to construct an 18,650 square foot, two-story facility at Dane County Regional Airport-Truax Field in Madison, Wisconsin. The project scope includes site work, erecting precast concrete panels, and installing new mechanical, electrical, plumbing and technology systems. Offerors are also asked to provide pricing for nine separate project options. The response deadline is May 5th, 2022, with award intended without discussions. Evaluation criteria are technical approach, past performance, and price. The contract duration is 450 days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Medical Readiness Facility, newest first.
File Type Posted
SECTION 26 0573.19 ARC FLASH HAZARD ANALYSIS.pdf PDF
074213 23 compo wall panel.pdf PDF
Questions and Answers 05 R1.pdf PDF
Questions and Answers 04 R1.pdf PDF
60613250_WIANG_TRUAX-MED-E_v19 - Sheet - E-601 - ELECTRICAL SCHEDULES.pdf PDF
W50S9F-22-R-0001_0004.pdf PDF
Questions and Answers 05.pdf PDF
Questions and Answers 04.pdf PDF
W50S9F-22-R-0001_0003.pdf PDF
Bldg_311 Floor Layout.pdf PDF
Questions and Answers 03.pdf PDF
Photograph Log.docx DOCX document
Bldg_307 Floor Layout.pdf PDF
Questions and Answers 01.pdf PDF
Questions and Answers 02.pdf PDF
W50S9F-22-R-0001_0002.pdf PDF
Site Visit Sign In Log.pdf PDF
Pre-Proposal Slides - Medical Readiness.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
W50S9F-22-R-0001_0001.pdf PDF
ATTACHMENT 03_DRAWINGS Project No. XGFG139001 dated 14 MAY 2021.pdf PDF
ATTACHMENT 05_B307 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 09_SAP SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 10_SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 12 PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
EXHIBIT D PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
EXHIBIT E SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 01_PLANS AND SPECIFICATIONS Vol 1 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 02_PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 04_GEOTECHNICAL ENGINEERING REPORT Project No. XGFG139001 dated 08 Nov 2019.pdf PDF
ATTACHMENT 06_B311 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 07_SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
ATTACHMENT 11_SFS FORM 12.xlsx XLSX spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT C LETTER OF COMMITMENT.docx DOCX document
W50S9F-22-R-0001.pdf PDF
ATTACHMENT 08_SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT F SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT G PROPOSAL PRICE SCHEDULE.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

daniel.barton Callout Sample 01: Black and yellow mastic containing 3% Chrysotile Asbestos. Present in Room 102 and 103 attached to back of plastic plastic trim/baseboard along base of walls. Approximate quantity 9 square feet (26 linear feet x 4") daniel.barton Callout Sample 15b: Black mastic/tar containing 3% Chrysotile Asbestos. Material is attached to bottom of bottom layer of tile (i.e. top layer of tile is current floor, bottom layer is tile under this) present throughout Room 101-1 and 101-2. Potential approximate quantity may range from sporadic to underneath all of 101-1 and 101-2.

daniel.barton Callout Sample 41: Beige material (referred to by lab as "mud") attached to white paint containing 2% Chrysotile Asbestos, found on walls throughout 104, 105-2, 105-1 daniel.barton Callout Sample 49: Black mastic/tar containing 3% Chrysotile Asbestos found below tile in 101-1 and 101-2. Potentially same material as sample 15b. Potential approximate quantity may range from sporadic to underneath all of 101-1 and 101-2.

File details come from the government source that posted it. Updated .