FANG BLDG 2600 2601 ANN FA 7-2019.pdf

PDF 253 KB Posted

Attached to
Inspection of Fire Alarm Panels, Main Base
Solicitation number
W50S6T24QA011
Issued by

About this file

This document contains a request for quote for fire alarm panel inspection and maintenance services. The 144th Air National Guard is seeking a firm fixed price contract to inspect and correct any deficiencies in the fire protection systems of nineteen buildings at its base in Fresno, California. Interested offerors must be registered in the System for Award Management and have a Commercial and Government Entity code. Quotes are due by email to the specified Contracting inbox by the stated due date and time. A site visit will be held on January 3, 2023 at 9:00am for pre-enrolled attendees who have been cleared through the Defense Biometric Identification System. Offerors must provide the list of pre-enrolled attendees five business days prior to the site visit. The Government reserves the right to amend or cancel this solicitation before or after the closing date and has no obligation to reimburse costs in the event of cancellation. Submitted offers will be valid for 30 days.

View the file

Other files

File Type Posted
FANG BLDG 145 ANN FA 7-2019.pdf PDF
FANG BLDG 122 ANN FA 7-2019.pdf PDF
FANG BLDG 130 ANN FA 6-2019.pdf PDF
Performance Work Statement - Inspection Fire Panel Main Base (HAYW231030)-Amd2.pdf PDF
FANG BLDG 135 ANN FA 6-2019.pdf PDF
FANG BLDG 2640 ANN FA 7-2019.pdf PDF
FANG BLDG 2602 ANN FA 7-2019.pdf PDF
Solicitation Amendment W50S6T24QA0110002 SF 30.pdf PDF
FANG BLDG 102 ANN FA 7-2019.pdf PDF
FANG BLDG 121 ANN FA 7-2019.pdf PDF
FANG BLDG 159 ANNUAL FA 6-2019.pdf PDF
FANG BLDG 124 ANN FA 6-2019.pdf PDF
Solicitation Amendment - W50S6T24QA0110002 SF1449.pdf PDF
FANG BLDG 125 ANN FA 6-2019.pdf PDF
FANG BLDG 117 ANN FA 6-2019.pdf PDF
FANG BLDG 126 ANN FA 6-2019.pdf PDF
FANG BLDG 157 ANNUAL FA 6-2019.pdf PDF
FANG Bldg 100 Annual FA 6-2019.pdf PDF
FANG BLDG 155 ANN FA 7-2019.pdf PDF
FANG BLDG 104 ANN FA 7-2019.pdf PDF
FANG BLDG 225 ANN FA 6-2019.pdf PDF
FANG BLDG 194 ANN FA 7-2019.pdf PDF
Solicitation Amendment W50S6T24QA0110001 SF 30.pdf PDF
Base Access-144 SFS DVES FORM- 20230127 (Site Visit).pdf PDF
Wage Determinations SCA - 2015-5609 dated 3Aug2023.pdf PDF
Solicitation - W50S6T24QA011 SF1449 RFQ.pdf PDF
Performance Work Statement - Inspection Fire Panel Main Base.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SimplexGrinnell BE SAFE

INSPECTION AND TESTING FORM

SR Number: 44909832 DATE: July 2, 2019

Task Number: TIME: 9:00AM

SERVICE ORGANIZATION PROPERTY NAME (USER)

Name: SimplexGrinnell Name: F.A.N.G 2600 & 2601

Address: 2788 N. Larkin Ave. Address: 5323 E. McKinley Ave

City, St., Zip: Fresno, CA, 93272 City, St., Zip: Fresno, CA, 93727

Representative: Jesus Salgado Owner Contact: Mike Scott

License No.: 986047 Telephone: 559-454-5137

Telephone: 559-348-0614 Occupied as: Master Chief

MONITORING ENTITY APPROVING AGENCY

Contact: In House Fire Department Contact: N/A

Telephone: 559-454-5145 Telephone: N/A

Monitoring Account Ref. No.: N/A

TYPE TRANSMISSION SERVICE

McCulloh Weekly

Multiplex Monthly

X Digital Quarterly

Reverse Polarity Semiannually

RF X Annually

Other (Specify) Other (Specify)

System Type: ( ) Local; ( ) Auxiliary; (X)Remote Station; ( ) Proprietary; ( ) Emergency Voice / Alarm

Control Unit Manufacturer: Monaco Enterprise Model No.: M2

Circuit Style: B

Number of Circuits: NA

Software Rev.: NA

Last Date System Had Any Service Performed: September 29, 2017

Last Date That Any Software or Configuration Was Revised: 1990

ALARM-INITIATING DEVICES AND CIRCUIT INFORMATION

Quantity of Devices Installed

Circuit Style

Devices Tested

10 B 10 Manual Fire Alarm Boxes (PSSA)

0 0 Ion Detectors (ISD)

0 B 0 Photo Detectors (PSD)

1 B 1 Duct Detectors (DSD)

24 B 24 Heat Detectors (HD)

1 B 1 Water Flow (WF)

(Specify)

(Specify)

(Specify)

Alarm verification feature is Disabled X Enabled .

Rev. D

ALARM NOTIFICATION APPLIANCES AND CIRCUIT INFORMATION

Appliances Installed

Appliances Tested

1 B 1 Bells

4 B 4 Horns with strobes

0 0 Chimes

2 B 2 Strobes

3 B 3 Speakers

0 0 (Specify)

Number of alarm notification appliance circuits: 4

Are circuits monitored for integrity? X Yes No

SUPERVISORY SIGNAL-INITIATING DEVICES AND CIRCUIT INFORMATION

Devices Installed

Devices Tested

0 0 Valve Position Tamper Switch (TS)

0 0 Outside Stem and Yoke (OSY)

0 0 Post Indicator Valve (PIV)

0 0 High / Low Pressure Switch (HLPS)

0 0 Building Temperature

0 0 Site Water Temp

0 0 Site Water Level

0 0 Fire Pump Power

0 0 Fire Pump Running

0 0 Fire Pump Auto Position

0 0 Fire Pump or Fire Controller Trouble

0 0 Fire Pump Low Fuel

0 0 Other: Switch Transfer

0 0 Other: Generator Engine Running

SIGNALING LINE CIRCUIT

Quantity and style of signaling line circuits connected to system (see NFPA, Table 6.6.1):

Quantity Style(s)

SYSTEM POWER SUPPLIES

(a) Primary (Main): Nominal Voltage 120VAC Amps 2.5

Overcurrent Protection: Type Circuit Breaker Amps 20

Location (of Primary Supply Panel): ELECTRICAL ROOM

Disconnecting Means Location: ELECTRICAL PANEL L2 CKT #12

(b) Secondary (Standby):

Back Up Batteries Storage Battery: Amp-Hr Rating Two 12V 7Ah

Calculated capacity is 14 Amp-Hrs to operate system for 24 Hours.

Engine-driven generator dedicated to fire alarm system: N/A

Location of fuel storage: N/A

TYPE BATTERY

Dry Cell Lead-Acid

Nickel-Cadmium Other (Specify):

X Sealed Lead-Acid

(c) Emergency or standby system used as a backup to primary power supply, instead of using a secondary power supply:

NA Emergency system described in NFPA 70, Article 700

NA Legally required standby described in NFPA 70, Article 701

NA Optional standby system described in NFPA 70, Article 702, which also meets the performance requirements of Article 700 or 701

PRIOR TO ANY TESTING

NOTIFICATIONS ARE MADE Yes No Who Time

Monitoring Entity X Fire Department 9:00AM

Building Occupants X Staff 9:00AM

Building Management X Mike Scott 9:00AM

Other (Specify)

AHJ Notified of Any Impairments

SYSTEM TESTS AND INSPECTIONS

TYPE Visual Functional Comments

Control Unit X X Pass

Interface Equipment X X Pass Lamps / LEDs X X Pass Fuses X X Pass Primary Power Supply X X Pass Trouble Signals X X Pass Disconnect Switches X X Pass Ground Fault Monitoring X X Pass

SECONDARY POWER

TYPE Visual Functional Comments

Battery Condition X Good

Load Voltage X Pass-26.49VDC

Discharge test X Pass-26.24VDC

Charger test X Pass-27.44VDC

TRANSIENT SUPPRESSORS NA

REMOTE ANNUNCIATOR NA

NOTIFICATION APPLIANCES

Audible X X Pass

Visible X X Pass

Speakers NA

Voice Clarity NA

INITIATING AND SUPERVISORY DEVICE TESTS AND INSPECTIONS

Location & Serial Number Device Type

Visual Check

Functional Test

Factory Setting

Measured Setting Pass Fail

See attached detailed report.

Date of Last Sensitivity Test: N/A

EMERGENCY COMMUNICATION EQUIPMENT Visual Functional Comments

Phone Set NA

Phone Jacks NA

Off-Hook Indicators NA

Amplifier(s) NA

Tone Generator(s) NA

Call-in Signal NA

System Performance NA

SPECIAL HAZARD SYSTEMS

Number Installed

Number Tested Comments

Kitchen Range Hood System NA

CO2 Extinguishing System NA

(Specify) NA

CONTROL FUNCTIONS / INTERFACE

EQUIPMENT

Number Installed

Number Tested

Elevator Recall NA

Fan Shutdown NA

Door Holders NA

Smoke Control System NA

Door Release (Security Maglocks) NA

(Specify) NA

Special Procedures:

Comments:

SUPERVISING STATION MONITORING Yes No Time Comments

Alarm Signal X

Alarm Restoration X

Trouble Signal X

Trouble Signal Restoration X

Supervisory Signal X

Supervisory Restoration X

NOTIFICATIONS THAT TESTING IS COMPLETE Yes No Time Comments

Building Management X Mike Scott

Monitoring Agency X Fire Department

Building Occupants X Staff

Other (Specify)

The following did not operate correctly: No deficiencies found during this inspection.

NOTE: BUILDING 2601 IS TIED TO BUILDING 2600

System restored to normal operation: Date: July 2, 2019 Time:

THIS TESTING WAS PERFORMED IN ACCORDANCE WITH APPLICABLE NFPA STANDARDS.

Name of Inspector: Jesus Salgado Date: July 2, 2019 Time:

Signature:

Name of Owner or Rep.: Date: Time:

Signature:

PROPERTY NAME: Fresno Air National Guard Building’s 2600 2601 DATE: July 2, 2019

ADDRESS: 5323 E McKinley Ave Fresno, CA, 93727 TIME:

INITIATING AND SUPERVISORY DEVICE TESTS AND INSPECTIONS (SUPPLEMENTAL SHEET)

Location & Serial Number Device Type VIS. FUNC. Address Pass Fail

CLASS ROOM HD X X Z4 X

HALLWAY HD X X Z4 X

READY ROOM HD X X Z4 X

READY ROOM HD X X Z4 X

ABOVE FACP HD X X Z4 X

ABOVE FACP DD X X Z5 X

SUPERVISOR OFFICE HD X X Z4 X

STORAGE ROOM 5 HD X X Z4 X

OFFICE HD X X Z4 X

CENTRAL ROOM HD X X Z4 X

EAST EXIT HD X X Z4 X

EAST EXIT PSSA X X Z2 X

FRONT OFFICE HD X X Z4 X

BAY 5 WEST HD X X Z4 X

BAY 5 WEST PSSA X X Z2 X

BAY 5 EAST PSSA X X Z2 X

BAY 5 EAST HD X X Z4 X

BAY 4 HD X X Z4 X

BAY 4 HD X X Z4 X

BAY 4 PSAA X X Z4 X

BAY 2 HD X X Z4 X

BAY 2 HD X X Z4 X

BAY 2 PSD X X Z2 X

BAY 2 ENTRY PSSA X X Z2 X

BAY 1 HD X X Z2 X

BAY 1 PSSA X X Z2 X

BAY 1 PSSA X X Z2 X

WF 27 SECONDS WF X X Z1 X

BUILDING 2601

ENTRY PSSA X X L1-3 X

WESTEND OF THE BUILDING PSSA X X L1-3 X

WESTEND OF THE BUILDING PSSA X X L1-3 X

WAREHOUSE HD X X Z4 X

WAREHOUSE HD X X Z4 X

WAREHOUSE HD X X Z4 X

WAREHOUSE HD X X Z4 X

WAREHOUSE HD X X Z4 X

WAREHOUSE HD X X Z4 X

File details come from the government source that posted it. Updated .