This document contains a questions and answers file related to a federal contract solicitation for construction services. The 115th Fighter Wing at Dane County Regional Airport -Truax Field in Madison, WI is seeking to award a single firm fixed-price contract to construct an 18,650 square foot Medical Readiness facility including administrative space and storage. The solicitation includes a base requirement for construction and nine option items. Offerors must be registered in the System for Award Management and the solicitation will be available on SAM.GOV. The pre-proposal conference is scheduled for March 31, 2022 and proposals are due by May 5, 2022. Evaluation criteria include technical approach, past performance and price. Award is intended without discussions.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Medical Readiness Q&A #04
45. Fixture types X2 and WA are designated in the drawings on pages E101 and E102, but they are not on the fixture schedule. Can you provide details on these fixtures?
A. Waiting for response from A-E firm. Will post once received.
46. Please confirm if permits are indeed required for the water line and sanitary sewer as indicated in C- 001 since this is a federally owned base and city building permits are typically required.
A. Permits with the City of Madison are required. Domestic Water (Madison Water Utility), Electric and Gas (Madison Gas & Electric), and Sanitary Sewer (City of Madison) are all privatized utilities and have jurisdiction.
47. C401/Note 8 indicates to tap existing natural gas main line. Main line is not shown on drawing.
Please indicate where main line is located.
A. Natural Gas Distribution Line parallels the East curb of Pearson Street. It is approximately sited at the end of the leader on Sheet C401
48. 6B/A901 is referenced as “Add Alternate 3”. This does not correspond with any of the optional CLINS. If this is an alternate, what should be included in the base bid for this area of the building?
A. 6A/A901 and 6B/A901 are associated with CLIN 0004 - Option 3: Glazed Interior Storefront.
49. 2C/A901 and 3C/A901 indicates “Add Alternate 5: Roof Plan”. Confirm the add alternate is to furnish/install 14 solar tubes. This does not correspond with any of the options CLINS, please advise where cost should be included.
A. 2A/A901, 2C/A901, 3A/A901 and 3C/A901 are associated with CLIN 0006 – Option 5 Tubular
Daylighting System. Cost associated with this CLIN include 14 skylights, domes, flashing and diffusers.
50. In addition to above #48 and #49, there are multiple other alternates called out in plans that do not correspond with CLIN alternates. Please clarify.
A. 5C/A901 and 5B/A901 are associated with CLIN 0005 – Option 4 Laminated Wall Panels.
B. “Add Alternates” correspond with Option numbers in the solicitation.
51. Please clarify where 5A/A626 condition can be found. We are unclear where a ceiling cloud is located within 10” of an acoustical ceiling (and no wall between) A. Waiting for response from A-E firm. Will post once received.
52. Q&A #32 – If we are to provide access control system, please provide equipment required, material specifications and vendor requirements A. Access control system is sole-sourced to Advantor Systems.
53. Q&A #33 – If we are to provide video surveillance system, please provide equipment required, material specifications and vendor requirements A. Video surveillance system is sole-sourced to Advantor Systems.
54. Q&A #34 – If we are to provide intrusion detection system, please provide equipment required, A. Intrusion detection system is sole-sourced to Advantor Systems.
55. Q&A #35 – If we are to provide wireless access point system, please provide equipment required, A. Provide (2) biscuit jacks in ceiling for wireless access points.
56. Q&A #36 – If we are to provide data racks and comm room equipment, please provide equipment required, material specifications and vendor requirements A. Refer to Sheet T-701 and Division 27 of the Specifications.
57. Please indicate if excess topsoil and fill can be used on site or if it needs to be hauled from the site.
A. Contractor’s discretion - depending on if it meets the requirements of the contract documents.
58. Please confirm that no soil contamination has been found at the site.
A. Soil contamination was not detected during site investigation.
59. Spec section 26 2413 1.02 B refers to section 26 0573.19 “Arc Flash Hazard Analysis.” That referenced spec section isn’t in the spec book. Is the arc flash study required?
A. Waiting for response from A-E firm. Will post once received.
ALL QUESTIONS RECEIVED HAVE BEEN POSTED. NO FURTHER QUESTIONS WILL BE
REVIEWED.