This file is a solicitation document for a firm fixed-price commercial construction contract awarded by the Ohio National Guard for Building 403 CYBER Repair at the 179th Cyberspace Wing in Mansfield, Ohio. The project, identified as PBXP222050, requires construction services that meet ICD-705 standards and accommodate current cyberoperations mission requirements in accordance with detailed design specifications and drawings. The contract duration is 540 calendar days from notice to proceed, including final inspection and punch list completion. The estimated project value ranges from $10,000,000 to $20,000,000, with NAICS code 236220 (commercial construction). The solicitation is unrestricted, though a HUBZone price evaluation preference applies under FAR 19.110. Large business offerors must submit a Small Business Subcontracting Plan with their proposal.

Key procedural dates include a pre-proposal conference on May 28, 2026 at 10:00am EST with a required site visit, and a solicitation closing date of June 29, 2026 at 1:00pm EST. All pre-proposal questions must be submitted two business days prior to the conference. Evaluation will be based on Technical Capability, Past Performance, and Price under FAR 15.3 procedures, with award intended without discussions. Critical to proposal submission is that the Specifications and Drawings contain Controlled Unclassified Information (CUI) accessible only through SAM.gov upon request. Offerors must possess CMMC Level 2 - CP3AO certification or higher to access these documents and must comply with all CUI handling requirements under DFARS 252.204-7021. Inquiries should be directed to gordon.strom.1@us.af.mil.

View the file

Other files

File Type Posted
W50S8R26RA005 0005_B403 CYBER Repair (conformed version).pdf PDF
W50S8R26RA005 0005_B403 CYBER Repair.pdf PDF
RFI and Response Document (as of 07 July)_final.pdf PDF
RFI 04_question 6. attach._Geotech Report.pdf PDF
W50S8R26RA005 0004_B403 CYBER Repair (conformed version).pdf PDF
W50S8R26RA005 0004_B403 CYBER Repair.pdf PDF
RFI and Response Document (as of 03 July).pdf PDF
RFI and Response Document (as of 02 July).pdf PDF
RFI 03_question 7. response attach. 02.pdf PDF
RFI 03_question 7. response attach. 01.pdf PDF
RFI 02_question 8. response attachment.pdf PDF
W50S8R26RA005 0003_B403 CYBER Repair.pdf PDF
W50S8R26RA005 0003_B403 CYBER Repair (conformed version).pdf PDF
Pre-Proposal Conference-slides.pptx PPTX presentation
Pre-Proposal sign-in sheet.pdf PDF
W50S8R26RA005 0002_B403 CYBER Repair.pdf PDF
RFI and Response Document (as of 09 June).pdf PDF
EXHIBIT A rev01.pdf PDF
Pre-Proposal Conference minutes_B403 CYBER.pdf PDF
W50S8R26RA005 0002_B403 CYBER Repair (conformed version).pdf PDF
ATTACHMENT 05_B403 Cyber_Drawings (Half size)_B3.pdf PDF
ATTACHMENT 06_B403 Cyber_Drawings (Full size)_B3.pdf PDF
ATTACHMENT 07_B403 Cyber_Interior Design Specs and Drawings_B3.pdf PDF
ATTACHMENT 04_B403 Cyber_Specificatioins (Div 26-33)_B3.pdf PDF
ATTACHMENT 03_B403 Cyber_Specifications (Div 09-25)_B3.pdf PDF
ATTACHMENT 02_B403 Cyber_Specifications (Div 01-08)_B3.pdf PDF
ATTACHMENT 06_B403 Cyber_Drawings (Full size)_B3.pdf PDF
W50S8R26RA005 0001_B403 CYBER Repair (conformed version).pdf PDF
ATTACHMENT 08_IDS Justification and Approval.pdf PDF
ATTACHMENT 05_B403 Cyber_Drawings (Half size)_B3.pdf PDF
ATTACHMENT 01_B403 Cyber_Narrative_B3.pdf PDF
W50S8R26RA005 0001_B403 CYBER Repair.pdf PDF
W50S8R26RA005_B403 CYBER Repair.pdf PDF
EXHIBIT D_Letter of Commitment.docx DOCX document
EXHIBIT C_Reference Questionnaire Package.docx DOCX document
EXHIBIT A.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B403 CYBER REPAIR, SOLICITATION NO.: W50S8R-26-R-A005

EXHIBIT B – SUBCONTRACTOR INFORMATION AND CONSENT FORM

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing the offering contractor’s past performance relevancy and confidence, we request that the following consent form be completed by the major subcontractors/teaming partners identified in the offering contractor’s proposal. The completed consent forms should be submitted to the offering contractor for submission with subcontract past performance volume. Additionally, certain subcontractors will be required to send off questionnaires to their references. The offering contractor will inform you if this is required. Your cooperation will be appreciated.

Your Letterhead

SUBCONTRACTOR/TEAMING PARTNER CONSENT FOR THE RELEASE OF PAST PERFORMANCE INFORMATION TO THE PRIME CONTRACTOR AND REFERENCE INFORMATION (Name of Firm) is currently participating as a (subcontractor/teaming partner) with (prime contractor or name of entity providing proposal) in responding to W50S8R-26-R-A005. We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature)(Title of Individual with authority to sign for and Legally bind the company)
Company Name:Address:
City/State/Zip Code:Date:

Reference List (required): Reference cannot be from the contractor proposing on this solicitation.

1. Contract No. And Title Describe your role (Prime/Sub) and work Performed Reference POC Name Phone Fax Email address:

2. Contract No. And Title Describe your role (Prime/Sub) and work Performed Reference POC Name Phone Fax Email address:

3. Contract No. And Title Describe your role (Prime/Sub) and work Performed Reference POC Name Phone Fax Email address:

File details come from the government source that posted it. Updated .