This performance work statement describes inspection and repair services required for fire alarm panels and devices in nineteen buildings at the 144th Air National Guard Base in Fresno, California. The contractor will inspect fire protection systems and replace non-compliant devices, fire panels, heat detectors, duct detectors, and carbon monoxide detectors. Inspection services are required to verify compliance with standards including NFPA and UFC. The contractor must be licensed in California and have credentials for Monaco Enterprises fire protection equipment. The period of performance is sixty days. Required submittals include project schedules, safety and quality plans, warranties, and as-built drawings.

View the file

Other files

File Type Posted
FANG BLDG 145 ANN FA 7-2019.pdf PDF
FANG BLDG 122 ANN FA 7-2019.pdf PDF
FANG BLDG 130 ANN FA 6-2019.pdf PDF
Performance Work Statement - Inspection Fire Panel Main Base (HAYW231030)-Amd2.pdf PDF
FANG BLDG 135 ANN FA 6-2019.pdf PDF
FANG BLDG 2640 ANN FA 7-2019.pdf PDF
FANG BLDG 2602 ANN FA 7-2019.pdf PDF
Solicitation Amendment W50S6T24QA0110002 SF 30.pdf PDF
FANG BLDG 102 ANN FA 7-2019.pdf PDF
FANG BLDG 121 ANN FA 7-2019.pdf PDF
FANG BLDG 159 ANNUAL FA 6-2019.pdf PDF
FANG BLDG 124 ANN FA 6-2019.pdf PDF
Solicitation Amendment - W50S6T24QA0110002 SF1449.pdf PDF
FANG BLDG 125 ANN FA 6-2019.pdf PDF
FANG BLDG 117 ANN FA 6-2019.pdf PDF
FANG BLDG 126 ANN FA 6-2019.pdf PDF
FANG BLDG 157 ANNUAL FA 6-2019.pdf PDF
FANG Bldg 100 Annual FA 6-2019.pdf PDF
FANG BLDG 155 ANN FA 7-2019.pdf PDF
FANG BLDG 104 ANN FA 7-2019.pdf PDF
FANG BLDG 225 ANN FA 6-2019.pdf PDF
FANG BLDG 2600 2601 ANN FA 7-2019.pdf PDF
FANG BLDG 194 ANN FA 7-2019.pdf PDF
Solicitation Amendment W50S6T24QA0110001 SF 30.pdf PDF
Base Access-144 SFS DVES FORM- 20230127 (Site Visit).pdf PDF
Wage Determinations SCA - 2015-5609 dated 3Aug2023.pdf PDF
Solicitation - W50S6T24QA011 SF1449 RFQ.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

MAIN BASE FIRE DEFICIENCIES INSPECTION AND REPAIR

PROJECT NO: HAYW231030

30 October 2023

144TH FIGHTER WING CALIFORNIA AIR

NATIONAL GUARD, FRESNO

1.0 DESCRIPTION OF SERVICES

This performance work statement (PWS) describes contractor requirements for the project titled “Inspection and Repair Fire Deficiencies, Multiple Buildings on 144 FW main base”. All work will occur at the Fresno Air National Guard Base, Fresno, California. The contractor is responsible to furnish and install all labor and materials to complete the items listed in this performance work statement. The contractor shall provide the government a complete and usable product that will be inspected/accepted by the government at the completion of the project. All information included in this document, along with the instructions and standards referenced in the document, shall be considered as part of the Performance work statement.

2.0 SITE OF WORK

All work will occur at the

Fresno Air National Guard Base 5323 McKinley Ave, Fresno, CA 93727

3.0 PERFORMANCE WORK STATEMENT

3.1 Objectives: The purpose of this project is to correct Monaco Enterprises Inc, fire protection system (fire panels and devices) deficiencies for nineteen (19) buildings at the 144th Air National Guard (ANG) Base, Fresno, California.

The work includes but is not limited to the following:

3.1.1 Provide inspection and repairs for fire suppression systems/fire panels where annual maintenance/certifications have lapsed. A report shall be provided of remaining repairs/services to bring fire panels and devices operational and ready for certification. The fire reports shall be available to the government 30 days after inspection is completed.

3.1.2 All work performed shall be in accordance with applicable National Fire Protection Association (NFPA), International Building Code (IBC), Unified Facility Criteria (UFC), Unified Facility Guidance Specifications (UFGS), Air Force Instruction (AFI), Department of the Air Force Instruction (DAFI) 32-2001 and Air Force Manual (AFMAN) requirements.

3.2 In addition to the general work requirements described above, the following outlines the work required within each facility with approximate existing locations, quantities, and systems compatible with Monaco Enterprises.

3.2.1 Building 100

3.2.1.1 Replace one heat detector in the east end of the south wall on the second floor. After devices replacement completed, provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section 2-2.2 Table 2-1, and AFI 32-10141, FSD Code Decision Matrix, Rule 15.

3.2.2 Building 102

3.2.2.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section 2-2.2 Table 2-1, and AFI 32-10141, FSD Code Decision Matrix, Rule 15.

3.2.3 Building 117

3.2.3.1 Replace fire panel and provide inspection for the fire protection system to comply with UFC 3-601- 02, Section 2-2.2 Table 2-1., AFI 32-10141, FSD Code Decision Matrix, Rule 15, NFPA 101 Chapter 10.2.5, NFPA 101 Chapter 5, Section 5.2.1.1.4, and AFI 32-10141, FSD 1, Rule 15.

3.2.4 Building 121

3.2.4.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section 2-2.2 Table 2-1., AFI 32-10141, FSD Code Decision Matrix, Rule 15, NFPA 101 Chapter 10.2.5, NFPA 101 Chapter 5, Section 5.2.1.1.4, and AFI 32-10141, FSD 1, Rule 15.

3.2.5 Building 122

3.2.5.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section

3.2.6 Building 123

3.2.6.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section

3.2.7 Building 124

3.2.7.1 Replace one duct detector at the north end of the building. After devices replacement completed, provide annual inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section 2-2.2 Table 2-1, and AFI 32-10141, FSD Code Decision Matrix, Rule 15.

3.2.8 Building 125

3.2.8.1 Provide inspection on the wet sprinkler system and fire protection system to comply with UFC 3-601- 02, Section 2-2.2 Table 2-1., AFI 32-10141, FSD Code Decision Matrix, Rule 15, NFPA 101 Chapter 10.2.5, NFPA 101 Chapter 5, Section 5.2.1.1.4, AFI 32-10141, FSD 1, Rule 1, and NFPAs 70 and 72.

3.2.9 Building 126

3.2.9.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section

3.2.10 Building 130

3.2.10.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02, Section 2-2.2 Table 2-1., AFI 32-10141, FSD Code Decision Matrix, Rule 15, NFPA 101 Chapter 10.2.5,

3.2.11 Building 135 & 136

3.2.11.1 Provide inspection for the fire protection system and fire panel for building 135 to comply with UFC 3-601-02, Section 2-2.2 Table 2-1., AFI 32-10141, FSD Code Decision Matrix, Rule 15, NFPA 101 Chapter 10.2.5, NFPA 101 Chapter 5, Section 5.2.1.1.4, and AFI 32-10141, FSD 1, Rule 15.

3.2.11.2 Replace fire panel and provide inspection for the fire protection system for building 136 to comply with UFC 3-601-02, Section 2-2.2 Table 2-1., AFI 32-10141, FSD Code Decision Matrix, Rule 15, NFPA 101 Chapter 10.2.5, NFPA 101 Chapter 5, Section 5.2.1.1.4, and AFI 32-10141, FSD 1, Rule 15.

SANCHEZ, JARROD A MSgt US Air Force ANG 144 FW/MSC Is this fire panel being replaced with a new panel?

TRAN, HUY G SSgt USAF ANG 144 CES/CE "Replace" would be a better word

SANCHEZ, JARROD A MSgt US Air Force ANG 144 FW/MSC Is this fire panel being replaced with a new panel?

TRAN, HUY G SSgt USAF ANG 144 CES/CE Same as above

3.2.12 Building 145

3.2.12.1 Replace one CO detector at the single bunk north of the building. After devices replacement completed, provide annual inspection for the fire protection system and fire panel to comply with UFC 3- 601-02, Section 2-2.2 Table 2-1, and AFI 32-10141, FSD Code Decision Matrix, Rule 15.

3.2.13 Building 155

3.2.13.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02,

3.2.14 Building 157

3.2.14.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02,

3.2.15 Building 159:

3.2.15.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02,

3.2.16 Building 194:

3.2.16.2 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02,

3.2.17 Building 225 & 228

3.2.17.1 Provide inspection for the fire protection system and fire panel to comply with UFC 3-601-02,

3.3 Directions:

3.3.1 Complete all work according to manufacturers’ specifications.

3.3.2 All electrical work (if required) will be done with the trade labor’s best practices and in accordance with the

NEC.

3.3.3 Contractor must be qualified and experienced in accordance with NFPA requirements.

3.3.4 Remove and replace non-compliant devices that no longer meet NFPA requirements.

3.3.5 The new addressable fire panel and devices will be tested to 100% functionality after installation.

3.3.6 All fire protection systems shall use equipment that is Underwriter’s Laboratory (UL) listed or Factory Mutual (FM) approved for its intended fire protection service.

3.3.7 Systems shall utilize supervised non-proprietary generic type detection devices and notification appliances and shall be interchangeable with other brands that are readily available to the extent practical.

3.4 Demolition

3.4.1 All materials removed by the Contractor shall be inspected by the COR and determined as salvageable or disposable materials. All material determined to be disposable by the COR becomes the property of the Contractor and shall be removed or disposed of off government property.

3.4.2 Existing electrical conduit and cable shall be protected and remain in place during demolition work and if possible, electrical cable shall be reused to power the replacement equipment if compatible.

4.0 CONTRACTOR LICENSE REQUIREMENTS

4.1 The contractor will possess a valid California “B” or “C-16” license or an applicable State issued general or specialty contractor’s license and be able to provide proof of competence in the area of work. The contractor may self-perform sections of the project.

4.2 All listed sub-contractors working for the contractor will possess the applicable Contractor’s license. The contractor must be able to provide a C-16 (or state equivalent) specialty license.

4.3 Contractor must have Monaco Enterprises Inc. credentials and be able to provide proof of familiarity with Monaco Enterprise Inc. equipment and repair experience.

5.0 PROJECT SPECIFIC REQUIREMENTS

5.1 The project is to be completed no later than 60 days after the start of performance. Moving furniture and removal/replacement of wall hung items such as bulletin boards is the responsibility of the government. Cabinets and fixtures will remain in place during the project. The contractor and government will discuss the final phasing (if applicable) and schedule during the post award conference.

5.2 Materials. The following lists material requirements for this project. Contractor may request substitutes for an approved equal during the post award conference. All substitution requests shall be made in writing on the AF Form 3000. All components must be compatible with Monaco Enterprises systems. Requests for material substitutions made after the post award conference may not be granted by the Government.

6.0 GENERAL REQUIREMENTS

6.1 When required, the Contractor will attend a Post Award Conference. The Post Award Conference will generally be scheduled after award but prior to performance. At a minimum, the contractor shall have their project manager and site superintendent attend the meeting. The Contractor will provide the following documents at the Post Award Conference:

6.1.1 Project Schedule

6.1.2 Contract Schedule of Values

6.1.3 Safety Plan

6.1.4 Quality Control Plan

6.1.5 Material Submittals

6.1.6 Material Safety Data Sheets

6.2 Utilities and Storage. The government will provide water, sewer, and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to utilizing. Secured storage is the responsibility of the contractor.

6.3 Quality Control. Contractor shall develop and maintain a quality program to ensure work is performed as described in this performance work statement and in accordance with all local, state, and federal rules.

6.4 Quality Assurance. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this performance work statement and in accordance with all local, state, and federal rules. The Project Manager will manage the Government’s QA program.

6.5 Hours of Operation. The hours of work shall be between 7:00 a.m. and 4:30 p.m. Monday through Friday unless otherwise prescribed by this performance work statement. Work shall not be performed on Weekends, Federal Holidays, and Scheduled Days Off (SDO) without prior coordination from the Project Manager. The base participates in a 5-4-9 compressed work schedule with an SDO typically occurring every two weeks. A schedule will be provided upon contract award.

6.6 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

6.6.1 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

6.6.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

6.6.3 For Contractors that do not require CAC but require access to a DoD Facility and/or Installation.

Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (TSDB) (AFI 10‐245, AFI 31‐101 and AFMAN 31‐113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

6.6.3.1 Base Access. Base security requires all personnel entering the installation be cleared for access. The contractor will provide first name, last name, date of birth and DBIDS code for all personnel accessing the base. The contractor shall submit this information using the Wing Form and DBIDS Pre-Enrollment application no later than five working days prior to the date of required access. Foreign national reviews require fourteen working days for review. All contractor personnel must maintain a valid driver’s license, vehicle registration/proof of insurance (if applicable) at all times while on base. A Real ID is the preferred identification for base vetting purposes. In lieu of a Real ID, Original Social Security Card and Original Birth Certificate or a valid U.S. Passport will suffice. The primary method of Antiterrorism Awareness Level I Training will be by instructor.

6.6.3.1.1 DBIDS Pre-enrollment: https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

6.6.3.1.2 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6.6.3.1.3 Failure to comply with these requirements may result in withholding of final payment.

6.6.4 Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ faces/page/login/Login.seam. For those without a CAC, select "Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

6.7 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

6.8 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

6.9 The Contractor, and all listed sub‐contractors, must be State licensed. Refer to the Project Specific Requirements section for the required license from the Contractor.

6.10 Technical Competence and Ability. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this performance work statement. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.

6.11 Dimensions and Quantity. All dimensions and quantities provided in the performance work statement are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.

6.12 Submittals. All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture, or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cut‐sheet.

https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

6.13 Warranty. The contractor shall guarantee all workmanship and materials covered under this performance work statement for a period of no less than one (1) year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this performance work statement.

7.0 CLOSEOUT DOCUMENTATION

7.1.1 Contractor workmanship letter of warranty up to one year.

7.1.2 Certificates of no debts to suppliers and vendors.

7.1.3 As-built drawing.

7.1.4 Recycling or Landfill proof of disposition document (if available).

7.1.5 All applicable O&M manuals

8.0 DEFINITIONS

Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

Contracting Officer (KO): A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

Defective Service: A service output that does not meet the standard of performance associated with the PWS.

Deliverable: Anything that can be physically delivered and includes non‐manufactured things such as meeting minutes or reports.

Physical Security: Actions that prevent the loss or damage of Government property.

Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

Quality Control: All necessary measures taken by the Contractor to ensure that the quality of the end product or service shall meet contract requirements.

Subcontractor: One that enters a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

9.0 ACRONYMS

AF Air Force AFI Air Force Instruction AFMAN Air Force Manual ANG Air National Guard AT Antiterrorism

SANCHEZ, JARROD A MSgt US Air Force ANG 144 FW/MSC 10% retainage is not appropriate for non-construction projects.

Q: Does CE require these documents if this is considered a repair service?

TRAN, HUY G SSgt USAF ANG 144 CES/CE Yes, and COSCO has verified with me that after the project is completed, as-built will be submitted to CE for record keeping purposes. With that being said, as-built will comprise of technical information about installed devices and fire panel.

CAC Common Access Card COMSEC Communications Security COR Contracting Officer Representative DBIDS Defense Biometric Identification System DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DoDI Department of Defense Instruction FAR Federal Acquisition Regulation FM Factory Manual FPCON Force Protection Condition FSD Fire Safety Deficiency FW Fighter Wing HAF Headquarters Air Force IAW In Accordance With IBC International Building Code ID Identification IT Information Technology JKO Joint Knowledge Online KO Contracting Officer NCIC-III National Crime Information Center Interstate Identification Index NEC National Electrical Code NFPA National Fire Protection Association NLT No later than O&M Operations and Maintenance

OCONUS

PWS

Outside the Contiguous United States Performance Work Statement

QA Quality Assurance QC Quality Control SDO Scheduled Day Off TE Technical Exhibit TSDB Terrorist Screening Database UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specifications UL Underwriter’s Laboratory US United States

10.0 APPLICABLE PUBLICATIONS

Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition Regulation

Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars

AFI 10-245

Antiterrorism

03/28/2013 (Certified current 03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&serie s=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and Procedures

08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&serie s=-1&modID=449&tabID=131

AFI 32-10141

Planning and Programming Fire Safety Deficiency Correction Projects

05/15/2019 https://static.e-publishing.af.mil/production/1/af_a4/publication/afi3

2-10141/afi32-10141.pdf

AFMAN 31-113

Security Forces Standards and Procedures 03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&serie s=-1&modID=449&tabID=131 DoDI 2000.16

DoD Antiterrorism (AT) Standards 10/02/2006 Change 2:

12/08/2006 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=7

28dd2c3cfd211ecb0249768548f21c5

UFGS 26 20 00

Interior Distribution System 08/01/2019 Change 3:

11/01/2021 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-20-00

UFGS 26 52 00.00 40

Emergency Lighting

11/01/2017 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-52-00-00-40

NFPA 13

Standard for the Installation of Sprinkler

Systems

2022 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13

NFPA 70

National Electrical Code 2020 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70

NFPA 72

National Fire Alarm and Signaling Code

2022 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72

NFPA 101

Life Safety Code 2021 Edition https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101

UFC 3-601-02

Fire Protection Systems Inspection, Testing, And Maintenance

10/07/2021 https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-601-02

11.0 APPLICABLE FORMS

Forms applicable to the PWS are listed below:

Form Date Website Base Access Request Form N/A N/A (Local copy provided after award)

AF3000

Material Approval Submittal

08/31/2003 https://static.e-publishing.af.mil/production/1/saf_aq/form/af3000/af3000.pdf

DD 1354 AUG 2013 https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd13 54.pdf https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-10141/afi32-10141.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-10141/afi32-10141.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-10141/afi32-10141.pdf https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=728dd2c3cfd211ecb0249768548f21c5 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=728dd2c3cfd211ecb0249768548f21c5 https://www.acq.osd.mil/ncbdp/nm/pseag/news-references/references/DoDI_2000.16.pdf?msclkid=728dd2c3cfd211ecb0249768548f21c5 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-20-00 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-20-00 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-52-00-00-40 https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-26-52-00-00-40 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=13 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=70 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=72 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101 https://www.nfpa.org/codes-and-standards/all-codes-and-standards/list-of-codes-and-standards/detail?code=101 https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-601-02 https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-601-02 https://static.e-publishing.af.mil/production/1/saf_aq/form/af3000/af3000.pdf https://static.e-publishing.af.mil/production/1/saf_aq/form/af3000/af3000.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd1354.pdf https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd1354.pdf

Transfer and Acceptance of DoD Real Property

TECHNICAL EXHIBIT I

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

6.1.1 Project Schedule

Before performance;

Revisions as needed

1 copy Electronic (PDF or Word format)

COR

6.1.2 Contract Schedule of

Values

Before performance 1 copy Electronic (PDF or Word format)

COR

6.1.3 Safety Plan

Before performance 1 copy Electronic (PDF or Word format)

COR

6.1.4 Quality Control Plan

Before performance 1 copy Electronic (PDF or Word format)

COR

6.1.6 Material Safety Data

Sheets

Before performance 1 copy Electronic (PDF format)

COR

6.6.3.1, 11.0 Base Access Request

Form

Initial request shall be provided no later than five

(5) business days prior to the anticipated performance start date.

Revised requests shall be provided as they become known and allow at least five

(5) business days for processing.

1 copy Electronic (PDF format)

COR

6.6.3.1.2 Identification Media

Return within 10 business days of employee’s departure from contract performance.

Original(s) Hard Copy COR

5.4, 6.1.5, 6.12 Material Submittals

Before performance; As needed

1 copy Electronic (PDF format)

KO

6.13, 7.1.1 Warranty Letter

Upon completion 1 copy Electronic (PDF format)

COR

7.1.2 Certificates of no

debts to suppliers and vendors

Upon completion 1 copy Electronic (PDF format)

COR

7.1.3 Before & After

Photos

Upon completion 1 copy Electronic (PNG or

JPEG)

COR

3.4.1, 7.1.4 Recycling or Landfill proof of disposition document (if available)

Upon completion 1 copy Electronic (PDF format)

COR

6.1.7, 7.1.6 DD 1354 Transfer and Acceptance of DoD Real Property

Draft before start of performance; Final upon completion

1 copy Electronic (PDF format)

COR

7.1.5 O&M Manuals (if

applicable)

Upon completion 1 copy Electronic (PDF or Word format)

COR

7.1.7 Contractor

Completed As-Builts

Upon completion 1 copy Electronic (PDF or Word format)

COR

1.0 DESCRIPTION OF SERVICES
9.0 ACRONYMS