FANG BLDG 145 ANN FA 7-2019.pdf
PDF 254 KB Posted
- Attached to
- Inspection of Fire Alarm Panels, Main Base
- Solicitation number
- W50S6T24QA011
- Issued by
-
Department of the Army National Guard
About this file
This document contains a federal solicitation for fire alarm inspection and maintenance services at a National Guard base. The 144th Fighter Wing is seeking a firm fixed price contract to inspect and correct any deficiencies in the fire protection systems and devices located in nineteen buildings at the 144th Air National Guard base. The solicitation will be awarded without negotiations so offerors are encouraged to provide their most advantageous pricing initially. The requirement is open to full and open competition. Offerors must have a CAGE code and SAM registration. Quotes are due by email to the contracting office by the specified date and time. A non-mandatory site visit will be held on January 3rd, 2023 at 9:00 AM at the specified location for approved attendees who complete DBIDS pre-enrollment and receive security clearance.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SimplexGrinnell BE SAFE
INSPECTION AND TESTING FORM
SR Number: 44909832 DATE: July 1, 2019
Task Number: TIME: 2:00PM
SERVICE ORGANIZATION PROPERTY NAME (USER)
Name: SimplexGrinnell Name: Fresno Air National Guard Bldg 145
Address: 2788 N. Larkin Ave. Address: 5323 E McKinley Ave
City, St., Zip: Fresno, Ca 93272 City, St., Zip: Fresno, CA, 93727
Representative: Jesus Salgado Owner Contact: Mike Scott
License No.: 986047 Telephone: 559-454-5137
Telephone: 559-348-0614 Occupied as: Master Chief
MONITORING ENTITY APPROVING AGENCY
Contact: In House Fire Department Contact: N/A
Telephone: 559-454-5145 Telephone: N/A
Monitoring Account Ref. No.: N/A
TYPE TRANSMISSION SERVICE
McCulloh Weekly
Multiplex Monthly
X Digital Quarterly
Reverse Polarity Semiannually
RF X Annually
Other (Specify) Other (Specify)
System Type: ( ) Local; ( ) Auxiliary; (X)Remote Station; ( ) Proprietary; ( ) Emergency Voice / Alarm
Control Unit Manufacturer: Monaco Enterprise Model No.: BT2-7
Circuit Style: B
Number of Circuits: NA
Software Rev.: NA
Last Date System Had Any Service Performed: September 25, 2017
Last Date That Any Software or Configuration Was Revised: 1992
ALARM-INITIATING DEVICES AND CIRCUIT INFORMATION
Quantity of Devices Installed
Circuit Style
Devices Tested
8 B 8 Manual Fire Alarm Boxes (PSSA)
0 0 Ion Detectors (ISD)
20 B 20 Photo Detectors (PSD)
0 0 Duct Detectors (DSD)
8 B 8 Heat Detectors (HD)
1 B 1 Water Flow Switches (WF)
0 0 (Specify)
0 0 (Specify)
Alarm verification feature is Disabled X Enabled .
Rev. D
ALARM NOTIFICATION APPLIANCES AND CIRCUIT INFORMATION
Appliances Installed
Appliances Tested
1 B 1 Bells
18 B 18 Horns with strobes
10 B 10 Chimes
4 B 4 Strobes
0 0 Speakers
Number of alarm notification appliance circuits: 4
Are circuits monitored for integrity? X Yes No
SUPERVISORY SIGNAL-INITIATING DEVICES AND CIRCUIT INFORMATION
Devices Installed
Devices Tested
1 B 1 Valve Position Tamper Switch (TS)
2 B 2 Outside Stem and Yoke (OSY)
0 0 Post Indicator Valve (PIV)
0 0 High / Low Pressure Switch (HLPS)
0 0 Building Temperature
0 0 Site Water Temp
0 0 Site Water Level
0 0 Fire Pump Power
0 0 Fire Pump Running
0 0 Fire Pump Auto Position
0 0 Fire Pump or Fire Controller Trouble
0 0 Fire Pump Low Fuel
0 0 Other: Switch Transfer
0 0 Other: Generator Engine Running
SIGNALING LINE CIRCUIT
Quantity and style of signaling line circuits connected to system (see NFPA, Table 6.6.1):
Quantity Style(s)
SYSTEM POWER SUPPLIES
(a) Primary (Main): Nominal Voltage 120VAC Amps 2.5
Overcurrent Protection: Type Circuit Breaker Amps 20
Location (of Primary Supply Panel): TELCOM ROOM
Disconnecting Means Location: CIRCUIT BRAKER PANEL “E” #29
(b) Secondary (Standby):
Back Up Batteries Storage Battery: Amp-Hr Rating Two 12V 18Ah
Calculated capacity is 36 Amp-Hrs to operate system for 24 Hours.
Engine-driven generator dedicated to fire alarm system: N/A
Location of fuel storage: N/A
TYPE BATTERY
Dry Cell Lead-Acid
Nickel-Cadmium Other (Specify):
X Sealed Lead-Acid
(c) Emergency or standby system used as a backup to primary power supply, instead of using a secondary power supply:
NA Emergency system described in NFPA 70, Article 700
NA Legally required standby described in NFPA 70, Article 701
NA Optional standby system described in NFPA 70, Article 702, which also meets the performance requirements of Article 700 or 701
PRIOR TO ANY TESTING
NOTIFICATIONS ARE MADE Yes No Who Time
Monitoring Entity X In House 2:00PM
Building Occupants X Staff 2:00PM
Building Management X Mike Scott 2:00PM
Other (Specify)
AHJ Notified of Any Impairments
SYSTEM TESTS AND INSPECTIONS
TYPE Visual Functional Comments
Control Unit X X Pass
Interface Equipment X X Pass Lamps / LEDs X X Pass Fuses X X Pass Primary Power Supply X X Pass Trouble Signals X X Pass Disconnect Switches X X Pass Ground Fault Monitoring X X Pass
SECONDARY POWER
TYPE Visual Functional Comments
Battery Condition X Good
Load Voltage X Pass-26.44VDC
Discharge test X Pass-25.68VDC
Charger test X Pass-27.24VDC
TRANSIENT SUPPRESSORS NA
REMOTE ANNUNCIATOR N/A
NOTIFICATION APPLIANCES
Audible X X Pass
Visible X X Pass
Speakers NA
Voice Clarity NA
INITIATING AND SUPERVISORY DEVICE TESTS AND INSPECTIONS
Location & Serial Number Device Type
Visual Check
Functional Test
Factory Setting
Measured Setting Pass Fail
See attached detailed report.
Date of Last Sensitivity Test: Unknown
EMERGENCY COMMUNICATION EQUIPMENT Visual Functional Comments
Phone Set NA
Phone Jacks NA
Off-Hook Indicators NA
Amplifier(s) NA
Tone Generator(s) NA
Call-in Signal NA
System Performance NA
SPECIAL HAZARD SYSTEMS
Number Installed
Number Tested Comments
Kitchen Range Hood System NA
CO2 Extinguishing System NA
(Specify) NA
CONTROL FUNCTIONS / INTERFACE
EQUIPMENT
Number Installed
Number Tested
Elevator Recall NA
Fan Shutdown NA
Door Holders NA
Smoke Control System NA
Door Release (Security Maglocks) NA
(Specify) NA
Special Procedures:
Comments:
SUPERVISING STATION MONITORING Yes No Time Comments
Alarm Signal X
Alarm Restoration X
Trouble Signal X
Trouble Signal Restoration X
Supervisory Signal X
Supervisory Restoration X
NOTIFICATIONS THAT TESTING IS COMPLETE Yes No Time Comments
Building Management X Mike Scott
Monitoring Agency X Fire Department
Building Occupants X Staff
Other (Specify)
The following did not operate correctly: No deficiencies found during this inspection.
System restored to normal operation: Date: July 1, 2019 Time:
THIS TESTING WAS PERFORMED IN ACCORDANCE WITH APPLICABLE NFPA STANDARDS.
Name of Inspector: Jesus Salgado Date: July 1, 2019 Time:
Signature:
Name of Owner or Rep.: Date: Time:
Signature:
PROPERTY NAME: Fresno Air National Guard Building 145 DATE: July 1, 2019
ADDRESS: 5323 E McKinley Ave Fresno, CA, 93727 TIME:
INITIATING AND SUPERVISORY DEVICE TESTS AND INSPECTIONS (SUPPLEMENTAL SHEET)
Location & Serial Number Device Type VIS. FUNC. Address Pass Fail
SOUTH HALL PSSA X X ZN 1 X
SOUTH HALL PSD X X ZN 1 X
HS FACC CLRM PSD X X ZN 1 X
HS FACC CLRM PSD X X ZN 1 X
HS FACC CLRM PSD X X ZN 1 X
HS FACC CLRM PSD X X ZN 1 X
HT SM S HALL PSD X X ZN 2 X
SOUTH BUNK PSD X X ZN 2 X
SOUTH HALL PSD X X ZN 2 X
FACC CLRM CLOSET 132 PSD X X ZN 2 X
BUNK RM 130 PSD X X ZN 2 X
BUNK RM 129 PSD X X ZN 2 X
BUNK RM 128 PSD X X ZN 2 X
BUNK RM 131 PSD X X ZN 2 X
BUNK RM 134 PSD X X ZN 2 X
OUTSIDE RR PSD X X ZN 2 X
NORTH HALL PSD X X ZN 2 X
HALL BY 145 PSD X X ZN 3 X
BUNK 148 PSD X X ZN 3 X
DINNING/KITCHEN PSD X X ZN 3 X
BY DINNING/KITCHEN PSSA X X ZN 3 X
DINNING/KITCHEN PSSA X X ZN 3 X
MECHANICAL ROOM PSSA X X ZN 3 X
CLOSET 113 PSD X X ZN 3 X
RM 102 PSD X X ZN 3 X
RM 106 PSSA X X ZN 3 X
BAY PSSA X X ZN 3 X
BAY HD X X ZN 2 X
BAY HD X X ZN 2 X
BAY HD X X ZN 2 X
BAY HD X X ZN 2 X
BAY HD X X ZN 2 X
BAY HD X X ZN 2 X
BAY HD X X ZN 2 X
BAY HD X X ZN 2 X
OS&Y BACKFLOW PREVENTER TS X X L1-2 X
OS&Y BACKFLOW PREVENTER TS X X L1-2 X
BUTTERFLY VALVE TS X X L1-2 X
ITV INSIDE BAY SCBA ROOM 35 SECONDS WF X X L1-1 X
File details come from the government source that posted it. Updated .