Photograph Log.docx
DOCX document 3 MB Posted
- Attached to
- Construct Medical Readiness Facility Federal contract opportunity
- Solicitation number
- W50S9F22R0001
- Issued by
- Department of the Army National Guard
About this file
This document summarizes a solicitation for construction services to build a new Medical Readiness Facility at the Wisconsin Air National Guard base in Madison, Wisconsin. The single firm fixed-price contract seeks a contractor to provide all labor, materials, equipment, and supervision necessary to construct an 18,650 square foot, two-story facility for medical training and storage. Key requirements include site work, erecting precast concrete panels, and installing new mechanical, electrical, plumbing and technology systems. The base price contract is between $5-10 million and includes nine options related to additional materials and finishes. The response deadline is May 5th 2022 with a planned award without discussions under a best value determination considering technical, past performance and price factors. The project is scheduled to be completed within 450 days of the notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHOTOGRAPH LOG
Site Name:
Building 311 Site Location:
Wisconsin Air National Guard Project No.
60613250
Photo No.
Date:
11/26/2019
Direction Photo Taken:
Down
Description:
Sample 01: Black and yellow mastic containing 3% Chyrsotile Asbestos.
Photo No.
Date:
Direction Photo Taken:
Description:
Sample 15b: Black mastic/tar containing 3% Chrysotile Asbestos.
Black mastic/tar attached to bottom of bottom layer of tile
Photo No.
Date:
11/26/2019 Bottom tile layer (area where sample 15b was taken) Current tile layer
Direction Photo Taken:
Description:
Area 15b was taken
Photo No.
Date:
11/26/2019 Black mastic found under bottom tile layer Current tile layer Bottom tile layer
Direction Photo Taken:
Description:
Black mastic/tar containing 3% Chrysotile Asbestos found underneath both layers of tiles (Samples 15b and 49)
Photo No.
Date:
Direction Photo Taken:
Northeast
Description:
Sample 41: Beige material (referred to by lab as mud) attached to white paint containing 2% Chrysotile Asbestos
Photo No.
Date:
Location of sample 49
Direction Photo Taken:
Northeast
Description:
Location of Sample 49 (Black mastic/tar containing 3% Chrysotile asbestos underneath top layer of tile) image1.jpeg image2.jpeg image3.png image4.jpeg image5.jpeg image6.jpeg image7.jpg
File details come from the government source that posted it. Updated .