This solicitation requests proposals to construct a Medical Readiness Facility. The 115th Fighter Wing at Dane County Regional Airport - Truax Field in Madison, Wisconsin seeks to award a firm fixed-price contract for all labor, materials, equipment, and supervision necessary to build an 18,650 square foot, two-story facility including administrative space and storage areas. The project scope includes site work, erection of precast concrete panels, and new mechanical, electrical and technology systems. Proposals are due May 5th, 2022 with award planned for shortly thereafter and a 450 day period of performance. The contract is unrestricted but encourages small business participation. Brand name justification is provided for several specified systems.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Medical Readiness Facility, newest first.
File Type Posted
SECTION 26 0573.19 ARC FLASH HAZARD ANALYSIS.pdf PDF
074213 23 compo wall panel.pdf PDF
Questions and Answers 05 R1.pdf PDF
60613250_WIANG_TRUAX-MED-E_v19 - Sheet - E-601 - ELECTRICAL SCHEDULES.pdf PDF
Questions and Answers 04 R1.pdf PDF
W50S9F-22-R-0001_0004.pdf PDF
Questions and Answers 05.pdf PDF
Questions and Answers 04.pdf PDF
W50S9F-22-R-0001_0003.pdf PDF
Bldg_311 Floor Layout.pdf PDF
Questions and Answers 03.pdf PDF
DEMO PLAN BLDG 311.pdf PDF
Questions and Answers 01.pdf PDF
Photograph Log.docx DOCX document
Bldg_307 Floor Layout.pdf PDF
Questions and Answers 02.pdf PDF
W50S9F-22-R-0001_0002.pdf PDF
Site Visit Sign In Log.pdf PDF
W50S9F-22-R-0001_0001.pdf PDF
Pre-Proposal Slides - Medical Readiness.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
ATTACHMENT 03_DRAWINGS Project No. XGFG139001 dated 14 MAY 2021.pdf PDF
ATTACHMENT 05_B307 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 09_SAP SINGLE SOURCE DETERMINATION MONACO.pdf PDF
ATTACHMENT 10_SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
ATTACHMENT 12 PRE PROPOSAL SITE VISIT_DROP OFF INSTRUCTIONS.pdf PDF
EXHIBIT D PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
EXHIBIT E SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 02_PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG139001 dated 08 Jul 2021.pdf PDF
ATTACHMENT 04_GEOTECHNICAL ENGINEERING REPORT Project No. XGFG139001 dated 08 Nov 2019.pdf PDF
ATTACHMENT 06_B311 ASBESTOS REPORT Project No. XGFG139001 dated 25 Nov 2019.pdf PDF
ATTACHMENT 07_SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
ATTACHMENT 11_SFS FORM 12.xlsx XLSX spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT C LETTER OF COMMITMENT.docx DOCX document
W50S9F-22-R-0001.pdf PDF
ATTACHMENT 08_SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT F SUBCONTRACTING PLAN FORMAT.docx DOCX document
EXHIBIT G PROPOSAL PRICE SCHEDULE.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

BUILDING 506

MEDICAL READINESS FACILITY

B-3 SUBMITTAL

115th FIGHTER WING

TRUAX FIELD

AIR NATIONAL GUARD BASE

MADISON, WISCONSIN

W9133L-16-D-0009 W912J219F6007

PROJECT No. XGFG139001

07-08-2021

VOLUME 1 OF 2

AECOM

277 WEST NATIONWIDE BLVD., 5TH FLOOR, COLUMBUS, OHIO 43215-2566

T 614-464-4500 F 614-464-0588

Medical Readiness Facility 115th Fighter Wing Truax Field - Building 506, Madison, Wisconsin

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section TOC Table of Contents

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

TABLE OF CONTENTS

VOLUME 1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 0107 - SEALS PAGE

SECTION 00 3119 - EXISTING CONDITION INFORMATION

SECTION 00 3126 - EXISTING HAZARDOUS MATERIAL INFORMATION

Attachments

Asbestos Analytical Report – Building 307 Asbestos Analytical Report – Building 311

SECTION 00 3132 - GEOTECHNICAL DATA

Attachments

Geotechnical Engineering Report Addendum to Project Geotechnical Engineering Report

SECTION 00 4323 - ALTERNATES FORM

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 1000 – SUMMARY

Attachment

Contractor's Security Briefing

SECTION 01 2300 - ALTERNATES

SECTION 01 2500 - SUBSTITUTION PROCEDURES

SECTION 01 2600 - CONTRACT MODIFICATION PROCEDURES

SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION

SECTION 01 3200 - CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 01 3233 - PHOTOGRAPHIC DOCUMENTATION

SECTION 01 3300 - SUBMITTAL PROCEDURES

Attachment

Submittal Report

SECTION 01 3329 – SUSTAINABILITY REPORTING

SECTION 01 4000 - QUALITY REQUIREMENTS

SECTION 01 4200 - REFERENCES

SECTION 01 5000 - TEMPORARY FACILITIES AND CONTROLS

SECTION 01 6000 - PRODUCT REQUIREMENTS

SECTION 01 7300 - EXECUTION

SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Attachments Form CWM-1 Form CWM-2 Form CWM-3 Form CWM-4 Form CWM-5 Form CWM-6 Form CWM-7 Form CWM-8

SECTION 01 7700 - CLOSEOUT PROCEDURES

SECTION 01 7823 - OPERATION AND MAINTENANCE DATA

SECTION 01 7839 - PROJECT RECORD DOCUMENTS

SECTION 01 7900 - DEMONSTRATION AND TRAINING

SECTION 01 9113 - GENERAL COMMISSIONING REQUIREMENTS

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section TOC Table of Contents

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 4116 - STRUCTURE DEMOLITION

SECTION 08 8200 - ASBESTOS REMEDIATION

DIVISION 03 - CONCRETE

SECTION 03 3000 - CAST-IN-PLACE CONCRETE

SECTION 03 4100 - PRECAST STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

SECTION 04 2000 - UNIT MASONRY

DIVISION 05 - METALS

SECTION 05 1200 - STRUCTURAL STEEL FRAMING

SECTION 05 2100 - STEEL JOIST FRAMING

SECTION 05 3100 - STEEL DECKING

SECTION 05 4000 - COLD-FORMED METAL FRAMING

SECTION 05 5000 - METAL FABRICATIONS

SECTION 05 5113 - METAL PAN STAIRS

SECTION 05 5213 - PIPE AND TUBE RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

SECTION 06 0513 - DECORATIVE PLASTIC LAMINATE FINISHES

SECTION 06 1000 - ROUGH CARPENTRY

SECTION 06 1600 - SHEATHING

SECTION 06 4116 - PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

SECTION 06 4219 - PLASTIC-LAMINATE-FACED WOOD PANELING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 1326 - SELF-ADHERING SHEET WATERPROOFING

SECTION 07 1900 - WATER REPELLENTS

SECTION 07 2100 - THERMAL INSULATION

SECTION 07 2500 - WEATHER BARRIERS

SECTION 07 2600 - VAPOR RETARDERS

SECTION 07 4113.16 - STANDING SEAM METAL ROOF PANELS

SECTION 07 4210 - METAL WALL PANEL SUPPORT

SECTION 07 4213.13 - METAL WALL PANEL

SECTION 07 4293 - SOFFIT PANELS

SECTION 07 5323 - EPDM ROOFING

SECTION 07 6200 - SHEET METAL FLASHING AND TRIM

SECTION 07 7100 - ROOF SPECIALTIES

SECTION 07 7200 - ROOF ACCESSORIES

SECTION 07 7253 - SNOW GUARDS

SECTION 07 8413 - PENETRATION FIRESTOPPING

SECTION 07 8443 - JOINT FIRESTOPPING

SECTION 07 9100 - PREFORMED JOINT SEALS

SECTION 07 9200 - JOINT SEALANTS

DIVISION 08 - OPENINGS

SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES

SECTION 08 1416 - FLUSH WOOD DOORS

SECTION 08 3113 - ACCESS DOORS AND FRAMES

SECTION 08 3323 - OVERHEAD COILING DOORS

SECTION 08 3400 - SLIDING OFFICE DOORS

SECTION 08 4113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section TOC Table of Contents

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

SECTION 08 6250 - TUBULAR DAYLIGHTING SYSTEM

SECTION 08 7100 - DOOR HARDWARE

SECTION 08 8000 - GLAZING

SECTION 08 8813 - FIRE-RESISTANT GLAZING

SECTION 08 9119 - FIXED LOUVERS

DIVISION 09 - FINISHES

SECTION 09 2116.23 - GYPSUM BOARD SHAFT WALL ASSEMBLIES

SECTION 09 2216 - NON-STRUCTURAL METAL FRAMING

SECTION 09 2900 - GYPSUM BOARD

SECTION 09 3013 - CERAMIC TILING

SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS

SECTION 09 6513 - RESILIENT BASE AND ACCESSORIES

SECTION 09 6516 - RESILIENT SHEET FLOORING

SECTION 09 6519 - RESILIENT TILE FLOORING

SECTION 09 6623 - RESINOUS MATRIX TERRAZZO FLOORING

SECTION 09 6813 - TILE CARPETING

SECTION 09 9106 - FLOOR SEALER - SC1

SECTION 09 9113 - EXTERIOR PAINTING

SECTION 09 9123 - INTERIOR PAINTING

SECTION 09 9600 - HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

SECTION 10 1423.16 - ROOM IDENTIFICATION PANEL SIGNAGE

SECTION 10 2113.13 - METAL TOILET COMPARTMENTS

SECTION 10 2123 - CUBICLE CURTAINS AND TRACK

SECTION 10 2239 - FOLDING PANEL PARTITIONS

SECTION 10 2800 - TOILET AND BATH ACCESSORIES

SECTION 10 4413 - FIRE PROTECTION CABINETS

SECTION 10 4416 - FIRE EXTINGUISHERS

SECTION 10 5123 - PLASTIC-LAMINATE-CLAD LOCKERS

DIVISION 11 - EQUIPMENT

SECTION 11 2429 - FALL PROTECTION EQUIPMENT

DIVISION 12 - FURNISHINGS

SECTION 12 2413 - ROLLER WINDOW SHADES

SECTION 12 3661.16 - SOLID SURFACE MATERIALS

SECTION 12 4816 - ENTRANCE FLOOR GRILLES

DIVISION 13 - SPECIAL CONSTRUCTION

NOT APPLICABLE

DIVISION 14 - CONVEYING EQUIPMENT

SECTION 14 2123.16 - MACHINE-ROOM-LESS ELECTRIC TRACTION PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

SECTION 21 0517 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING

SECTION 21 0523 - GENERAL-DUTY VALVES FOR FIRE PROTECTION PIPING

SECTION 21 0529 - HANGERS AND SUPPORTS FOR FIRE SUPRESSION PIPING AND EQUIPMENT

SECTION 21 0553 - IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT

SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION

SECTION 21 1100 - FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING

SECTION 21 1116 - FACILITY FIRE HYDRANTS

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section TOC Table of Contents

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

SECTION 21 1119 - FIRE DEPARTMENT CONNECTIONS

SECTION 21 1313 - WET-PIPE SPRINKLER SYSTEMS

VOLUME 2

DIVISION 22 - PLUMBING

SECTION 22 0501 - COMMON WORK RESULTS FOR PLUMBING

SECTION 22 0507 - EXCAVATION AND BACKFILL

SECTION 22 0513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

SECTION 22 0519 - METERS AND GAUGES FOR PLUMBING PIPING

SECTION 22 0523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING

SECTION 22 0529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION 22 0548 - VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION 22 0561 - PREPARATION OF PLUMBING SYSTEMS

SECTION 22 0593 - PLUMBING SYSTEMS TESTING, ADJUSTING, AND BALANCING

SECTION 22 0700 - PLUMBING INSULATION

SECTION 22 1116 - DOMESTIC WATER PIPING

SECTION 22 1316 - BUILDING SANITARY, STORM DRAINAGE, AND ACID WASTE

SECTION 22 1331 - ELEVATOR SUMP PUMP

SECTION 22 2000 - FACILITY NATURAL GAS SYSTEM

SECTION 22 3100 - DOMESTIC WATER SOFTENERS

SECTION 22 3300 - DOMESTIC GAS WATER HEATERS

SECTION 22 4000 - PLUMBING FIXTURES

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

SECTION 23 0500 - GENERAL MECHANICAL REQUIREMENTS

SECTION 23 0519 - METERS AND GAUGES FOR HVAC PIPING

SECTION 23 0523 - VALVES FOR HVAC PIPING

SECTION 23 0529 - HANGERS, SLEEVES, AND SUPPORTS

SECTION 23 0548 - VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT

SECTION 23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 23 0593 - MECHANICAL SYSTEMS TESTING, ADJUSTING, AND BALANCING

SECTION 23 0700 - HVAC INSULATION

SECTION 23 0800 - MECHANICAL SYSTEMS COMMISSIONING REQUIREMENTS

SECTION 23 0900 - HVAC INSTRUMENTATION AND CONTROL

SECTION 23 2113 - HYDRONIC PIPING

SECTION 23 2116 - HYDRONIC SPECIALTIES

SECTION 23 2123 - HYDRONIC PUMPS

SECTION 23 2300 - REFRIGERANT PIPING

SECTION 23 2500 - HVAC WATER TREATMENT

SECTION 23 3000 - DUCTWORK AND ACCESSORIES

SECTION 23 3400 - EXHAUST AND VENTILATING FANS

SECTION 23 3616 - TERMINAL BOXES - DDC CONTROL

SECTION 23 5216 - CONDENSING BOILERS

SECTION 23 7415 - PACKAGED GAS HEATING AND ELECTRIC COOLING UNITS

SECTION 23 8126 - DUCTLESS SPLIT SYSTEM UNITS

SECTION 23 8223 - CABINET-TYPE UNIT HEATERS

SECTION 23 8224 - PROPELLER-TYPE UNIT HEATERS

SECTION 23 8236 - PERIMETER HEAT

DIVISION 25 - INTEGRATED AUTOMATION

NOT APPLICABLE

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section TOC Table of Contents

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

DIVISION 26 - ELECTRICAL

SECTION 26 0505 - BASIC ELECTRICAL REQUIREMENTS

SECTION 26 0519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

SECTION 26 0523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES

SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 26 0543 - UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

SECTION 26 0544 - SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 26 0573.13 - SHORT-CIRCUIT STUDIES

SECTION 26 0573.16 - COORDINATION STUDIES

SECTION 26 0913 - ELECTRICAL POWER MONITORING AND CONTROL

SECTION 26 0923 - LIGHTING CONTROL DEVICES

SECTION 26 0936 - MODULAR DIMMING CONTROLS

SECTION 26 2213 - LOW-VOLTAGE DISTRIBUTION TRANSFORMERS

SECTION 26 2413 - SWITCHBOARDS

SECTION 26 2416 - PANELBOARDS

SECTION 26 2726 - WIRING DEVICES

SECTION 26 2816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION 26 3323.11 - CENTRAL BATTERY EQUIPMENT FOR EMERGENCY LIGHTING

SECTION 26 3600 - TRANSFER SWITCHES

SECTION 26 4113 - LIGHTNING PROTECTION FOR STRUCTURES

SECTION 26 4313 - SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION 26 5119 - LED INTERIOR LIGHTING

SECTION 26 5213 - EMERGENCY AND EXIT LIGHTING

SECTION 26 5619 - LED EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

SECTION 27 0526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

SECTION 27 0528 - PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 0529 - HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS

SECTION 27 0536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 0543 - UNDERGROUND PATHWAYS AND STRUCTURES FOR COMMUNICATION SYSTEMS

SECTION 27 0544 - SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND CABLING

SECTION 27 0553 - IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

SECTION 27 1100 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS

SECTION 27 1116 - COMMUNICATIONS RACKS, FRAMES, AND ENCLOSURES

SECTION 27 1313 - COMMUNICATIONS COPPER BACKBONE CABLING

SECTION 27 1323 - COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING

SECTION 27 1333 - COMMUNICATIONS COAXIAL BACKBONE CABLING

SECTION 27 1513 - COMMUNICATIONS COPPER HORIZONTAL CABLING

SECTION 27 1523 - COMMUNICATIONS OPTICAL FIBER HORIZONTAL CABLING

SECTION 27 1533 - COMMUNICATIONS COAXIAL HORIZONTAL CABLING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SECTION 28 1300 - ACCESS CONTROL SOFTWARE AND DATABASE MANAGEMENT

SECTION 28 1500 - ACCESS CONTROL HARDWARE DEVICES

SECTION 28 2000 - VIDEO SURVEILLANCE

SECTION 28 3100 - INTRUSION DETECTION

SECTION 28 4621.11 - ADDRESSABLE FIRE-ALARM/VOICE EVAC-MASS NOTIFICATION SYSTEMS

SECTION 28 4700 - MASS NOTIFICATION SYSTEMS

DIVISION 31 - EARTHWORK

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section TOC Table of Contents

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

SECTION 31 2000 - EARTH MOVING

SECTION 31 6613 - AGGREGATE PIERS

DIVISION 32 - EXTERIOR IMPROVEMENTS

SECTION 32 1443 - POROUS UNIT PAVING

DIVISIONS 33 - 48

NOT APPLICABLE

END OF TABLE OF CONTENTS

Medical Readiness Facility, 115th Fighter Wing Truax Field – Building 506, Madison, Wisconsin

P.O. No. W9133L-16-D-0009 Order No. W912J219F6007

AECOM No. 60613250

B-3 Submittal

Section 00 0107

SEALS PAGE

Project No. HTUV152005

MEDICAL REDINESS FACILITY

July 8, 2021

DOCUMENT 00 0107

SEALS PAGE

PART 1 - GENERAL

1.01 DESIGN PROFESSIONALS OF RECORD

A. Architect B. Civil Engineer:

C. Structural Engineer: D. Fire-Protection Engineer:

E. Plumbing Engineer: F. HVAC Engineer:

Medical Readiness Facility, 115th Fighter Wing Truax Field – Building 506, Madison, Wisconsin

P.O. No. W9133L-16-D-0009 Order No. W912J219F6007

AECOM No. 60613250

B-3 Submittal

Section 00 0107

SEALS PAGE

Project No. HTUV152005

MEDICAL REDINESS FACILITY

July 8, 2021

G. Electrical Engineer:

END OF DOCUMENT

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section 00 3119

EXISTING CONDITION INFORMATION

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

DOCUMENT 003119

EXISTING CONDITION INFORMATION

PART 1 - GENERAL

1.01 EXISTING CONDITION INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. Existing specifications and submittals that include information on existing conditions including previous construction at Project site are available for viewing at the office of Government.

C. Survey information that includes information on existing conditions is available for viewing as part of Drawings.

D. Related Requirements:

1. Document 00 3126 "Existing Hazardous Material Information" for hazardous materials reports that are made available to bidders.

2. Document 00 3132 "Geotechnical Data" for reports and soil-boring data from geotechnical investigations that are made available to bidders.

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section 00 3126

EXISTING HAZARDOUS MATERIAL INFORMATION

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

DOCUMENT 00 3126

EXISTING HAZARDOUS MATERIAL INFORMATION

PART 1 - GENERAL

1.01 EXISTING HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. An existing asbestos report for both Buildings 307 and 311, prepared by Eurofins, dated November 25, 2019, is available for viewing on Project Web site as appended to this Document.

C. Related Requirements:

1. Document 00 3119 "Existing Condition Information" for information about existing conditions that is made available to bidders.

2. Document 00 3132 "Geotechnical Data" for reports and soil-boring data from geotechnical investigations that are made available to bidders.

3. Section 02 4119 "Selective Demolition" for notification requirements if materials suspected of containing hazardous materials are encountered.

END OF DOCUMENT 003126

November 25, 2019

AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

CLIENT PROJECT: WI ANG - Medical Readiness Center, Building 307, 60613250

CEI LAB CODE: B198430

Dear Customer:

Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on November 18, 2019. The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600 Method.

Sample results containing >1% asbestos are considered asbestos-containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1% asbestos by weight as determined by visual estimation.

Thank you for your business and we look forward to continuing good relations.

730 SE Maynard Road • Cary, NC 27511 • 919.481.1413

Tianbao Bai, Ph.D., CIH Laboratory Director

Kind Regards, ASBESTOS ANALYTICAL REPORT

By: Polarized Light Microscopy

Prepared for

AECOM Columbus

CLIENT PROJECT:

LAB CODE:

TEST METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

REPORT DATE:

TOTAL SAMPLES ANALYZED:

# SAMPLES >1% ASBESTOS:

WI ANG - Medical Readiness Center, Building 307, 60613250

B198430

11/25/19

Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY

PROJECT: WI ANG - Medical Readiness Center, Building 307, 60613250

LAB CODE: B198430

Client ID Lab ID Color Sample Description

ASBESTOS

%Layer

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

B127117 Black Plastic Trim None Detected01A

B127118 Yellow,Tan Mastic None Detected01B

B127119 Beige Floor Tile None Detected2A

Layer 1 B127120 Yellow Mastic None Detected2B

Layer 2 B127120 Gray Leveling Compound None Detected

B127121 White Tile None Detected3

B127122 Cream Tile None Detected4

B127123 Brown Grout None Detected5

B127124 White Grout None Detected6

B127125 Yellow Insulation None Detected7

B127126 White Drop Ceiling None Detected8

B127127 White Lightly Textured Dimpled Ceiling Tile

None Detected9

Layer 1 B127128 White Heavy Dimpled / Textured Dimpled Ceiling Tile

None Detected10

Layer 2 B127128 White Heavy Dimpled / Textured Dimpled Ceiling Tile

None Detected

B127129 Blue Paint None Detected11

B127130 Brown Plastic Trim None Detected12A

B127131 Yellow Mastic None Detected12B

B127132 Gray Carpet None Detected13A

B127133 Yellow Mastic None Detected13B

B127134 White Paint None Detected14

B127135 White Caulk None Detected15A

B127136 White Paint None Detected15B

B127137 White Caulk None Detected16

B127138 White Drywall None Detected17A

B127139 Cream Paint None Detected17B

B127140 Yellow Spray Foam None Detected18

B127141 Black Foam Pipe Wrap None Detected19A

B127142 Black Foam Pipe Wrap None Detected19B

B127143 Black Foam Pipe Wrap None Detected19C

PROJECT: WI ANG - Medical Readiness Center, Building 307, 60613250

LAB CODE: B198430

Client ID Lab ID Color Sample Description

ASBESTOS

%Layer

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

B127144 Yellow Pipe Wrap None Detected20A

B127145 Yellow Pipe Wrap None Detected20B

B127146 Yellow Pipe Wrap None Detected20C

B127147 Brown Putty None Detected21

B127148 Brown Older Pipe Wrap None Detected22A

B127149 Brown Older Pipe Wrap None Detected22B

B127150 Brown Older Pipe Wrap None Detected22C

B127151 Black Door Weather Stripping None Detected23

B127152 Black Twisted On Pipe Wrap None Detected24A

B127153 Black Twisted On Pipe Wrap None Detected24B

B127154 Black Twisted On Pipe Wrap None Detected24C

B127155 Clear Sealant None Detected25

B127156 Cream Exterior Paint None Detected26

B127157 White Caulk None Detected27

B127158 White Caulk None Detected28

B127159 White Sealant None Detected29

B127160 White Sealant None Detected30

B127161A Gray Tile None Detected31

B127161B Tan Mastic None Detected

B127162A Gray Tile None Detected32

B127162B Tan Mastic None Detected

ASBESTOS BULK ANALYSIS

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

Black Plastic Trim01A

B127117 Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Yellow,Tan Mastic01B

B127118 Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Beige Floor Tile2A

B127119 Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Yellow 2B

B127120

Homogeneous

Non-fibrous Bound

100% Mastic None Detected Layer 1

Mastic

Gray Leveling Compound

B127120 10%Heterogeneous

Non-fibrous Bound

100%Cellulose Binder None DetectedLayer 2

White Tile3

B127121 Homogeneous

Non-fibrous Tightly Bound

60% 40%

Silicates Binder

None Detected

Cream Tile4

B127122 Homogeneous

Non-fibrous Tightly Bound

60% 40%

Silicates Binder

None Detected

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

Brown Grout5

B127123 Homogeneous

Non-fibrous Bound

75% 25%

Silicates Binder

None Detected

White Grout6

B127124 Homogeneous

Non-fibrous Bound

75% 25%

Silicates Binder

None Detected

Yellow Insulation7

B127125 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

White Drop Ceiling8

B127126 15%Heterogeneous

Fibrous Bound

80% 5% <1%

Cellulose Gypsum Paint Vermiculite

None Detected

White Lightly Textured Dimpled Ceiling Tile

B127127

40% 25%

Heterogeneous

Fibrous Loosely Bound

30% 5%

Cellulose Fiberglass

Perlite Paint

None Detected

White

B127128

40% 25%

Heterogeneous

Fibrous Loosely Bound

30% 5%

Cellulose Fiberglass

Perlite Paint

None Detected Layer 1

Heavy Dimpled / Textured Dimpled Ceiling Tile

White Heavy Dimpled / Textured Dimpled Ceiling Tile

B127128 15%Heterogeneous

Fibrous Loosely Bound

85%Cellulose Gypsum None DetectedLayer 2

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

Blue Paint11

B127129 Homogeneous

Non-fibrous Bound

100% Paint None Detected

Brown Plastic Trim12A

B127130 Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Yellow Mastic12B

B127131 Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Gray Carpet13A

B127132 100%Homogeneous

Fibrous Bound

Synthetic Fiber None Detected

Yellow Mastic13B

B127133 Homogeneous

Non-fibrous Bound

100% Mastic None Detected

White Paint14

B127134 Homogeneous

Non-fibrous Bound

100% Paint None Detected

White Caulk15A

B127135 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

White Paint15B

B127136 Homogeneous

Non-fibrous Bound

100% Paint None Detected

White Caulk16

B127137 Heterogeneous

Non-fibrous Bound

95% 5%

Caulk Paint

None Detected

White Drywall17A

B127138 15%Heterogeneous

Fibrous Bound

85%Cellulose Gypsum None Detected

Cream Paint17B

B127139 Homogeneous

Non-fibrous Bound

100% Paint None Detected

Yellow Spray Foam18

B127140 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Black Foam Pipe Wrap19A

B127141 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Black Foam Pipe Wrap19B

B127142 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

Black Foam Pipe Wrap19C

B127143 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Yellow Pipe Wrap20A

B127144 10% 80%

Heterogeneous

Fibrous Bound

10%Cellulose Fiberglass

Metal Foil None Detected

Yellow Pipe Wrap20B

B127145 10% 80%

Heterogeneous

Fibrous Bound

10%Cellulose Fiberglass

Metal Foil None Detected

Yellow Pipe Wrap20C

B127146 10% 80%

Heterogeneous

Fibrous Bound

10%Cellulose Fiberglass

Metal Foil None Detected

Brown Putty21

B127147 Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Brown Older Pipe Wrap22A

B127148 100%Homogeneous

Non-fibrous Loose

Fiberglass None Detected

Brown Older Pipe Wrap22B

B127149 100%Homogeneous

Non-fibrous Loose

Fiberglass None Detected

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

Brown Older Pipe Wrap22C

B127150 100%Homogeneous

Non-fibrous Loose

Fiberglass None Detected

Black Door Weather Stripping23

B127151 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

Black Twisted On Pipe Wrap24A

B127152 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Black Twisted On Pipe Wrap24B

B127153 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Black Twisted On Pipe Wrap24C

B127154 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Clear Sealant25

B127155 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

Cream Exterior Paint26

B127156 Homogeneous

Non-fibrous Bound

100% Paint None Detected

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

White Caulk27

B127157 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

White Caulk28

B127158 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

White Sealant29

B127159 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

White Sealant30

B127160 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

Gray Tile31

B127161A 5%Homogeneous

Fibrous Bound

95%Cellulose Vinyl None Detected

Tan MasticB127161B Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Gray Tile32

B127162A 5%Homogeneous

Fibrous Bound

95%Cellulose Vinyl None Detected

Lab Code: B198430 Date Received: 11-18-19 Date Analyzed: 11-22-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 307, 60613250

Fibrous

Tan MasticB127162B Homogeneous

Non-fibrous Bound

100% Mastic None Detected

LEGEND: Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

REPORTING LIMIT: <1% by visual estimation

REPORTING LIMIT FOR POINT COUNTS: 0.25% by 400 Points or 0.1% by 1,000 Points

REGULATORY LIMIT: >1% by weight

Due to the limitations of the EPA 600 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request.

This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by Eurofins CEI. Eurofins CEI makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results.

Interpretation of the analytical results is the sole responsibility of the client. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government.

Information provided by customer includes customer sample ID and sample description.

ANALYST: APPROVED BY:

Tianbao Bai, Ph.D., CIH

Ryan Steele

November 25, 2019

AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

CLIENT PROJECT: WI ANG - Medical Readiness Center, Building 311, 60613250

CEI LAB CODE: B198450

Dear Customer:

Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on November 18, 2019. The samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600 Method.

Sample results containing >1% asbestos are considered asbestos-containing materials (ACMs) per EPA regulatory requirements. The detection limit for the EPA 600 Method is <1% asbestos by weight as determined by visual estimation.

Thank you for your business and we look forward to continuing good relations.

730 SE Maynard Road • Cary, NC 27511 • 919.481.1413

Tianbao Bai, Ph.D., CIH

Kind Regards, ASBESTOS ANALYTICAL REPORT

By: Polarized Light Microscopy

Prepared for

AECOM Columbus

CLIENT PROJECT:

LAB CODE:

TEST METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

REPORT DATE:

TOTAL SAMPLES ANALYZED:

# SAMPLES >1% ASBESTOS:

WI ANG - Medical Readiness Center, Building 311, 60613250

B198450

11/25/19

PROJECT: WI ANG - Medical Readiness Center, Building 311, 60613250

LAB CODE: B198450

Client ID Lab ID Color Sample Description

ASBESTOS

%Layer

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

B127935 Yellow,Black Mastic Chrysotile1 3% B127936 White,Black Mastic None Detected2

B127937 Gray,Tan Drywall None Detected3

B127938 Yellow Insulation None Detected4

B127939 Yellow Pipe Insulation None Detected5a

B127940 Yellow Pipe Insulation None Detected5b

B127941 Yellow Pipe Insulation None Detected5c

B127942 Pink Pipe Insulation None Detected6a

B127943 Pink Pipe Insulation None Detected6b

B127944 Pink Pipe Insulation None Detected6c

B127945 White Pipe Insulation None Detected7a

B127946 White Pipe Insulation None Detected7b

B127947 White Pipe Insulation None Detected7c

B127948 White Tile None Detected8

B127949 Brown Tile None Detected9

B127950 Gray Grout None Detected10a

B127951 Gray Grout None Detected10b

B127952 Gray Grout None Detected10c

B127953 Yellow,Black Mastic None Detected11

B127954 Pink Tile None Detected12

B127955A Gray / White, Black / Beige

Tile None Detected13

B127955B Cream Mastic None Detected

B127956 Blue,White Linoleum None Detected14a

B127957 Yellow Mastic None Detected14b

Layer 1 B127958 Yellow Mastic None Detected15a

Layer 2 B127958 Gray Tile None Detected

B127959A Gray Flat Texture None Detected15b

B127959B Black Mastic Chrysotile 3% B127960 Black Pipe Foam None Detected16a

B127961 Black Pipe Foam None Detected16b

PROJECT: WI ANG - Medical Readiness Center, Building 311, 60613250

LAB CODE: B198450

Client ID Lab ID Color Sample Description

ASBESTOS

%Layer

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

B127962 Black Pipe Foam None Detected16c

B127963 Gray,Tan Pipe Wrap None Detected17a

B127964 Gray,Tan Pipe Wrap None Detected17b

B127965 Gray,Tan Pipe Wrap None Detected17c

B127966 White Caulk None Detected18

B127967 Gray Caulk None Detected19

B127968 Yellow Foam None Detected20

B127969 Yellow,Blue Mastic None Detected21

B127970 Orange Tile None Detected22

B127971 White,Beige Surfacing Material None Detected23a

B127972 White,Beige Surfacing Material None Detected23b

B127973 White Surfacing Material None Detected23c

B127974 White Surfacing Material None Detected23d

B127975 White Surfacing Material None Detected23e

B127976 Yellow,Brown Caulk None Detected24

B127977 Gray,White Caulk None Detected25

B127978 Gray,Clear Silicon None Detected26

B127979A Beige Linoleum None Detected27

B127979B Clear Mastic None Detected

B127980A Beige Tile None Detected28

B127980B Cream Mastic None Detected

B127981 Gray Tile None Detected29

Layer 1 B127982 Multicolored Tile None Detected30

Layer 2 B127982 Gray Grout None Detected

B127983A Cream Tile None Detected31

B127983B Yellow Mastic None Detected

Layer 1 B127984 Black,White Tile None Detected32

Layer 2 B127984 White Grout None Detected

B127985A White Tile None Detected33

B127985B Tan Mastic None Detected

B127986 White Grout None Detected34

PROJECT: WI ANG - Medical Readiness Center, Building 311, 60613250

LAB CODE: B198450

Client ID Lab ID Color Sample Description

ASBESTOS

%Layer

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

B127987 Black Pipe Wrap None Detected35a

B127988 Black Pipe Wrap None Detected35b

B127989 Black Pipe Wrap None Detected35c

B127990 White Foam None Detected36

B127991 Blue Foam Insulation None Detected37

B127992 White,Beige Heavy Texture Drop Ceiling None Detected38

B127993 Off-white,Tan Smooth Texture Drop Ceiling None Detected39

B127994 Red,Tan Paint None Detected40

Layer 1 B127995 White,Beige Paint None Detected41

Layer 2 B127995 Beige Mud Chrysotile 2% Layer 1 B127996 Gray,Tan Paint None Detected42

Layer 2 B127996 White Mud None Detected

B127997A Black Baseboard None Detected43

B127997B Tan Mastic None Detected

B127998A Gray Baseboard None Detected44

B127998B Cream,Black Mastic None Detected

B127999 Light Gray, White

Window And Door Caulk None Detected45

B128000 White,Yellow Pipe Wrap None Detected46a

B128001 White,Yellow Pipe Wrap None Detected46b

B128002 White,Yellow Pipe Wrap None Detected46c

B128003 White,Orange Paint None Detected47

B128004 Gray,White Weather Stripping None Detected48

Layer 1 B128005 Yellow Mastic None Detected49

Layer 2 B128005 Black Mastic Chrysotile 3%

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Yellow,Black Mastic1

B127935 <1%Heterogeneous

Non-fibrous Bound

Lab Notes: Unable to separate yellow and black mastics for analysis.

95% 2%

Cellulose Mastic Silicates

3% Chrysotile

White,Black Mastic2

B127936 <1%Heterogeneous

Non-fibrous Bound

Lab Notes: Unable to separate white and black mastics for analysis.

100% <1%

Cellulose Mastic Paint

None Detected

Gray,Tan Drywall3

B127937 20%Heterogeneous

Fibrous Bound

80% <1%

Cellulose Gypsum Paint

None Detected

Yellow Insulation4

B127938 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

Yellow Pipe Insulation5a

B127939 100% <1%

Homogeneous

Fibrous Loose

Fiberglass Cellulose

None Detected

Yellow Pipe Insulation5b

B127940 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

Yellow Pipe Insulation5c

B127941 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Pink Pipe Insulation6a

B127942 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

Pink Pipe Insulation6b

B127943 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

Pink Pipe Insulation6c

B127944 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

White Pipe Insulation7a

B127945 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

White Pipe Insulation7b

B127946 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

White Pipe Insulation7c

B127947 100%Homogeneous

Fibrous Loose

Fiberglass None Detected

White Tile8

B127948 Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Brown Tile9

B127949 Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

None Detected

Gray Grout10a

B127950 <1%Homogeneous

Non-fibrous Tightly Bound

70% 30%

Cellulose Binder Silicates

None Detected

Gray Grout10b

B127951 <1%Homogeneous

Non-fibrous Tightly Bound

70% 30%

Cellulose Binder Silicates

None Detected

Gray Grout10c

B127952 <1%Homogeneous

Non-fibrous Tightly Bound

70% 30%

Cellulose Binder Silicates

None Detected

Yellow,Black Mastic11

B127953 7% 3%

Homogeneous

Fibrous Bound

85% 5%

Synthetic Fiber Cellulose

Mastic Tar

None Detected

Pink Tile12

B127954 Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

None Detected

Gray / White, Black / Beige

Tile13 B127955A

Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Cream MasticB127955B Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Blue,White Linoleum14a

B127956 Heterogeneous

Non-fibrous Tightly Bound

50% 40% 10%

Vinyl Foam Binder

None Detected

Yellow Mastic14b

B127957 Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Yellow 15a

B127958

<1%Homogeneous

Non-fibrous Bound

100%Cellulose Mastic None Detected Layer 1

Mastic

Gray Tile

B127958 5%Homogeneous

Fibrous Bound

95%Cellulose Vinyl None DetectedLayer 2

Gray Flat Texture15b

B127959A 15%Homogeneous

Fibrous Bound

85%Cellulose Binder None Detected

Black MasticB127959B <1%Homogeneous

Non-fibrous Bound

97%Cellulose Tar 3% Chrysotile

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Black Pipe Foam16a

B127960 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Black Pipe Foam16b

B127961 Homogeneous

Non-fibrous Bound

100% <1%

Foam Mastic

None Detected

Black Pipe Foam16c

B127962 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Gray,Tan Pipe Wrap17a

B127963 5%Heterogeneous

Fibrous Bound

70% 20% 5%

Cellulose Foam Binder Mastic

None Detected

Gray,Tan Pipe Wrap17b

B127964 5%Heterogeneous

Fibrous Bound

70% 20% 5%

Cellulose Foam Binder Mastic

None Detected

Gray,Tan Pipe Wrap17c

B127965 5%Heterogeneous

Fibrous Bound

70% 20% 5%

Cellulose Foam Binder Mastic

None Detected

White Caulk18

B127966 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Gray Caulk19

B127967 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

Yellow Foam20

B127968 <1%Homogeneous

Non-fibrous Bound

100%Cellulose Foam None Detected

Yellow,Blue Mastic21

B127969 Heterogeneous

Non-fibrous Bound

100% <1%

Mastic Paint

None Detected

Orange Tile22

B127970 Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

None Detected

White,Beige Surfacing Material23a

B127971 3%Heterogeneous

Non-fibrous Bound

65% 30% 2%

Talc Silicates Binder Paint

None Detected

White,Beige Surfacing Material23b

B127972 5% 3%

Heterogeneous

Fibrous Bound

60% 30% 2%

Cellulose Talc

Silicates Binder Paint

None Detected

White Surfacing Material23c

B127973 3%Heterogeneous

Non-fibrous Bound

65% 30% 2%

Talc Silicates Binder Paint

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

White Surfacing Material23d

B127974 3%Heterogeneous

Non-fibrous Bound

65% 30% 2%

Talc Silicates Binder Paint

None Detected

White Surfacing Material23e

B127975 3%Heterogeneous

Non-fibrous Bound

65% 30% 2%

Talc Silicates Binder Paint

None Detected

Yellow,Brown Caulk24

B127976 Heterogeneous

Non-fibrous Bound

100% <1%

Caulk Paint

None Detected

Gray,White Caulk25

B127977 Heterogeneous

Non-fibrous Bound

100% <1%

Caulk Paint

None Detected

Gray,Clear Silicon26

B127978 Homogeneous

Non-fibrous Bound

100% Caulk None Detected

Beige Linoleum27

B127979A Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Clear MasticB127979B Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Beige Tile28

B127980A Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Cream MasticB127980B <1%Homogeneous

Non-fibrous Bound

100% <1%

Cellulose Mastic Binder

None Detected

Gray Tile29

B127981 Homogeneous

Non-fibrous Tightly Bound

70% 30%

Silicates Binder

None Detected

Multicolored

B127982

Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

None Detected Layer 1

Tile

Gray Grout

B127982 <1%Homogeneous

Non-fibrous Tightly Bound

70% 30%

Cellulose Silicates Binder

None DetectedLayer 2

Cream Tile31

B127983A Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

None Detected

Yellow MasticB127983B 5%Homogeneous

Fibrous Bound

95%Cellulose Mastic None Detected

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Black,White

B127984

Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

None Detected Layer 1

Tile

White Grout

B127984 Homogeneous

Non-fibrous Tightly Bound

70% 30%

Silicates Binder

None DetectedLayer 2

White Tile33

B127985A Homogeneous

Non-fibrous Tightly Bound

90% 10%

Binder Silicates

None Detected

Tan MasticB127985B <1%Homogeneous

Non-fibrous Bound

100%Cellulose Mastic None Detected

White Grout34

B127986 Homogeneous

Non-fibrous Tightly Bound

70% 30%

Silicates Binder

None Detected

Black Pipe Wrap35a

B127987 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Black Pipe Wrap35b

B127988 Homogeneous

Non-fibrous Bound

100% Foam None Detected

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Black Pipe Wrap35c

B127989 Homogeneous

Non-fibrous Bound

100% Foam None Detected

White Foam36

B127990 <1%Homogeneous

Non-fibrous Bound

100%Cellulose Foam None Detected

Blue Foam Insulation37

B127991 <1%Homogeneous

Non-fibrous Bound

100%Cellulose Foam None Detected

White,Beige Heavy Texture Drop Ceiling

B127992

50% 30%

Heterogeneous

Fibrous Loosely Bound

15% 5%

Fiberglass Cellulose

Perlite Paint

None Detected

Off-white,Tan Smooth Texture Drop Ceiling

B127993

15% 5%

Heterogeneous

Fibrous Loosely Bound

80%Cellulose Fiberglass

Gypsum None Detected

Red,Tan Paint40

B127994 3%Homogeneous

Fibrous Bound

97%Cellulose Paint None Detected

White,Beige

B127995

Homogeneous

Non-fibrous Bound

100% Paint None Detected Layer 1

Paint

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Beige Mud

B127995 Heterogeneous

Fibrous Bound

85% 13%

Binder Calc Carb

2% ChrysotileLayer 2

Gray,Tan

B127996

3%Homogeneous

Fibrous Bound

97%Cellulose Paint None Detected Layer 1

Paint

White Mud

B127996 Heterogeneous

Non-fibrous Bound

85% 15%

Binder Calc Carb

None DetectedLayer 2

Black Baseboard43

B127997A Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Tan MasticB127997B Homogeneous

Non-fibrous Bound

100% Mastic None Detected

Gray Baseboard44

B127998A Homogeneous

Non-fibrous Tightly Bound

100% Vinyl None Detected

Cream,Black MasticB127998B Heterogeneous

Non-fibrous Bound

100% <1% <1%

Mastic Binder Paint

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Light Gray,White Window And Door Caulk

B127999

Homogeneous

Non-fibrous Bound

100% Caulk None Detected

White,Yellow Pipe Wrap46a

B128000 50% 20%

Heterogeneous

Fibrous Bound

20% 10%

Fiberglass Cellulose

Metal Foil Mastic

None Detected

White,Yellow Pipe Wrap46b

B128001 50% 20%

Heterogeneous

Fibrous Bound

20% 10%

Fiberglass Cellulose

Metal Foil Mastic

None Detected

White,Yellow Pipe Wrap46c

B128002 50% 20%

Heterogeneous

Fibrous Bound

20% 10%

Fiberglass Cellulose

Metal Foil Mastic

None Detected

White,Orange Paint47

B128003 Heterogeneous

Non-fibrous Bound

97% 3%

Paint Rust

None Detected

Gray,White Weather Stripping48

B128004 Heterogeneous

Non-fibrous Tightly Bound

100% <1%

Vinyl Paint

None Detected

Yellow

B128005

<1%Homogeneous

Non-fibrous Bound

100%Cellulose Mastic None Detected Layer 1

Mastic

Lab Code: B198450 Date Received: 11-18-19 Date Analyzed: 11-20-19 Date Reported: 11-25-19

Client ID Lab ID

Lab Attributes

Lab Description

ASBESTOS

ASBESTOS BULK PLM, EPA 600 METHOD

NON-ASBESTOS COMPONENTS

Non-Fibrous

Client: AECOM Columbus 277 West Nationwide Blvd Columbus, OH 43215

Project: WI ANG - Medical Readiness Center, Building 311, 60613250

Fibrous

Black Mastic

B128005 5%Homogeneous

Fibrous Bound

92%Cellulose Tar 3% ChrysotileLayer 2

LEGEND: Non-Anth = Non-Asbestiform Anthophyllite Non-Trem = Non-Asbestiform Tremolite Calc Carb = Calcium Carbonate

METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020

REPORTING LIMIT: <1% by visual estimation

REPORTING LIMIT FOR POINT COUNTS: 0.25% by 400 Points or 0.1% by 1,000 Points

REGULATORY LIMIT: >1% by weight

Due to the limitations of the EPA 600 method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarized light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. Estimated measurement of uncertainty is available on request.

This report relates only to the samples tested or analyzed and may not be reproduced, except in full, without written approval by Eurofins CEI. Eurofins CEI makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results.

Interpretation of the analytical results is the sole responsibility of the client. Samples were received in acceptable condition unless otherwise noted. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government.

Information provided by customer includes customer sample ID and sample description.

ANALYST: APPROVED BY:

Tianbao Bai, Ph.D., CIH

Miguel Angel Maysonet

Contract No. W9133L-16-D-0009 Delivery Order No. W912J2-19-F-6007

AECOM No. 60613250

B-3 Submittal

Section 00 3132

GEOTECHNICAL DATA

Project No. XGFG139001

MEDICAL READINESS FACILITY

July 8, 2021

DOCUMENT 003132

GEOTECHNICAL DATA

PART 1 - GENERAL

1.01 GEOTECHNICAL DATA

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Government's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information. This Document and its attachments are not part of the Contract Documents.

B. Because subsurface conditions indicated by the soil borings are a sampling in relation to the entire construction area, and for other reasons, the Government, the Architect, the Architect's consultants, and the firm reporting the subsurface conditions do not warranty the conditions below the depths of the borings or that the strata logged from the borings are necessarily typical of the entire site. Any party using the information described in the soil borings and geotechnical report shall accept full responsibility for its use.

C. A geotechnical investigation report for Project, prepared by GESTRA Engineering, Inc., dated November 8, 2019, as amended February 3, 2020, is available for viewing as appended to this Document.

1. The opinions expressed in this report are those of a geotechnical engineer and represent interpretations of subsoil conditions, tests, and results of analyses conducted by a geotechnical engineer. Government is not responsible for interpretations or conclusions drawn from the data.

2. Any party using information described in the geotechnical report shall make additional test borings and conduct other exploratory operations that may be required to determine the character of subsurface materials that may be encountered.

D. Related Requirements:

1. Document 00 3119 "Existing Condition Information" for information about existing conditions that is made available to bidders.

2. Document 00 3126 "Existing Hazardous Material Information" for hazardous materials reports that are made available to bidders.

GEOTECHNICAL ENGINEERING REPORT

Air National Guard Medical Readiness Building

Truax Field

Madison, Wisconsin

GESTRA Project No.: M19073-10

November 8, 2019

Prepared For:

AECOM

277 West Nationwide Blvd.

Columbus, OH 43215

Geotechnical Engineering Report

Air National Guard Medical Readiness Building

GESTRA Project No. M19073-10

November 8, 2019

Prepared For:

AECOM

277 W. Nationwide Blvd.

Columbus, OH 43215

Prepared By:

GESTRA Engineering, Inc.

191 W. Edgerton Avenue

Milwaukee, WI 53207

(414) 933-7444

Table of Contents

1.0 INTRODUCTION

1.1 PROJECT INFORMATION

2.0 SCOPE OF WORK

3.0 EXPLORATION RESULTS

3.1 SITE CONDITIONS

3.