ATTACHMENT 04_B403 Cyber_Specificatioins (Div 26-33)_B3.pdf
PDF 9 MB Posted
- Attached to
- PBXP 222050 - B403 CYBER REPAIR
- Solicitation number
- W50S8R26RA005
About this file
Summary: Attachment 04_B403 Cyber_Specifications (Div 26-33)_B3.pdf
This document comprises the electrical and utility specifications for Building 403 Cyber Repair at Mansfield Lahm ANG Base, Ohio (Project No. PBXP222050), prepared by Jacobs Government Services Company in May 2026. The specifications cover Divisions 26–33 (Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities) and are designed in accordance with the 2024 International Building Code (IBC) as modified by UFC 1-200-01. The project operates under Seismic Design Category B with specific requirements for electrical component protection, including seismic supports for equipment such as battery systems, generators, transformers, UPS systems, and distribution systems with an Importance Factor (Ip) of 1.0, and standby power and emergency lighting systems with Ip of 1.5. Contractor-designed seismic supports and attachments require stamped design calculations and drawings from a registered professional engineer, with materials conforming to ASTM standards (A36, A572, A992 structural steel; A500 tubes; A53 pipes; A307 and A563 fasteners; and AWS D1.1 welding standards).
Electrical systems include a 750 kVA, 12.4 kV Delta to 480Y/277V grounded wye pad-mounted, liquid-filled transformer with less-flammable bio-based insulating liquid, high-voltage dead-front compartment with load-break connectors, six surge arresters, and oil-immersed bayonet fuses rated for 50,000 rms amperes symmetrical interrupting capacity. Power system studies must comply with IEEE 1584 (arc-flash hazard), IEEE 3002.2 (load-flow), and IEEE 3002.3 (short-circuit), with scope extending from the 12.47 kV primary through system buses where fault current availability is 10,000 amperes or less (symmetrical). A registered professional engineer with minimum three years' power system experience must serve as System Analyzer, and a certified independent testing organization (NETA Level III or NICET certified with five years' experience) must perform acceptance testing. Submittals requiring government approval include shop drawings for transformers, panelboards, cable trays, and seismic supports; product data for equipment; design calculations and arc-flash labels; and test reports for grounding systems, transformers, and medium-voltage cables. Interior distribution systems require copper conductors (stranded for No. 8 AWG and larger), rigid galvanized steel or PVC conduit, cable trays with hot-dip galvanized steel construction and maximum 2-by-4-inch mesh spacing, and 120/208-volt, 600-ampere three-phase busway with 65 kAIC short-circuit rating. All electrical materials and equipment must meet UL standards and NFPA 70, have been in satisfactory use for two years prior to bid opening, and not be manufactured more than three years before site delivery; alternative products with documented 6,000-hour field operation records are acceptable.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T Y P E B - 3 F I N A L
Repair B403 for Cyber Contract No. PBXP222050
Specifications (Divisions 26-33)
Prepared for
179th Civil Engineering Squadron
Ohio Air National Guard
Mansfield Lahm ANG Base, OH
May 2026
Jacobs Government Services Company
2600 Michelson Drive, Suite 500
Irvine, CA 92612
REPAIR B403 FOR CYBER FA877006_B403
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 1: 02/23 WORK RESTRICTIONS
01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 08/23 PROJECT SCHEDULE
01 32 52 04/26 SPECIAL SECURITY (24 NOV 2025)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES
01 35 26 11/20, CHG 4: 08/23 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23 QUALITY CONTROL
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 91 00.15 05/23, CHG 2: 11/23 BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.13 10 08/18 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 50 13 08/24 MISCELLANEOUS METAL FABRICATIONS
05 51 33 08/24 METAL LADDERS
05 52 00 08/23 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1
07 19 00 08/23 WATER REPELLENTS
07 21 13 08/23 BOARD AND BLOCK INSULATION
07 21 16 08/23 MINERAL FIBER BLANKET INSULATION
07 21 23 08/23 LOOSE FILL THERMAL INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 08/23 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 13 73 02/11 SLIDING DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 08/24 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/24 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 11/24 RESILIENT FLOORING
09 68 00 11/24 CARPETING
09 69 13 11/24 RIGID GRID ACCESS FLOORING
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 39 08/20 FOLDING PANEL PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 08/24 LOCKERS
DIVISION 11 - EQUIPMENT
11 31 13 08/17, CHG 2: 11/24 ELECTRIC KITCHEN EQUIPMENT
DIVISION 12 - FURNISHINGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGE
12 48 13 08/23 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION
12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE
DIVISION 13 - SPECIAL CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 2
13 49 20.00 10 10/07 RF SHIELDING
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 48.19 02/25 SEISMIC BRACING FOR MECHANICAL SYSTEMS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 08/24 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 08/24 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 08/24 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 09 53.00 20 02/10, CHG 3: 08/24 SPACE TEMPERATURE CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 02/25 HVAC AIR DISTRIBUTION
23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.21 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE & LIFE SAFETY
25 05 11.23 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS BUILDING CONTROL SYSTEM
25 05 11.28 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS ELECTRONIC SECURITY
SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
PROJECT TABLE OF CONTENTS Page 3
BY-PASS/ISOLATION SWITCH
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 08/23 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/24 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 20 05/22 BASE COURSE FOR RIGID PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 02/26 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
REPAIR B403 FOR CYBER
MANSFIELD LAHM ANGB, OH
OHIO AIR NATIONAL GUARD
PROJECT NO. PBXP222050
CODES AND STANDARDS REFERENCED HEREIN
THIS PROJECT IS DESIGNED IN ACCORDANCE WITH THE 2024 INTERNATIONAL BUILDING
CODE (IBC) AS MODIFIED BY UFC 1-200-01, 17 DECEMBER 2024.
THE UNITED FACILITIES GUIDE SPECIFICATIONS (UFGS) ARE UPDATED REGULARLY. THE
VERSION OR EDITION OF CODES AND STANDARDS REFERENCED HEREIN MAY DIFFER FROM
THOSE SPECIFIED IN CHAPTER 35 OF THE IBC. IN THE EVENT OF DISCREPENCIES
REGARDING VERSION OR EDITION OF CODES AND STANDARDS, THE IBC WILL TAKE
PRECEDENCE.
SECTION 26 05 48
SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
11/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B18.21.1 (2009; R 2016) Washers: Helical Spring-Lock, Tooth Lock, and Plain Washers (Inch Series)
ASME B18.22M (1981; R 2017) Metric Plain Washers
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2025) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A153/A153M (2023) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A307 (2021) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A500/A500M (2023) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A563 (2021; E 2022a) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A572/A572M (2021; E 2021) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium
SECTION 26 05 48 Page 1
Structural Steel
ASTM A603 (2019) Standard Specification for Zinc-Coated Steel Structural Wire Rope
ASTM A992/A992M (2022) Standard Specification for Structural Steel Shapes
ASTM B695 (2021) Standard Specification for Coatings of Zinc Mechanically Deposited on Iron and Steel
ASTM E580/E580M (2024) Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions
ASTM F436 (2011) Hardened Steel Washers
ASTM F959/F959M (2017a; R 2023) Standard Specification for Compressible-Washer-Type Direct Tension Indicators for Use with Structural Fasteners, Inch and Metric Series
ASTM F1554 (2020) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength
ASTM F3125/F3125M (2019) Standard Specification for High Strength Structural Bolts and Assemblies, Steel and Alloy Steel, Heat Treated, Inch Dimensions 120 ksi and 150 ksi Minimum Tensile Strength, and Metric Dimensions 830 MPa and 1040 MPa Minimum Tensile Strength
METAL FRAMING MANUFACTURERS ASSOCIATION (MFMA)
MFMA-4 (2004) Metal Framing Standards Publication
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-810 (2022; Rev H; Change 1) Environmental Engineering Considerations and Laboratory Tests
UFC 3-301-01 (2023; with Change 2, 2024) Structural Engineering
UL SOLUTIONS (UL)
UL 1598 (2021; Reprint Jan 2024) UL Standard for Safety Luminaires
VIBRATION ISOLATION AND SEISMIC CONTROL MANUFACTURERS ASSOCIATION
(VISCMA)
VISCMA 413 (2014) Installing Seismic Restraints for Electrical Equipment
SECTION 26 05 48 Page 2
1.2 SYSTEM DESCRIPTION
1.2.1 General Requirements
Provide seismic supports and attachments as indicated and in accordance with UFC 3-301-01 and ASCE 7-16 .
Components, supports, and attachments must comply with following structural design criteria:
Risk Category: II .
Seismic Design Category: B.
Seismic Design Spectral Response Acceleration Parameter at Short Period (SDS): 0.12g.
Seismic Design Spectral Response Acceleration Parameter at period of 1 second (SD1): 0.084g.
Apply the seismic requirements described in this section and on the drawings to the electrical components listed in paragraph ELECTRICAL
COMPONENTS.
Electrical components and their supports must be attached or anchored to structure.
1.2.2 Electrical Components
Provide seismic supports and attachments for the following electrical components in accordance with the requirements of this specification:
Components with Importance Factor (Ip) = 1.0:
Battery Systems Control Panels Generators Light Fixtures Motors Storage Racks Transformers Uninterruptible Power Supply Systems Distribution Systems Conduit, Cable Tray, Busway, and Raceway Utility and Service Lines Automatic Transfer Switches Load Bank
Components with Importance Factor (Ip) = 1.5 Standby power systems Fire detection and suppression systems Emergency exit lighting
1.2.3 Contractor Designed Supports and Attachments
Provide seismic supports and attachments, and isolation and energy dissipation systems for electrical components.
Contractor must retain services of a Registered Professional Engineer to
SECTION 26 05 48 Page 3 design supports and attachments, and isolation and energy dissipation systems for electrical components. Supports and attachments, and isolation and energy dissipation systems that induce torsion in structural members are not permitted.
Submit copies of the Design Calculations and Design Drawings .
Calculations and Drawings must be stamped and signed by Contractor's Registered Professional Engineer.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Equipment Requirements ; G
Lighting Fixtures ; G
SD-03 Product Data
Supports and Attachments ; G
Equipment Requirements ; G
Lighting Fixtures ; G
Flexible Fittings ; G
Anchors ; G
Isolation And Energy Dissipation Systems ; G
SD-05 Design Data
Design Calculations ; G
Design Drawings ; G
SD-06 Test Reports
Anchors ; G
PART 2 PRODUCTS
2.1 EQUIPMENT REQUIREMENTS
Equipment must be rugged enough to survive design seismic event.
Equipment components designated as Designated Seismic Systems or MC-1 (Mission Critical Level 1) must remain operational as required in paragraph SPECIAL TESTING FOR SEISMIC-RESISTING EQUIPMENT.
Submit detail drawings of supports and attachments, and isolation and energy dissipation systems along with calculations, catalog cuts, SECTION 26 05 48 Page 4 templates, and erection and installation details, as appropriate, for the items listed in paragraph ELECTRICAL COMPONENTS. Indicate thickness, type, grade, class of metal, and dimensions; and show construction details, reinforcement, anchorage, and installation with relation to the building construction.
Submit calculations and drawings that are stamped and signed by Contractor's registered professional engineer. Design must be based on actual equipment and system layout. Design must include calculated loads and capacity of materials utilized for the connection of the equipment or system to the structure. Analysis must detail anchoring methods. Include drawing for Designated Seismic System Equipment indicating the equipment location in the facility to be used for the installation. Equipment must be rigidly or flexibly mounted as indicated. Roof mounted equipment both vibration isolated and nonisolated, must have support members designed and anchored to building structure.
2.1.1 Rigidly (Base and Suspended) Mounted Equipment
The following specific items of equipment must be constructed and assembled to withstand the seismic forces specified in UFC 3-301-01 .
Entirely locate each item of rigid electrical equipment and rigidly attach on one side only of a building expansion joint. Provide items such as electrical conduit, which cross the building expansion joint with flexible joints that are capable of accommodating displacements equal to the full width of the joint in each orthogonal direction.
Engine-Generators Transformers Free Standing Electric Motors Automatic Transfer Switches
Equipment furnished under this Contract must be rigidly mounted using cast-in-place anchor bolts or post-installed anchors that are qualified for use in cracked concrete. Cast-in-place anchor bolts must conform to ASTM F1554. For any rigid equipment which is rigidly anchored, provide flexible joints for electrical conduit, cabletray, busway, and raceway, that are capable of accommodating displacements equal to the full width of the joint in both orthogonal directions. Designated Seismic Systems (DSS) for RC IV buildings assigned to Seismic Design Category (SDC) C, D, E, or F and Risk Category IV components needed for continued operation after an earthquake must have two nuts provided on each bolt.
2.2 LIGHTING FIXTURES
Provide lighting fixtures and supports and attachments conforming to
UL 1598 .
2.3 SUPPORTS AND ATTACHMENTS
Material used for members listed in this section and on the drawings, must conform with the following:
a. Plates, rods, and rolled shapes, ASTM A36/A36M, ASTM A572/A572M Grade 50, or ASTM A992/A992M .
b. Wire rope, ASTM A603 pre-stretched, with Class C weight zinc-coated wires throughout rope. Connect rope at ends using ferrule or saddle-type wire rope clamp systems. Ferrule clamps must be qualified by testing for use in seismic applications per VISCMA 413 .
SECTION 26 05 48 Page 5
Saddle-type clamps must be used with minimum of two clamps at each end of wire rope.
c. Tubes, ASTM A500/A500M , Grade B.
d. Pipes, ASTM A53/A53M, Grade B.
e. Angles, ASTM A36/A36M.
f. Channels (Struts) with in-turned lips and associated hardware for fastening to channels at discrete points conforming to MFMA-4.
g. Fasteners:
(1) High-strength bolts, ASTM F3125/F3125M , Grade A325, heavy hex.
(2) Nuts, ASTM A563. Use heavy hex nuts for high strength bolts and anchor bolts.
(3) Washers, ASME B18.22M and ASME B18.21.1 , except use ASTM F436 washers for high strength bolts.
(4) Galvanized coating, ASTM A153/A153M .
(5) Direct Tension Indicator Washers, ASTM F959/F959M . Provide ASTM B695, Class 55, Type 1 galvanizing. Submit product data for direct tension indicator washers.
(6) Standard bolts, ASTM A307.
h. Anchor bolts:
(1) Cast in anchors: Refer to Section 05 12 00 STRUCTURAL STEEL for requirements.
(2) Post-installed anchors: Refer to Section 05 05 20 POST-INSTALLED CONCRETE AND MASONRY ANCHORS for requirements.
i. Welding: Refer to Section 05 12 00 STRUCTURAL STEEL for requirements.
2.4 FLEXIBLE FITTINGS
Provide flexible fittings to allow conduit, cabletray, busway, and raceway systems to accommodate seismic movement between equipment and conduit, cabletray, busway, and raceway systems and supporting structure. Use specification grade steel fittings conforming to Section 26 20 00 INTERIOR DISTRIBUTION SYSTEMMIL-STD-810 . Provide suitable watertight expansion fittings that maintain electrical continuity by bonding jumper or other means. Flexible fittings must accommodate minimum of 4 inches seismic movement in each orthogonal directions.
PART 3 EXECUTION
3.1 SUPPORTS AND ATTACHMENTS
Provide supports and attachments with continuous load path to distribute electrical component seismic loads to structure.
Provide supports and attachments for electrical components that conform to
SECTION 26 05 48 Page 6 the arrangements shown to UFC 3-301-01 requirements. Install vertical diagonal braces at a 45-degree slope. Where interference is present, the slope may be minimum of 30 degrees or a maximum of 60 degrees per
VISCMA 413 .
Provide bolted and welded connections for supports and attachments in accordance with UFC 3-301-01 .
Provide welding in accordance with AWS D1.1/D1.1M . Grind visible welds smooth in the finished installation.
3.2 BUILDING DRIFT
Do not attach electrical components to two dissimilar structural elements of a building that may respond differentially during an earthquake unless a flexible joint is provided. Electrical components, supports, and attachments must be capable of accommodating building story drifts, deflections, and relative displacements.
3.3 CONDUIT, CABLETRAY, BUSWAY, AND RACEWAY
Provide supports and attachments for conduit, cabletray, busway, and raceway conforming to the requirements of UFC 3-301-01 .
3.4 LIGHTING FIXTURES
Provide lighting fixtures and supports conforming to the following:
3.4.1 Pendant Fixtures
Provide pendant fixtures conforming to the requirements of UFC 3-301-01 .
3.4.2 Ceiling Attached Fixtures
3.4.2.1 Recessed Fixtures
Support recessed individual or continuous-row mounted fixtures by a seismic-resistant suspended ceiling support system built in accordance with ASTM E580/E580M . Provide supports and attachments for the fixtures conforming to the requirements of UFC 3-301-01 . Recessed lighting fixtures not over 56 pounds in weight and not required to be supported separately from the structure, may be supported by and attached directly to the ceiling system runners using screws or bolts, number and size as required by the seismic design. Provide lock or screw attachments for fixture accessories, including diffusers and lenses.
3.4.2.2 Surface-Mounted Fixtures
Attach surface-mounted individual or continuous-row fixtures to a seismic-resistant ceiling support system built in accordance with ASTM E580/E580M Section 09 51 00 ACOUSTICAL CEILINGS. Provide supports and attachments for the fixtures conforming to the requirements of UFC 3-301-01 .
3.4.3 Assembly Mounted on Outlet Box
Design a supporting assembly, that is intended to be mounted on an outlet box, to accommodate mounting features on 4 inch boxes, plaster rings, and fixture studs.
SECTION 26 05 48 Page 7
3.4.4 Wall-Mounted Emergency Light Unit
Design and secure attachments for wall-mounted emergency light units for the worst expected seismic disturbance at the site.
3.5 ANCHORS
3.5.1 General
Submit copies of test results to verify the adequacy of the specific anchor and application, as specified. Ensure housekeeping pads have adequate space to mount equipment and seismic restraint devices allowing adequate edge distance and embedment depth for restraint anchor bolts.
Identify position of reinforcing steel and other embedded items prior to drilling holes for post-installed anchors. Do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength. Fill annular gap with nonshrink grout at equipment anchor bolts where clearance between anchor and equipment support hole exceeds 0.125 inches.
3.5.2 Cast-In-Place Anchors
Use templates to locate cast-in-place bolts accurately and securely in formwork. Provide anchor bolts with an embedded straight length with heavy hex nut and plate washer as to provide required strength and ductility. Anchor bolts that exceed the normal depth of equipment foundation piers or pads must either extend into concrete floor or the foundation or increase depth of the piers or pads to accommodate bolt lengths.
3.5.3 Post-Installed Anchors
Refer to Section 05 05 20 POST-INSTALLED CONCRETE AND MASONRY ANCHORS for requirements.
3.6 EQUIPMENT SUPPORT REQUIREMENTS
3.6.1 Suspended Equipment
Provide supports and attachments for components supported from structural systems. Provide supports and attachments that consist of angles, rods, wire rope, bars, channels (struts) or pipes arranged as shown in bracing submittals and secured at both ends with not less than 1/2 inch bolts.
Provide sufficient supports and attachments to resist seismic forces as specified in UFC 3-301-01 without exceeding capacity of structural components. Provide, for approval, specific force calculations in accordance with UFC 3-301-01 for the project.
Submit details of supports and attachments for acceptance. In lieu of bracing with vertical supports, these items may be supported with hangers inclined at 45 degrees directed up and radially away from equipment and oriented symmetrically in 90-degree intervals on the horizontal plane, bisecting the angles of each corner of the equipment, provided that supporting members are properly sized to support operating weight when hangers are inclined. Where interference is present, the inclined hanger slope may be minimum of 30 degrees or a maximum of 60 degrees per
VISCMA 413 .
SECTION 26 05 48 Page 8
3.6.2 Floor or Pad Mounted Equipment
3.6.2.1 Shear Resistance
Bolt components to floor or pads. Provide bolts to resist seismic forces in accordance with paragraph ANCHORS.
3.6.2.2 Overturning Resistance
Use the ratio of the overturning moment from seismic forces to the resisting moment due to gravity loads to determine if overturning forces need to be considered in the sizing of anchor bolts. Provide calculations to verify the adequacy of the anchor bolts for combined shear and tension. Provide bolts to resist seismic forces in accordance with paragraph ANCHORS.
-- End of Section --
SECTION 26 05 48 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 26 05 48 Page 10
SECTION 26 05 73
POWER SYSTEM STUDIES
08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 1584 (2018; E 2019) Guide for Performing Arc-Flash Hazard Calculations
IEEE 1584.1 (2022) Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study
IEEE 3002.2 (2018) Recommended Practice for Conducting Load-Flow Studies and Analysis of Industrial and Commercial Power Systems
IEEE 3002.3 (2018) Recommended Practice for Conducting Short-Circuit Studies and Analysis of Industrial and Commercial Power Systems
IEEE C2 (2023) National Electrical Safety Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70E (2024) Standard for Electrical Safety in the Workplace
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-560-01 (2017; with Change 3, 2023) Operation and Maintenance: Electrical Safety
1.2 SYSTEM DESCRIPTION
The power system covered by this specification consists of: a power distribution system that includes a 12.47kV-480Y/277V pad-mount transformer that supplies power to Building 403 and the building next door. The study must include the distribution systems for both buildings to ensure that all existing electrical equipment in the building next door fault current ratings that exceed the available fault current while connected to the new pad-mount transformer. The study must also evaluate the worst case fault current scenario for B403, whether it's connected to the utility source or the generator via the automatic transfer switch (ATS). The power system studies must evaluate all electrical distribution equipment provided as part of this project, including the UPS, which will be government provided, government installed (GFGI).
SECTION 26 05 73 Page 1
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Field Examination Plan ; G
Arc Flash Label Formats ; G
SD-06 Test Reports
Field Examination
SD-07 Certificates
System Analyzer ; G
SD-11 Closeout Submittals
Model Files ; G
Load Flow Study ; G
Fault Current Study ; G
System Coordination Study ; G
Arc Flash Hazard Study ; G
1.4 QUALITY ASSURANCE
1.4.1 System Analyzer
The System Analyzer must perform the power system studies. The System Analyzer must be a registered professional electrical engineer with a minimum of 3 years of experience with power system studies. Include a list of three comparable jobs performed by the System Analyzer with specific names and telephone numbers for reference. Include the license number and state of the registered Professional Engineer.
1.4.2 System Verifier
The System Verifier may inspect and record settings, markings, and otherwise document the existing equipment. The System Verifier may also place appropriate hazard labels on equipment. The System Verifier must not make any calibrations or adjustments or place equipment into service.
When working with energized equipment, the system verifier must be a Qualified Person per NFPA 70E or working under the direct supervision of a Qualified Person. The System Verifier may communicate with the system owner to determine if the equipment within the studied system has received maintenance and testing in accordance with NETA MTS or NFPA 70B.
PART 2 PRODUCTS
Not used.
SECTION 26 05 73 Page 2
PART 3 EXECUTION
3.1 FIELD EXAMINATION
For each pre- and post-study inspection, submit a field examination plan identifying which facilities must be examined to complete the required work. Include a complete information verification procedure, where Qualified Personnel will be required, PPE requirements for "live" equipment examinations, and equipment to be used within the limited approach boundary of the equipment.
3.1.1 General
Perform field inspections of the site and equipment before the first study and after the last study to determine the state and settings of the equipment and to verify the final settings agree with the studies.
Perform the post-study inspection(s) after changing settings, after performing acceptance tests, and before placing equipment in service.The post-study inspection may be performed by the testing organization approved in 26 08 00 APPARATUS INSPECTION AND TESTING.
Schedule the field examination by the System Verifier with the Contracting Officer at least 10 business days before conducting examination. Furnish all materials, labor, and equipment necessary to conduct the examination.
Maintain a written record of the all equipment examined, equipment location, equipment ratings, settings, personnel involved, and the date the examination was performed. Submit the written record of each field examination .
3.1.2 Safety
Where examination of the equipment requires energized equipment to be opened, provide a Qualified Person to directly supervising any non-Qualified Person within the hazard area. Use PPE, protective barriers, danger signs and other safety devices to protect and warn personnel in the vicinity of "live" equipment being examined.
3.1.3 Application of Arc Flash Labels
Install arc flash warning labels using Qualified Personnel as necessary after the setting and inspection is complete. For new or modified equipment, install labels before the equipment is energized for the first time after installation/modification or setting changes. Schedule the label placement with the Contracting Officer at least 5 business days before label placement. Furnish all materials, labor, and equipment necessary to place the labels. Maintain a written record of the all equipment that received labels, personnel involved, and the date labels were placed.
3.2 POWER SYSTEM STUDIES
Perform power system studies to demonstrate that the equipment selected and system constructed meet the contract requirements for fault current and interrupt ratings, coordination, protection, and Arc Flash Hazard.
Submit reports of the studies along with protective device equipment submittals. Apply Arc Flash Hazard labels to equipment after the studies are approved. Update and resubmit the studies after any changes to the equipment or systems which may affect the study results, and re-apply Arc
SECTION 26 05 73 Page 3
Flash Hazard labels to equipment after the resubmitted studies are approved. The Government is not responsible for any changes to equipment, device ratings, settings, or additional labor for installation of equipment or devices or labels ordered and/or procured before approval of the study.
3.2.1 Scope of Studies
The scope of the studies must begin at primary side of the 12.47kV-480Y/277V pad-mount transformer and extend down to system buses where fault current availability is 10,000 amperes or less (symmetrical) and at each 600 volts for facility-level distribution buses.
The "source bus" is the source of energy for system being analyzed. This may be the energy feed from a utility, the first bus upstream of the work, generators within the work or upstream of the work, or any other source capable of contributing significant energy into the system being analyzed.
In the systems model for the studies, incorporate all existing and new equipment within the scope of the studies. Incorporate any additional sources or load equipment necessary to accurately model the system's performance.
Where multiple sources of power may be in service in various combinations or where electrical loops are in the system, incorporate into the studies all the modes of operation to evaluate the impact of the modes of operation on the system. The primary modes of operation are listed below.
1. Utility power via the 12.47kV-480Y/277V pad-mount transformer
2. Generator via the ATS.
3.2.2 Determination of Facts
Determine and document the time-current characteristics, features, ratings, ampacities, and nameplate data for each existing protective device, electrical equipment, and feeder cables. Obtain the available fault current from the base electrical engineer. For multiple modes of operation, use the mode with available fault current that produces the greatest incident energies in the arc flash hazard study.
Utilize field-verified data in the power system studies. Document the field-verified data in the report.
3.2.3 Single Line Diagram
Provide a single line diagram showing the electrical system buses, devices, transformation points, and all sources of load current and fault current, including generator and motor contributions. Provide a diagram from the system model. Each bus, device or transformation point must have a unique identifier. Show the location of switches, breakers, and circuit interrupting devices on the diagram together with available fault data, and the device interrupting rating.
The naming of existing components within the system model and single line diagram must match existing installed equipment names. The naming of new
SECTION 26 05 73 Page 4 components within the system model and single line diagram must use unique identifiers and be coordinated with the Government.
3.2.4 Load Flow Study
Perform the load flow study in accordance with IEEE 3002.2 to identify initital steady-state conditions for the fault current study. For each operating scenario, provide load flow results on the diagram or in the report. Show or describe the loading factors and assumptions used in each operating mode.
3.2.5 Fault Current Study
Use the results of the load flow study to perform the fault current study in accordance with IEEE 3002.3 . Provide balanced three-phase fault, bolted line-to-line fault, and single line-to-ground fault current values at each voltage transformation point and at each power distribution bus.
For each location, show in tabular form on the diagram or in the report the maximum and minimum available fault currents of all modes of operation for that location.
Where the available fault current at the source bus is not available, describe how the fault contribution from the source bus was determined and why this method is reasonable for the study.
3.2.6 System Coordination Study
Use the results of the load flow study and fault current study. For normal modes of operation, demonstrate that selectivity has been obtained between the devices within the scope of the project. Demonstrate the equipment, machines, and conductors are protected from damage from overloads and fault conditions. Include a description of the coordination of the protective devices in this project. Provide a written narrative describing which devices may operate in the event of a fault at each bus;
the logic used to arrive at device ratings and settings; situations where system coordination is not achievable due to device limitations;
coordination between upstream and downstream devices; and relay settings.
Provide recommendations to improve or enhance system reliability, and detail where such changes would involve additions or modifications to the contract and cost damages (addition or reduction). Provide composite coordination plots on a log-log scale. Where recommendations are provided to improve or enhance system reliability, provide separate coordination plots on log-log scale showing the system coordination before and after the implementation of the recommendations. Where coordination has been adjusted to lower arc flash values, include a discussion of the change and the impact on the system within the report.
3.2.7 Arc Flash Hazard Study
Perform the arc flash hazard study in accordance with IEEE 1584.1 .
Utilize the data from the fault current study to determine the worst case incident energy per IEEE 1584 , IEEE C2 , and OSHA 29 CFR 1910.269 Appendix E. Use identified modes of operation to determine the worst case arc flash energy. If not included in another study, include a description of the devices and device settings for the operating modes that provided the highest arc flash energy. Where the adjusting the coordination of devices to obtain lower arc flash values, include a discussion of the change and the impact on the system within the report. Where the arc flash energies
SECTION 26 05 73 Page 5 exceed 4 cal/cm 2 provide recommendations to reduce the arc flash energy to
1.2 cal/cm 2.
3.2.8 Study report(s)
a. Include a narrative describing the studies performed; the bases and methods used; and the desired method of coordinated protection of the power system.
b. Include descriptive and technical data for existing devices and new protective devices proposed. Include manufacturers published data, nameplate data, and definition of the fixed or adjustable features of the existing or new protective devices. For existing devices, included statements on the condition of the equipment based upon field inspections and owner's statements and reports.
c. Document utility company data including system voltages, fault MVA, system X/R ratio, time-current characteristic curves, current transformer ratios, and relay device numbers and settings;generator resistance and reactance values, and time constants; and existing power system data including time-current characteristic curves and protective device ratings and settings. Identify all assumptions about the protection devices, equipment, and system where data was not available.
d. For each bus in the system, provide fully coordinated composite time-current characteristics (TCC) curves as required to ensure coordinated power system protection between protective devices and equipment. In a tabular format, provide recommended ratings and settings of all protective devices.
e. Provide an arc flash study report in accordance with IEEE 1584.1 .
f. Provide the calculations performed for the studies, including computer programs utilized. Provide the name of the software package, developer, and version number.
3.2.9 Arc Flash Labels
Provide arc flash warning labels on electrical equipment likely to require examination, servicing, or maintenance while energized. Typical types of equipment include pad-mounted transformers, switchgear, switchboards, panelboards, disconnect switches, industrial control panels, meter socket enclosures, and motor control centers that are in other than dwelling occupancies. The arc flash label naming must match the naming used in the system modeling and the single line diagram.
Comply with the label requirements specified in UFC 3-560-01 . Obtain approval of arc flash label formats before printing.
a. Provide a 3.5 inch x 5 inch to 4 inch x 6 inch thermal transfer type label of high adhesion polyester for each location device analyzed.
The label must remain in place and be legible for at least 5 years in the installed environment.
b. Labels must be machine printed with no field markings. Provide arc flash labels in the following manner. All labels must be based on implemented overcurrent devices and settings.
SECTION 26 05 73 Page 6
1. Provide at least one arc flash label for each 480 volt and 208 volt panelboards.
2. Provide at least one arc flash label for each low voltage (less than 1000 V) switchboard.
3. Where the equipment construction has different hazards levels in different areas, provide a single label representing the worst case hazard for all branch circuits and a separate unique label for the compartment containing the main protective device. On the worst case label, indicate which branch circuit compartments have the worst case hazard.
c. Use the worst case hazard of all operating scenarios unless mitigation procedures are used. If mitigation procedures are used, explain the procedures on the label.
3.3 MODELING
Develop a software model of the electrical system identified in the scope of the studies. Use the latest version of SKM PowerTools(TM). Develop the model with accurate, verified information. Model existing electrical equipment, machines, devices, and conductors directly connected to, altered by, or otherwise affected by the work. This includes, but is not limited to generators, transformers, switchgear, switchboards, panelboards, motor control centers, motors, voltage regulators, tap changers, protective relays, circuit breakers, switches, fuses, conductors, capacitors, reactors, grounding system, and control equipment.
Provide the final model files in their native editable formats for future use by the Government. Include device information for devices not in the software vendor's standard distribution.
SECTION 26 05 73 Page 7
SECTION 26 05 73 Page 8
SECTION 26 08 00
APPARATUS INSPECTION AND TESTING
11/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
1.2 RELATED REQUIREMENTS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM applies to this section with additions and modifications specified herein.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
Acceptance Tests and Inspections ; G
SD-07 Certificates
Qualifications of Organization, and Lead Engineering Technician
Acceptance Test and Inspections Procedure ; G
1.4 QUALITY ASSURANCE
1.4.1 Qualifications
Engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph ACCEPTANCE TESTS AND INSPECTIONS herein. Organization must be independent of the supplier, manufacturer, and installer of the equipment. The organization must be a first tier subcontractor. No work required by this section of the specification may be performed by a second tier subcontractor.
a. Submit name and qualifications of organization. Organization must have been regularly engaged in the testing of electrical materials, devices, installations, and systems for a minimum of 5 years. The organization must have a calibration program, and test instruments
SECTION 26 08 00 Page 1 used must be calibrated in accordance with NETA ATS.
b. Submit name and qualifications of the lead engineering technician performing the required testing services. Include a list of three comparable jobs performed by the technician with specific names and telephone numbers for reference. Testing, inspection, calibration, and adjustments must be performed by an engineering technician, certified by NETA (Level III) or the National Institute for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience inspecting, testing, and calibrating electrical distribution and generation equipment, systems, and devices.
1.4.2 Acceptance Tests and Inspections Reports
Submit certified copies of inspection reports and test reports. Include certification of compliance with specified requirements, identify deficiencies, and recommend corrective action when appropriate. Type and neatly bind test reports to form a part of the final record. Submit test reports documenting the results of each test not more than 10 days after test is completed.
1.4.3 Acceptance Test and Inspections Procedure
Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned testing date. Do not perform testing until after test procedure has been approved.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 ACCEPTANCE TESTS AND INSPECTIONS
Testing organization will perform acceptance tests and inspections. Test methods, procedures, and test values must be performed and evaluated in accordance with NETA ATS, the manufacturer's recommendations, and paragraph FIELD QUALITY CONTROL of each applicable specification section.
Tests identified as optional in NETA ATS are not required unless otherwise specified. Place equipment in service only after completion of required tests and evaluation of the test results have been completed. Supply to the testing organization complete sets of shop drawings, settings of adjustable devices, and other information necessary for an accurate test and inspection of the system prior to the performance of any final testing. Notify Contracting Officer at least 14 days in advance of when tests will be conducted by the testing organization. Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:
a. Section 26 32 15 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES. Functional engine shutdown tests, vibration base-line test, and load bank test will not be performed by the testing organization, but by the start-up engineer.
b. Section 26 12 19 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE
TRANSFORMERS
c. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION. Medium voltage
SECTION 26 08 00 Page 2 cables and grounding systems only.
d. Section 26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION
SWITCH
3.2 SYSTEM ACCEPTANCE
Final acceptance of the system is contingent upon satisfactory completion of acceptance tests and inspections.
3.3 PLACING EQUIPMENT IN SERVICE
A representative of the approved testing organization must be present when equipment tested by the organization is initially energized and placed in service.
SECTION 26 08 00 Page 3
SECTION 26 08 00 Page 4
SECTION 26 12 19
PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS
05/24
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A240/A240M (2024b) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications
ASTM D92 (2012a) Standard Test Method for Flash and Fire Points by Cleveland Open Cup Tester
ASTM D97 (2017b) Standard Test Method for Pour Point of Petroleum Products
ASTM D877/D877M (2019) Standard Test Method for Dielectric Breakdown Voltage of Insulating Liquids Using Disk Electrodes
ASTM D1535 (2014; R 2018) Standard Practice for Specifying Color by the Munsell System
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide https://www.approvalguide.com/
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 386 (2016) Separable Insulated Connector Systems for Power Distribution Systems Rated 2.5 kV through 35 kV
IEEE C2 (2023) National Electrical Safety Code
IEEE C37.47 (2011) Standard for High Voltage Distribution Class Current-Limiting Type Fuses and Fuse Disconnecting Switches
IEEE C57.12.00 (2021) General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.12.28 (2023) Standard for Pad-Mounted Equipment
- Enclosure Integrity
IEEE C57.12.34 (2022) Standard Requirements for
SECTION 26 12 19 Page 1
Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers, 10 MVA and Smaller; High Voltage, 34.5 kV Nominal System Voltage and Below; Low Voltage, 15 kV Nominal System Voltage and Below
IEEE C57.12.80 (2010) Standard Terminology for Power and Distribution Transformers
IEEE C57.12.90 (2021) Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.98 (2011) Guide for Transformer Impulse Tests
IEEE C62.11 (2020) Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits (>1kV)
IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 260 (1996; R 2004) Safety Labels for Pad-Mounted Switchgear and Transformers Sited in Public Areas
NEMA Z535.4 (2023) Product Safety Signs and Labels
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2026; TIA 26-1; ERTA 26-1; TIA 26-2; TIA
26-3; TIA 26-4; TIA 26-5; TIA 26-6; TIA
26-7; ERTA 26-2; ERTA 26-3) National Electrical Code
ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT (OECD)
OECD Test 203 (1992) Fish Acute Toxicity Test
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 712-C-98-075 (1998) Fate, Transport and Transformation Test Guidelines - OPPTS 835.3100- "Aerobic Aquatic Biodegradation"
EPA 821-R-02-012 (2002) Methods for Measuring the Acute Toxicity of Effluents and Receiving Waters to Freshwater and Marine Organisms
SECTION 26 12 19 Page 2
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 431 Energy Efficiency Program for Certain Commercial and Industrial Equipment
UL SOLUTIONS (UL)
UL 467 (2022) UL Standard for Safety Grounding and Bonding Equipment
1.2 RELATED REQUIREMENTS
Section 26 08 00 APPARATUS INSPECTION AND TESTING applies to this section, with the additions and modifications specified herein.
1.3 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in IEEE Stds Dictionary .
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Pad-mounted Transformer Drawings ; G
SD-03 Product Data
Pad-mounted Transformers ; G
SD-06 Test Reports
Acceptance Checks and Tests ; G
SD-07 Certificates
Transformer Efficiencies ; G
SD-09 Manufacturer's Field Reports
Transformer Test Schedule ; G
Pad-mounted Transformer Design Tests ; G
Pad-mounted Transformer Routine and Other Tests ; G
SD-10 Operation and Maintenance Data
Transformer(s) , Data Package 5; G
1.4.1 Reduced Submittal Requirements
Transformers designed and manufactured by…
This is the start of the file's text. The full file is on GovTribe.