This is Amendment 0001 to Solicitation W50S8R-26-RA005 for a Firm Fixed Price (FFP) construction contract at the 179th Cyberspace Wing in Mansfield, Ohio. The amendment, effective 28 May 2026, incorporates B3 final specifications and drawings, revises the pre-proposal site visit date, extends the proposal closing date from 29 June 2026 to 02 July 2026, and eliminates CMMC level certification requirements by removing clauses 252.204-7025 and 252.204-7021. The solicitation is unrestricted and intends to award to the responsible offeror whose proposal represents best value.

Key submission requirements include: SF Form 1442 signed offer, acknowledged amendments, completed bid schedule with all line items priced, SF24 bid bond, Section 00 22 16 proposal submission requirements, and Section 00 45 00 representations and certifications. Proposals must be submitted electronically via the PIEE website at https://piee.eb.mil by 02 July 2026. A mandatory pre-proposal conference is scheduled for 09 June 2026 at 10:00am EST at the 179th Cyberspace Wing (B164-Aircrew Briefing Room), requiring advance security clearance registration. All questions must be submitted via email to gordon.strom.1@us.af.mil by the fifth business day before closing. The project includes options (line items 0003 and 0004), prevailing wage determination requirements per Davis-Bacon, insurance per FAR 52.228-5, and specification Section 28 10 05 requires sole-source Advantor Systems electronic security equipment. Utility services (water and electric) are provided at no cost to the contractor.

View the file

Other files

File Type Posted
W50S8R26RA005 0005_B403 CYBER Repair (conformed version).pdf PDF
W50S8R26RA005 0005_B403 CYBER Repair.pdf PDF
RFI and Response Document (as of 07 July)_final.pdf PDF
W50S8R26RA005 0004_B403 CYBER Repair (conformed version).pdf PDF
RFI 04_question 6. attach._Geotech Report.pdf PDF
W50S8R26RA005 0004_B403 CYBER Repair.pdf PDF
RFI and Response Document (as of 03 July).pdf PDF
RFI 03_question 7. response attach. 01.pdf PDF
RFI 03_question 7. response attach. 02.pdf PDF
RFI and Response Document (as of 02 July).pdf PDF
RFI 02_question 8. response attachment.pdf PDF
W50S8R26RA005 0003_B403 CYBER Repair (conformed version).pdf PDF
W50S8R26RA005 0003_B403 CYBER Repair.pdf PDF
W50S8R26RA005 0002_B403 CYBER Repair.pdf PDF
EXHIBIT A rev01.pdf PDF
RFI and Response Document (as of 09 June).pdf PDF
Pre-Proposal sign-in sheet.pdf PDF
Pre-Proposal Conference-slides.pptx PPTX presentation
W50S8R26RA005 0002_B403 CYBER Repair (conformed version).pdf PDF
Pre-Proposal Conference minutes_B403 CYBER.pdf PDF
ATTACHMENT 06_B403 Cyber_Drawings (Full size)_B3.pdf PDF
ATTACHMENT 05_B403 Cyber_Drawings (Half size)_B3.pdf PDF
ATTACHMENT 03_B403 Cyber_Specifications (Div 09-25)_B3.pdf PDF
ATTACHMENT 01_B403 Cyber_Narrative_B3.pdf PDF
W50S8R26RA005 0001_B403 CYBER Repair (conformed version).pdf PDF
ATTACHMENT 02_B403 Cyber_Specifications (Div 01-08)_B3.pdf PDF
ATTACHMENT 04_B403 Cyber_Specificatioins (Div 26-33)_B3.pdf PDF
ATTACHMENT 07_B403 Cyber_Interior Design Specs and Drawings_B3.pdf PDF
ATTACHMENT 06_B403 Cyber_Drawings (Full size)_B3.pdf PDF
ATTACHMENT 08_IDS Justification and Approval.pdf PDF
ATTACHMENT 05_B403 Cyber_Drawings (Half size)_B3.pdf PDF
EXHIBIT A.docx DOCX document
EXHIBIT B.docx DOCX document
EXHIBIT D_Letter of Commitment.docx DOCX document
EXHIBIT C_Reference Questionnaire Package.docx DOCX document
W50S8R26RA005_B403 CYBER Repair.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date

29 Jun 2026 02 Jul 2026

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

Miscellaneous text in this section has been modified to:

TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00 10 00 - BID SCHEDULE, NOTES

SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00 21 16 - SUBMISSION REQUIREMENTS AND INSTRUCTIONS

SECTION 00 22 16 - PROPOSAL EVALUATIONS AND BASIS OF AWARD

SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS

SECTION 00 70 00 - CONTRACT CLAUSES

SECTION 00 73 00 - WAGE DETERMINATION

SECTION 01 00 00 - GENERAL REQUIREMENTS

W50S8R26RA0050001

(PLANS AND SPECIFICATIONS Project No. dated PBXP 222050 May 2026)

ATTACHMENT 1 - B403 CYBER_NARRATIVE_B3

ATTACHMENT 2 - B403 CYBER_SPECIFICATIONS (DIV 01-08) _B3

ATTACHMENT 3 - B403 CYBER_SPECIFICATIONS (DIV 09-25) _B3

ATTACHMENT 4 - B403 CYBER_SPECIFICATIONS (DIV 26-33) _B3

ATTACHMENT 5 - B403 CYBER_DRAWINGS (HALF-SIZE)_B3

ATTACHMENT 6 - B403 CYBER_DRAWINGS (FULL-SIZE)_B3

ATTACHMENT 7 - B403 CYBER_INTERIOR DESIGN, SPECS & DRAWINGS _B3

ATTACHMENT 8 - IDS JUSTIFICATION AND APPROVAL

EXHIBIT A - Performance Relevancy Questionnaire

EXHIBIT B - Subcontractor Information and Consent Form

EXHIBIT C - Reference Questionnaire package

EXHIBIT D - Letter of Commitment

SECTION 00 10 00 - NOTES

1. Instructions for the preparation of proposals are in Sections 00 21 00, 00 21 16, and 00 22 16.

2. A complete proposal package MUST contain the following:

Offer, SF Form 1442, front and back signed

All solicitation amendments acknowledged

Section 00 10 00 Bid Schedule - all line items priced

Section 00 22 16 proposal submission requirements

Section 00 45 00 Representations and Certifications

Bid Bond and Power of Attorney, fully executed (see FAR provision .228-1). 52 Bid bond must be submitted on a SF24 (current version only); ALL previous versions are invalid. Rejection of bid bond shall be in accordance with RFO FAR 28.101-4, Noncompliance with bid guarantee requirements.

3. Offeror's attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5 Insurance - Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

4. Line items 0003 and 0004 are Option Line Items. See FAR provision 52.217-5 Evaluation of Options, FAR clauses 52.217-8 and 52.217-9. Option lines items are shown in plans and specifications as Options. Line item 0003 is Option 01; Line item 0004 is Option 02.

5. NOTICE TO OFFERORS: APPLICABILITY OF THE REVOLUTIONARY FAR

OVERHAUL AND ACTIVE CLASS DEVIATIONS

5.1. Revolutionary FAR Overhaul (RFO) Applicability and Precedence

For the purposes of this solicitation and any resulting contract, the "Revolutionary FAR Overhaul" (RFO) regulatory framework takes precedence. RFO provisions are defined as those implemented via Class Deviations issued in calendar year 2026 or later (identifiable by DARS Tracking Numbers beginning with 2026-O). Where an RFO provision or RFO Class Deviation has been issued, potential offerors and contractors shall not rely upon the legacy, codified versions of those specific regulations found on standard public acquisition websites (e.g., acquisition.gov) for compliance.

5.1a. RFO Authoritative Locations

To ensure full compliance and accurate offer submission, offerors must access and review the applicable RFO versions at the authoritative locations provided below:

RFO FAR: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide

RFO DFARS: https://www.acq.osd.mil/dpap/dars/dfars_far_overhaul_class_deviations.html

5.1b. Applicability of Active Non-RFO (Legacy) Class Deviations

In addition to the RFO framework, all other active, non-RFO DFARS Class Deviations (issued in calendar year 2025 or earlier) remain in full force and effect, provided they have not been addressed or expressly superseded by an RFO provision or RFO Class Deviation.

Offerors must comply with both the RFO framework and all surviving active non-RFO Class Deviations. A current list of active DFARS Class Deviations can be accessed at:

https://www.acq.osd.mil/dpap/dars/class_deviations.html

W50S8R26RA0050001

https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://www.acq.osd.mil/dpap/dars/dfars_far_overhaul_class_deviations.html https://www.acq.osd.mil/dpap/dars/class_deviations.html

5.1c. Compliance and Technical Issues

Failure to refer and conform to the applicable RFO versions, as well as any surviving non-RFO Class Deviations, may result in a non-compliant offer. For technical issues accessing the provided links, contact the Contracting Officer immediately.

Section 00 21 00 - Instructions

Miscellaneous text in this section has been modified to:

1. SCOPE

1.1. You are invited to submit a proposal in response to our Request for Proposal W50S8R-26-R- A005 for Project

No. PBXP 222050 at 179th Cyberspace Wing, Mansfield, Ohio ANG. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

1.2. This solicitation is UNRESTRICTED.

2. NOTICE OF PRE-PROPOSAL CONFERENCE AND SITE VISIT

2.1. A pre-proposal conference will be conducted on 09 June 2026 at 10:00am EST for the purpose of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at the 179th

Cyberspace Wing (B164-Aircrew Briefing Rm). All attendees will be escorted from front gate, after Security clearance procedures have been completed. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.

2.2. Due to security conditions, all offerors MUST register to attend this conference and site visit.

Submit the following information for all attendees, on Base Access Form (will be provided upon request);

submit request and return form to: gordon.strom.1@us.af.mil .

Visitor's Name (first, middle, last)

Social Security No.

Driver's License No., State Issued and Expiration Date

Date of Birth

Citizenship

2.3. This information must be provided in advance, no later than 1:00pm EST, 2 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

2.4. Attendees cleared for base access will be placed on an Entry Access List (EAL). You will be required to present one the following information upon arrival: (1) Valid Driver's License, (2) Valid State ID, or

(3) Other official US

Government ID (e.g. retired military ID). Any of the above information furnished by you is protected under the Privacy

Act and shall not be released unless permitted by law and/or you have consented to such.

- Attendees shall arrive at base no later than fifteen (15) minutes prior to start of pre-proposal conference.

- Attendees will proceed to front gate, where they will check in with base Security Forces.

- Security Forces will instruct attendees where they will wait to be escorted back to pre-proposal conference building/room.

- Once checked in with front gate and instructed where to wait for escort, attendees shall not leave the waiting area.

2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

2.6. A record of the conference will be made and furnished to all prospective offerors via posting to SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS

3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the A-E or Engineering personnel directly. Doing so will only delay the response to your question.

Subject Line: Reference No. W50S8R-26-R-A005

Submit to Email: gordon.strom.1@us.af.mil

INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING

INFORMATION:

Date of Proposal Inquiry:

From: ______________________________

Company Name: ___________________________

Phone Number: ____________________________

Email address: _____________________________

Proposal Inquiry: Be specific as to part of solicitation you are questioning (i.e. specification section number, drawing number, etc.).

(Word doc format of the above shall be submitted,, in order to facilitate efficient posting of responses to requests for information.)

3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.

3.3. The Contracting Officer reserves the right to address questions received after the fifth business day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth business day prior to closing and will be posted not later than two business days prior to closing. OFFERORS ARE STRONGLY

ENCOURAGED TO SUBMIT

QUESTIONS EARLY IN THIS PROCESS.

3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to www.sam.gov.

3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.

3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the www.sam.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies.

3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to: www.

sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page. (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)

4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS

4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at www.sam.gov.

4.2. Offerors are strongly cautioned to check this site frequently and to "refresh" their web page to ensure they have the lasted information.

5. ELECTRONIC PROPOSAL

5.1. Offerors shall submit their proposals electronically, as described below. The offeror's proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.

5.2. Offerors shall submit proposals in response to this solicitation electronically via the Solicitation module of the

Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil. NO OTHER

TRANSMISSION

METHODS (E-MAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE

ACCEPTED.

5.3. The Posting and Offer guide can be accessed electronically at https://pieetraining.eb.mil/wbt /sol

/Posting_Offer.pdf. A video demonstration can be found at https://pieetraining.eb.mil/wbt/sol /Posting_Offer.html.

Additional PIEE training can be found at https://pieetraining.eb.mil/wbt/.

5.3.1. Do NOT send proposals to e-mail addresses.

5.3.2. FILE DESCRIPTION: Include a "File Description" for each file you upload. Files shall be uploaded in PDF format.

5.3.3. RECEIPT OF SUBMISSIONS: For purposes of establishing whether a proposal submission is considered late, the Government considers the date/time stamp on the e-mail notification sent by the PIEE website to the Contract

Specialist and Contracting Officer, NOT the date/time the documents are uploaded to the website, as the time of submission. Do not assume that the electronic upload is instantaneous. File size, network connection, connection type, and number of files are factors in the total upload/download time of files. It can take several minutes, or even hours in some cases, for all files to upload.

5.3.4. The Government will not be responsible for proposal submissions delivered to any location or by any method other that stated above. Offerors are responsible for submitting proposals in sufficient time to be received by the

Government in accordance with the instructions provided.

6. WAGE DETERMINATION

6.1. The Construction Wage Rate Requirements, formerly known as Davis Bacon Wage Rates, are applicable to this project. Current prevailing wage determination at time of issuance of solicitation is included in section 00 73 00.

In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of RFO FAR 22.403(c)(2(ii) will apply.

6.2. Applicable wage rates can be found at www.SAM.gov.

7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.

8. REMOVAL OF SECTIONS AT TIME OF AWARD

Section's 00 21 00, 00 21 16, 00 22 16 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.

9. DISPOSITION OF UNSUCCESSFUL PROPOSALS

In compliance with RFO FAR 4.309, the Government will retain one copy of all unsuccessful proposals. The

Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.

10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES

It has been determined that all reasonable amounts of Water and Electric, where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services). See Section 01 00 00 of solicitation for additional information related.

11. BID BONDS

A Bid bond is required with submission of the proposal. The bid bond must be on a SF24 form.

Rejection of a bid bond shall be in accordance with RFO FAR 28.101-4, Noncompliance with bid guarantee requirements.

12. EXCEPTIONS

If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00 21 00 through 01 00

00) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The

Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.

13. CLAUSES

13.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

13.2. Clauses and provisions in this document may not appear in consecutive order.

14. BRAND NAME REQUIREMENTS

Specification Section 28 10 05, Electronic Security Systems (ESS). All equipment, materials, and labor (to include installation) are Sole Source Specified. Sole Source is: Advantor Systems. See specification section for Advantor contact data and other pertinent information. Advantor Point of Contact information is:

- Advantor representative: Jonathan Lopez/Market Manager

- email: jonathan.lopez@advantor.com

- phone: 689-323-0544

End of Section 00 21 00

The following clauses were modified:

252.204-7025 Notice of Cybersecurity Maturity Model Certification Level Requirements. Nov 2025 hereby reads as follows:

***REMOVED***

Section 00 72 00 - General Conditions

The following clauses were modified:

252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirements. Nov 2025 hereby reads as follows:

***REMOVED***

IDCode: J
Page: 1
Pages: 15
AmendNo: 0001
EffDate: 28 MAY 2026
ReqNo:
ProjNo: PBXP 222050
IssCode: W50S8R
AdmCode:
IssuedBy: W7NU USPFO ACTIVITY OHANG 179

KO FOR OHANG DO NOT DELETE, 1947 HARRINGTON MEMORIAL RD

MANSFIELD, OH 44903-8049

UNITED STATES

GORDON STROM, EMAIL: GORDON.STROM.1@US.AF.MIL TELEPHONE: 696-6390

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W50S8R26RA005
SolDate: 15 MAY 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: This amendment is being issued, to incorporate B3 final specifications and drawings, revise pre-proposal site visit date, revise proposal closing date, and eliminate CMMC level certification requirements for access to specifications and drawings (applicable provision and clause is removed, as well as stipulation in Section 00 21 00). All other information remains unchanged.
ContNameTitle:
CoNameTitle: GORDON STROM
ContDate:
CODate: 28 MAY 2026