This is a Type B-3 Design Basis of Design document for the Repair B403 for Cyber project at Mansfield Air National Guard Base in Ohio, prepared by Jacobs Engineering for the Ohio Air National Guard (Project Number PBXP222050).

The project involves renovating an existing facility not to exceed 6,200 square feet to establish a data processing facility supporting the 179th Cyberspace Wing's new Cyber Warfare mission. The facility will accommodate 10 full-time and 15 Unit Training Assembly (UTA) occupants with 24-hour operations. Key activities include administrative functions, data processing, and data analysis, with the facility designed to include secure administration and training spaces, a conference room, a server room, and supporting infrastructure with backup power. The design must comply with Department of Defense Unified Facilities Criteria (UFC 1-200-01 and 1-200-02), Air National Guard design standards, antiterrorism requirements, and is registered for Green Business Certification Inc sustainability certification under Guiding Principles. The project includes extensive demolition of existing structures, mechanical systems, fire protection systems, electrical equipment, and communications infrastructure; civil work including new sidewalks, equipment pads, and utility modifications; and compliance with EISA 438 stormwater management requirements. The facility was originally constructed in 2021 with only shell and utility stub-ins, and this renovation will complete the interior buildout with all necessary systems including HVAC, electrical, fire protection, plumbing, and communications infrastructure designed to current codes and standards effective February 26, 2025.

View the file

Other files

File Type Posted
W50S8R26RA005 0005_B403 CYBER Repair (conformed version).pdf PDF
W50S8R26RA005 0005_B403 CYBER Repair.pdf PDF
W50S8R26RA005 0004_B403 CYBER Repair (conformed version).pdf PDF
W50S8R26RA005 0004_B403 CYBER Repair.pdf PDF
RFI and Response Document (as of 07 July)_final.pdf PDF
RFI 04_question 6. attach._Geotech Report.pdf PDF
RFI and Response Document (as of 03 July).pdf PDF
RFI 03_question 7. response attach. 02.pdf PDF
RFI 03_question 7. response attach. 01.pdf PDF
RFI 02_question 8. response attachment.pdf PDF
RFI and Response Document (as of 02 July).pdf PDF
W50S8R26RA005 0003_B403 CYBER Repair (conformed version).pdf PDF
W50S8R26RA005 0003_B403 CYBER Repair.pdf PDF
W50S8R26RA005 0002_B403 CYBER Repair.pdf PDF
RFI and Response Document (as of 09 June).pdf PDF
EXHIBIT A rev01.pdf PDF
Pre-Proposal Conference minutes_B403 CYBER.pdf PDF
W50S8R26RA005 0002_B403 CYBER Repair (conformed version).pdf PDF
Pre-Proposal Conference-slides.pptx PPTX presentation
Pre-Proposal sign-in sheet.pdf PDF
ATTACHMENT 06_B403 Cyber_Drawings (Full size)_B3.pdf PDF
ATTACHMENT 05_B403 Cyber_Drawings (Half size)_B3.pdf PDF
ATTACHMENT 04_B403 Cyber_Specificatioins (Div 26-33)_B3.pdf PDF
ATTACHMENT 03_B403 Cyber_Specifications (Div 09-25)_B3.pdf PDF
ATTACHMENT 02_B403 Cyber_Specifications (Div 01-08)_B3.pdf PDF
ATTACHMENT 06_B403 Cyber_Drawings (Full size)_B3.pdf PDF
W50S8R26RA005 0001_B403 CYBER Repair (conformed version).pdf PDF
ATTACHMENT 08_IDS Justification and Approval.pdf PDF
ATTACHMENT 05_B403 Cyber_Drawings (Half size)_B3.pdf PDF
W50S8R26RA005 0001_B403 CYBER Repair.pdf PDF
ATTACHMENT 07_B403 Cyber_Interior Design Specs and Drawings_B3.pdf PDF
EXHIBIT D_Letter of Commitment.docx DOCX document
EXHIBIT C_Reference Questionnaire Package.docx DOCX document
EXHIBIT A.docx DOCX document
EXHIBIT B.docx DOCX document
W50S8R26RA005_B403 CYBER Repair.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B A - P R O J E C T D E S C R I P T I O N

JACOBS 1

Repair B403 for Cyber Mansfield Air National Guard Base, OH

PREPARED FOR: Ohio Air National Guard

PREPARED BY: Jacobs Engineering

DATE: May 2026

PROJECT NUMBER: FA877006 (Jacobs), PBXP222050 (ANG)

REVISION NO.: Type B-3 Design

Project Description Scope: This project is to construct a data processing facility to meet mission requirements. Facilities will be designed as permanent construction in accordance with Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01 - General Building Requirements, UFC 1-200-02 - High Performance and Sustainable Building Requirements, and other UFC applicable to the mission and building requirements.

This facility shall be compatible with applicable DoD, Air Force, mission-specific, and base design standards. In addition, local materials and construction techniques shall be used, where cost effective.

This project shall comply with DoD antiterrorism (A/T) requirements pursuant to the UFC.

Floor Plans: Jacobs prepared the as-built drawings for existing conditions at B403. The base provided concept sketches showing space requirements in the facility.

Number of Occupants: Per the SOW, the occupancy is 10 Full Time, 15 UTA. Jacobs understands a higher occupancy is desired and will design to fit as many occupants as possible.

Hours of Operations: 24 Hours

Room Info & Special Requirements: The scope of this project is to renovate an existing facility, not to exceed 6,200 square feet, for the new cyber mission. Activities in the facility include administrative, data processing, and data analysis.

Sustainability Goal: This project is registered with the Green Business Certification, Inc (GBCI) and will obtain sustainability certification for Guiding Principles (GP).

T A B B - P R O J E C T S I T E D E S C R I P T I O N

Repair B403 for Cyber Mansfield Air National Guard Base, OH

PREPARED FOR: Ohio Air National Guard

PREPARED BY: Jacobs Engineering

DATE: May 2026

PROJECT NUMBER: FA877006 (Jacobs), PBXP222050 (ANG)

REVISION NO.: Type B-3 Design

Project Site Description Site Description: Access to the installation is by way of Harrington Memorial Road. The proposed site is the existing facility adjacent to the Fuels Systems Maintenance (Building 409) and south of the existing Taxiway Alpha and Runway 5-23.

1. Base Standards: Provided by the Base Civil Engineer.

2. Existing Utilities:

a. Natural Gas Distribution Pipe: 3 inch

b. Water Distribution Mains: 8 inch

c. Sanitary Sewer Pipelines: 6 inch

d. Buried Electrical

e. Buried Communications

3. Existing Topographic Survey: Not included in project; existing grades shown from as-built drawings

4. Existing Soil Borings: Available in Geotechnical Report

5. Traffic, parking, fencing, etc: Area map provided

6. Known Environmental Restrictions: None

Site Plan: Jacobs prepared the existing site plan at B403

Utility Plan: Jacobs prepared the existing utility site plans at B403

Architectural Treatment: The project will comply with base architectural standards and compliment other modern facilities on the base.

D E S I G N N A R R A T I V E

Repair B403 for Cyber Mansfield Air National Guard Base, OH

PREPARED FOR: Ohio Air National Guard

PREPARED BY: Jacobs Engineering

DATE: December 2025

PROJECT NUMBER: FA877006 (Jacobs), PBXP222050 (ANG)

REVISION NO.: Type B-3 Design

1.0 Introduction

The 179th Cyberspace Wing requires data processing and operational space to support initial operating capability of a new Cyber Warfare mission. Building 403 was undergoing a construction project in 2021 to expand the building and provide corrosion control capabilities. The new cyber warfare mission was announced during construction, and the project was descoped to include only the building shell and stub-ins for utilities. This project will modify the existing space in Building 403 to provide secure administration and training spaces, a conference room, and a server room for the new mission. The design will provide supporting infrastructure and backup power.

References to sensitive or secure information are omitted from this document.

2.0 Codes & Standards

Codes and standards in effect on 26 Feb 2025 are the governing codes for this project.

2.1 Air National Guard

ANGETL 24-02 Air National Guard Design Objectives and Procedures

ANGETL 15-01-01 Sustainable Design, Development, and Resource Conservation

ANGETL 24-01-03 Fire Protection Design Guidance

ANGETL 15-01-04 Mechanical Engineering

ANGETL 24-01-05 Electrical and Communications Engineering

ANGETL 24-01-07 Airfield and Vehicle Pavement Design Guidance

2.2 Unified Facilities Criteria

UFC 1-200-01 DoD Building Code

UFC 1-200-02 High Performance and Sustainable Building Requirements

UFC 3-101-01 Architecture

DESIGN NARRATIVE

JACOBS 2

UFC 3-110-03 Roofing

UFC 3-201-01 Civil Engineering

UFC 3-210-10 Low Impact Development

UFC 3-250-04 Standard Practice for Concrete Pavements

UFC 3-301-01 Structural Engineering

UFC 3-400-02 Design Engineering Weather Data

UFC 3-401-01 Mechanical Engineering

UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems

UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems

UFC 3-420-01 Plumbing Systems

UFC 3-501-01 Electrical Engineering

UFC 3-520-01 Interior Electrical Systems

UFC 3-530-01 Interior and Exterior Lighting Systems

UFC 3-575-01 Lightning and Static Electricity Protection Systems

UFC 3-580-01 Information and Communications Technology Infrastructure Planning and Design

UFC 3-600-01 Fire Protection Engineering for Facilities

UFC 3-740-05 Construction Cost Estimating

UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings

UFC 4-010-05 [Secure Area] Planning, Design, and Construction

UFC 4-010-06 Cybersecurity of Facility-Related Control Systems

UFC 4-021-01 Design and O&M: Mass Notification System

2.3 General Codes & Standards

International Building Code (IBC)

ANSI Z359.18-2017 Safety Requirements for Anchorage Connectors for Active Fall Protection Systems

Architectural Barriers Act (ABA) Standards

2.4 Civil Codes

EISA 438 Stormwater Management for Federal Facilities

2.5 Structural Codes

ASCE 7 Minimum Design Loads for Buildings and Other Structures

ACI 318 Building Code Requirements for Structural Concrete

TMS 402/602 Building Code Requirements and Specifications for Masonry Structures

JACOBS 3

ACI 530 Building Code Requirements for Masonry Structures

AISC 360 Specification for Structural Steel Buildings

2.6 Fire Protection Codes

NFPA 1 Fire Code

NFPA 10 - Standard For Portable Fire Extinguishers

NFPA 13 Standard for the Installation of Sprinkler Systems

NFPA 24 Standard for the installation of Private Fire Service Mains and Appurtenances

NFPA 70 National Electrical Code

NFPA 72 National Fire Alarm and Signaling Code

NFPA 80 Standard for Fire Door and Other Opening Protectives

NFPA 90A Installation of Air Conditioning and Ventilating Systems

NFPA 101 Life Safety Code

NFPA 220 Standard on Types of Building Construction

TSFPEWG G 3-600-01.01-18

NFPA 241 Safeguards During Construction

NFPA 291 Recommended Practice for Fire Flow Testing and Marking Hydrants

2.7 Mechanical and Plumbing Codes

International Mechanical Code

International Plumbing Code

ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality

ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings

NFPA 54 National Fuel Gas Code

NFPA 90A Installation of Air Conditioning and Ventilating Systems

2.8 Electrical Codes

NFPA 70 National Electrical Code (NEC)

Illuminating Engineering Society (IES) Recommended Practices

ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings

NFPA 780 Standard for the Installation of Lightning Protection Systems

NFPA 101 Life Safety Code

2.9 Communication Codes

TIA-568.1-D Generic Telecommunications Cabling for Customer Premises

JACOBS 4

TIA-568.3-D Standard Optical Fiber Cabling and Components

TIA-568.C.2 Balanced Twisted-Pair Telecommunications Cabling and Components Standards

3.0 Demolition

3.1 Civil Demolition

Site demolition will be limited to removal of segments of concrete sidewalks and aprons, fencing portions of asphalt pavement and gravel surfacing supporting utility installation and access to building entrances as required.

3.2 Structural Demolition

Structural demolition will be limited to the extent possible. Selective demolition of portions of walls and slabs to accommodate openings and penetrations will be required.

3.3 Architecture & Interiors Demolition

The demolition scope outlined here focuses on modifications to the exterior and interior of a building.

These modifications include changes to existing openings, and removal of specific elements like doors, windows, and walls.

Exterior: There are numerous existing openings within the building perimeter that will be removed and infilled with concrete masonry units (CMU) and vertical metal panels to match the look of the existing facade. Those openings consist of; two existing overhead sectional doors, one existing roll-up door, three single size doors, one double size door, two existing aluminum window systems and numerous metal louvers. At the main entry of the building the existing double door will be removed and partially infilled in preparation for a new sound rated single size hollow metal door and frame.

Interior: Portions of existing CMU walls will be removed to accommodate new door and framed openings. There are two existing overhead sectional doors that will be removed and infilled. Around where the original existing restroom was planned to go there are two existing partial-height CMU walls that will be removed to accommodate new restroom construction.

These modifications aim to enhance the building's functionality, security, and aesthetic appeal while ensuring compliance with relevant building codes and standards.

3.4 Fire Protection Demolition

The existing fire alarm system will be removed and replaced.

The existing partial sprinkler system will be removed. The existing fire riser location will be cut and filled, and a new fire riser connection will be piped to a new location.

3.5 Mechanical Demolition

Most of the mechanical equipment in the building was demolished during the previous project. The remaining HVAC equipment serving B403 including a makeup air unit on the roof and a gas-fired unit heater will be demolished.

JACOBS 5

The sanitary service lines in the slab and overhead vent service shall remain for the new plumbing fixture connection. Existing natural gas will be demolished back to the main entry service and capped.

New domestic water service to the fixtures is anticipated.

3.6 Electrical Demolition

The existing 500kVA utility transformer located next to building 500 will be demolished. This transformer supplies power to both Building 500 and Building 403. The new Building 403 loads in addition to the existing Building 500 loads have exceeded 500kVA.

The existing underground conduits and conductors are too small to reuse for the larger building service that is required. The underground secondary conduits will be abandoned in place or demolished where required for site work or equipment installation. The secondary conductors between the existing transformer and the Building 403 electrical room will be demolished. The primary feeder to the existing 500kVA transformer will be reconnected to the new pad-mount transformer in the same location. The Building 500 secondary conductors will be re-terminated to the new pad-mount transformer.

The existing electrical equipment located in the Building 403 electrical room will be demolished. This equipment includes a service-entrance panel, meter, current transformer (CT) cabinet, dry-type transformer, and a panelboard. The existing electrical equipment is not sized adequately for the new, larger building loads. Existing electrical equipment located within the building footprint will be demolished including, but not limited to, lighting, controls, disconnects, receptacles, junction boxes, conduits, and conductors.

3.7 Communications Demolition

The existing wall-field of plywood and wall-mounted equipment will be removed. The existing communications cabling will be relocated to service the new Telecommunications Entrance Facility (TEF). The 24 strands of Single-Mode fiber will be removed to the closest maintenance hole and marked for future use. (2) 4-inch conduits service the building from an adjacent maintenance hole south of the building and will also be removed. All communications equipment will be removed from the building.

4.0 Civil Design

4.1 Site Location and Improvements

The site is on the western edge of the Base off the flightline with Building 500 to the south and Building

409 to the north and Building 408 to the southeast. It is accessed off Mustang Road to the east, and most parking is aggregate surfacing southeast of the building. A concrete apron is in front of the roll up doors and a concrete sidewalk wraps the building to the north around to the mechanical yard on the western side of the building. No topographic survey was conducted for this project.

No new parking will be installed in this project. Portions of sidewalk will be demolished for the new ramps at the exterior doors (north, west, and east sides of the building) and to facilitate the new mechanical and electrical equipment. New segments of sidewalk will be installed to provide continuous access around the building. The sidewalks will tie into existing grades and meet ABA slope requirements.

The existing asphalt pavement will be sawcut to provide space for the mechanical equipment yard north of the main entrance. Minor pavement patching is required to connect asphalt pavement to the concrete sidewalks along the northeastern side of the building.

JACOBS 6

The folding antennae tower will be installed on top of the existing flight line pavement to the southeast of existing Building 500. The perimeter fence will be rerouted around it and tied back into the existing fence.

West of the building towards the flightline is sod as well as to the southwest of the building towards

Building 500. A below grade stormwater infiltration chamber was installed during construction of the previous project. It will remain in place. Landscaping will only be required as incidental to construction and to restore areas to match existing. Aggregate surfacing will be restored where new trenching is required and to restore areas around equipment pads.

New bollards will be provided in the aggregate surfacing to protect the existing hydrant to the south of the building.

4.2 Utilities

The building currently has utility stub outs for domestic water, fire water, sanitary sewer, gas, and power installed into the building. A new electrical service will be provided from a new pad-mount transformer near Building 500 to the electrical room Southeast of the electrical room, two heat pumps will be installed along the building in the sidewalk. Further to the southeast, a new generator, transfer switch, cabinet and meter will be installed on a pad in the new concrete sidewalk. Five condensing units will be installed in the footprint of the former concrete apron near the double door entrance on a concrete pad. A concrete equipment pad and enclosure will house the mechanical equipment to the north of the main entrance. Three condensing units will be placed adjacent to the building on concrete equipment pads at the rear of the building near the southwest corner. New communication lines will be supplied to the building. Communication lines will also be fed to the antennae tower. Advantor is the base standard, and a new conduit to the facility from a nearby vault east of the building will be required.

4.3 EISA 438

Per the Environmental Protection Agency (EPA), Federal projects under Section 438 of the Energy Independence and Security Act (EISA); any development or redevelopment project involving a Federal facility with a footprint that exceeds 5,000 square feet shall use site planning, design, construction, and maintenance strategies for the property to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow. As a result, the project is designed to conform to the EISA 438 requirements.

However, EISA requirements were met when the building was first constructed and the infiltration gallery collecting roof run off was built to the west of the building. As a result, no further improvements were required with this building’s renovation.

4.4 Accessibility

Exterior doors will be made accessible as required for ABA compliance. Ramps will be installed at the main entrance and at any emergency egress door where raised flooring occurs. If ramps block circulation to other doors along the sidewalk small panels of concrete sidewalk will be installed to provide circulation. The door and ramp at the Telecommunications Entrance Facility (TEF) is designed to meet ABA compliance however it is not intended for this area to be an accessible form of egress. The ramp and door are used for moving of servers and other equipment only.

Type B-3 - Basis of Design
Table of Contents
Type B-3 Certification
Type B-3 Checklist
Part I - Design Intent
Cover Sheet
Tab A - Project Description
Tab B - Project Site Description
Tab C - ANG Design Objectives
Tab D - ANG Design Policy
Tab E - DD1391
Part II - Design Narrative
1.0 Introduction
2.0 Codes & Standards
3.0 Demolition
4.0 Civil Design
5.0 Structural Design
6.0 Architectural Design
7.0 Interior Design
8.0 Fire Protection Design
9.0 Mechanical Design
10.0 Plumbing Design
11.0 Electrical Design
12.0 Communications Design
13.0 Antiterrorism
14.0 Sustainability
15.0 Cybersecurity
Appendix A - Cybersecurity CCI