FANG Bldg 100 Annual FA 6-2019.pdf

PDF 359 KB Posted

Attached to
Inspection of Fire Alarm Panels, Main Base
Solicitation number
W50S6T24QA011
Issued by

About this file

This document contains a solicitation for inspection services of fire alarm panels and devices at nineteen buildings on an Air National Guard base. The 144th Fighter Wing is requesting quotes for a firm fixed price contract to inspect and correct any deficiencies in the Monaco Enterprises Inc. fire protection system. Interested parties must have a CAGE code and SAM registration. Quotes are due by email to the contracting inbox before the specified date and time. A non-mandatory site visit will be held on January 3, 2023 at 9:00am at the base location for pre-enrolled attendees who are cleared through security background checks. The selected contractor will be responsible for inspecting and correcting any issues found in the fire panels, devices, and related systems across nineteen buildings to ensure compliance with standards.

View the file

Other files

File Type Posted
FANG BLDG 145 ANN FA 7-2019.pdf PDF
FANG BLDG 122 ANN FA 7-2019.pdf PDF
FANG BLDG 130 ANN FA 6-2019.pdf PDF
Performance Work Statement - Inspection Fire Panel Main Base (HAYW231030)-Amd2.pdf PDF
FANG BLDG 135 ANN FA 6-2019.pdf PDF
FANG BLDG 2640 ANN FA 7-2019.pdf PDF
FANG BLDG 2602 ANN FA 7-2019.pdf PDF
Solicitation Amendment W50S6T24QA0110002 SF 30.pdf PDF
FANG BLDG 102 ANN FA 7-2019.pdf PDF
FANG BLDG 121 ANN FA 7-2019.pdf PDF
FANG BLDG 159 ANNUAL FA 6-2019.pdf PDF
FANG BLDG 124 ANN FA 6-2019.pdf PDF
Solicitation Amendment - W50S6T24QA0110002 SF1449.pdf PDF
FANG BLDG 125 ANN FA 6-2019.pdf PDF
FANG BLDG 117 ANN FA 6-2019.pdf PDF
FANG BLDG 126 ANN FA 6-2019.pdf PDF
FANG BLDG 157 ANNUAL FA 6-2019.pdf PDF
FANG BLDG 155 ANN FA 7-2019.pdf PDF
FANG BLDG 104 ANN FA 7-2019.pdf PDF
FANG BLDG 225 ANN FA 6-2019.pdf PDF
FANG BLDG 2600 2601 ANN FA 7-2019.pdf PDF
FANG BLDG 194 ANN FA 7-2019.pdf PDF
Solicitation Amendment W50S6T24QA0110001 SF 30.pdf PDF
Base Access-144 SFS DVES FORM- 20230127 (Site Visit).pdf PDF
Wage Determinations SCA - 2015-5609 dated 3Aug2023.pdf PDF
Solicitation - W50S6T24QA011 SF1449 RFQ.pdf PDF
Performance Work Statement - Inspection Fire Panel Main Base.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SimplexGrinnell BE SAFE

INSPECTION AND TESTING FORM

SR Number: 44909832 DATE: June 17, 2019

Task Number: 68245545 TIME: 8:00AM

SERVICE ORGANIZATION PROPERTY NAME (USER)

Name: SimplexGrinnell Name: Fresno Air National Guard Bldg 100

Address: 2788 N. Larkin Ave. Address: 5323 E McKinley Ave

City, St., Zip: Fresno, CA, 93272 City, St., Zip: Fresno, CA, 93727

Representative: Jesus Salgado Owner Contact: Mike Scott

License No.: 987047 Telephone: 559-454-5137

Telephone: 559-348-0614 Occupied as: Chief

MONITORING ENTITY APPROVING AGENCY

Contact: In House Contact: N/A

Telephone: N/A Telephone: N/A

Monitoring Account Ref. No.: N/A

TYPE TRANSMISSION SERVICE

McCulloh Weekly

Multiplex Monthly

X Digital Quarterly

Reverse Polarity Semiannually

RF X Annually

Other (Specify) Other (Specify)

System Type: ( ) Local; ( ) Auxiliary; (X)Remote Station; ( ) Proprietary; ( ) Emergency Voice / Alarm

Control Unit Manufacturer: Simplex Model No.: 4100U NODE 1 4100U NODE 2 Foam

Circuit Style: B

Number of Circuits: NA

Software Rev.: 12.07.01

Last Date System Had Any Service Performed: September 27, 2017

Last Date That Any Software or Configuration Was Revised: February 25, 2016

ALARM-INITIATING DEVICES AND CIRCUIT INFORMATION

Quantity of Devices Installed

Circuit Style

Devices Tested

38 B 38 Manual Fire Alarm Boxes (PSSA)

0 0 Ion Detectors (ISD)

34 B 34 Photo Detectors (PSD)

12 B 12 Duct Detectors (DSD)

76 B 76 Heat Detectors (HD)

2 B 2 Water Flow Switches (WF)

1 B 1 WPS Water Pressure Switch

7 B 7 (Specify) Suppression Manual Dump

0 0 (Specify)

Alarm verification feature is Disabled X Enabled .

Rev. D

ALARM NOTIFICATION APPLIANCES AND CIRCUIT INFORMATION

Appliances Installed

Appliances Tested

1 1 Bells

36 B 36 Horns with strobes

0 0 Chimes

14 B 14 Strobes

0 0 Speakers

0 0 (Specify)

Number of alarm notification appliance circuits:

Are circuits monitored for integrity? X Yes No

SUPERVISORY SIGNAL-INITIATING DEVICES AND CIRCUIT INFORMATION

Devices Installed

Devices Tested

22 B 22 Valve Position Tamper Switch (TS)

2 B 2 Outside Stem and Yoke (OSY)

0 0 Post Indicator Valve (PIV)

1 B 1 High / Low Pressure Switch (HLPS)

0 0 Building Temperature

0 0 Site Water Temp

0 0 Site Water Level

2 B 2 Fire Pump Power

2 B 2 Fire Pump Running

0 0 Fire Pump Auto Position

0 0 Fire Pump or Fire Controller Trouble

0 0 Fire Pump Low Fuel

0 0 Other: Switch Transfer

0 0 Other: Generator Engine Running

SIGNALING LINE CIRCUIT

Quantity and style of signaling line circuits connected to system (see NFPA, Table 6.6.1):

Quantity Style(s)

SYSTEM POWER SUPPLIES

(a) Primary (Main): Nominal Voltage 120VAC Amps 10

Overcurrent Protection: Type Circuit Breaker Amps 20

Location (of Primary Supply Panel): Boiler Room

Disconnecting Means Location: Panel 1LBR breaker #2

(b) Secondary (Standby):

Back Up Batteries Storage Battery: Amp-Hr Rating Two 12V 55Ah

Calculated capacity is 110 Amp-Hrs to operate system for 24 Hours.

Engine-driven generator dedicated to fire alarm system: NA

Location of fuel storage: NA

TYPE BATTERY

Dry Cell Lead-Acid

Nickel-Cadmium Other (Specify):

X Sealed Lead-Acid

(c) Emergency or standby system used as a backup to primary power supply, instead of using a secondary power supply:

NA Emergency system described in NFPA 70, Article 700

NA Legally required standby described in NFPA 70, Article 701

NA Optional standby system described in NFPA 70, Article 702, which also meets the performance requirements of Article 700 or 701

PRIOR TO ANY TESTING

NOTIFICATIONS ARE MADE Yes No Who Time

Monitoring Entity X In House 8:00AM

Building Occupants X Site Staff 8:00AM

Building Management X Chief Scott 8:00AM

Other (Specify)

AHJ Notified of Any Impairments

SYSTEM TESTS AND INSPECTIONS

TYPE Visual Functional Comments

Control Unit X X Pass

Interface Equipment X X Pass Lamps / LEDs X X Pass Fuses X X Pass Primary Power Supply X X Pass Trouble Signals X X Pass Disconnect Switches X X Pass Ground Fault Monitoring X X Pass

SECONDARY POWER

TYPE Visual Functional Comments

Battery Condition X Ok- Batteries Installed 12-14-15

Load Voltage X Fail-22.42VDC

Discharge test X Pass-25.24VDC

Charger test X Pass-26.46VDC

TRANSIENT SUPPRESSORS NA

REMOTE ANNUNCIATOR NA

NOTIFICATION APPLIANCES

Audible X X Pass

Visible X X Pass

Speakers NA

Voice Clarity NA

INITIATING AND SUPERVISORY DEVICE TESTS AND INSPECTIONS

Location & Serial Number Device Type

Visual Check

Functional Test

Factory Setting

Measured Setting Pass Fail

See attached detailed report.

Date of Last Sensitivity Test: Unknown

EMERGENCY COMMUNICATION EQUIPMENT Visual Functional Comments

Phone Set NA

Phone Jacks NA

Off-Hook Indicators NA

Amplifier(s) NA

Tone Generator(s) NA

Call-in Signal NA

System Performance NA

SPECIAL HAZARD SYSTEMS

Number Installed

Number Tested Comments

Kitchen Range Hood System NA

CO2 Extinguishing System NA

(Specify) NA

CONTROL FUNCTIONS / INTERFACE

EQUIPMENT

Number Installed

Number Tested

Elevator Recall NA

Fan Shutdown NA

Door Holders NA

Smoke Control System NA

Door Release (Security Maglocks) NA

(Specify) NA

Comments: Upon arrival Pre Action system on the 2nd floor room 201C was out of service. Control

Was shut we did not test anything tied to that system. The IT guy who let us in wanted to get a quote about

Comments: Having a special gas system inside that room.

Did not test any of the devices inside building 104 no access available.

SUPERVISING STATION MONITORING Yes No Time Comments

Alarm Signal X

Alarm Restoration X

Trouble Signal X

Trouble Signal Restoration X

Supervisory Signal X

Supervisory Restoration X

NOTIFICATIONS THAT TESTING IS COMPLETE Yes No Time Comments

Building Management X M.O.D

Monitoring Agency X In House

Building Occupants X Staff

Other (Specify) X

The following did not operate correctly: 4100U Node 1 Main Panel needs two 12V 55Ah batteries replaced.

Both failed the load voltage test and have been in service since 12-14-15.

4100U Node 2 Foam Releasing Panel needs two 12V 18Ah batteries replaced both failed the load voltage test.

Also the batteries do not show dates on them.

System restored to normal operation: Date: June 19, 2019 Time: 1:00PM

THIS TESTING WAS PERFORMED IN ACCORDANCE WITH APPLICABLE NFPA STANDARDS.

Name of Inspector: Jesus Salgado Date: June 19, 2019 Time:

Signature:

Name of Owner or Rep.: Date: Time:

Signature:

PROPERTY NAME: Fresno Air National Guard Building 100 DATE: June 17, 2019

ADDRESS: 5323 E McKinley Ave Fresno, CA, 93727 TIME:

INITIATING AND SUPERVISORY DEVICE TESTS AND INSPECTIONS (SUPPLEMENTAL SHEET)

Type VIS. FUNC. Address Pass Fail

1st/2nd Fl North Wing PSSA X X ZN 1 X

1st FL West Wing PSSA X X ZN 2 X

1st/2nd FL South Wing PSSA X X ZN 3 X

1st Floor Weapons & Release Shop Area PSSA X X ZN 4 X

Fire Pump Room North Door PSSA X X ZN 5 X

Building 104 Exit Doors PSSA ZN 6

1st FL North Wing East/West Exit Stairs PSD X X ZN7 X

1st FL South Wing East/West Exit Stairs PSD X X ZN 8 X

Building 104 Corridor Smokes PSD X X ZN 9 X

2nd FL North Wing Corridor Smokes PSD X X ZN 10 X

2nd FL West Wing Corridor Smokes PSD X X ZN 11 X

2nd FL South Wing Corridor Smokes PSD X X ZN 12 X

1st FL North Wing Ceiling Heats HD X X ZN 13 X

1st FL North Wing East Ceiling Heats HD X X ZN 14 X

1st FL West Wing North Ceiling Heats HD X X ZN 15 X

1st FL West Wing South Ceiling Heats HD X X ZN 16 X

1st FL South Wing West Ceiling Heats HD X X ZN 17 X

1st FL South Wing East Ceiling Heats HD X X ZN 18 X

Weapons & Release Shop Area Heats HD X X ZN 19 X

Weapons & Release Area Smokes HD X X ZN 20 X

Fire Pump Heat North Device HD X X ZN 21 X

Building 104 Ceiling Heats HD ZN 22

2nd FL North Wing West Ceiling Heats HD X X ZN 23 X

2nd FL North Wing East Ceiling Heats HD X X ZN 24 X

2nd FL West Wing North Ceiling Heats HD X X ZN 25 X

2nd FL west Wing South Ceiling Heats HD X X ZN 26 X

2nd FL South Wing West Ceiling Heats HD X X ZN 27 X

2nd FL South Wing East Ceiling Heats HD X X ZN 28 X

1st FL North Wing West Attic Heats HD X X ZN 29 X

1st FL North Wing East Attic Heats HD X X ZN 30 X

1st FL West Wing North Attic Heats HD X X ZN 31 X

1st FL West Wing South Attic Heats HD X X ZN 32 X

1st FL South Wing West Attic Heats HD X X ZN 33 X

1st FL South Wing East Attic Heats HD X X ZN 34 X

Weapons & Release Attic Heats HD X X ZN 35 X

Building 104 Attic Heats HD ZN 36

2nd FL North Wing West Attic Heats HD X X ZN 37 X

2nd FL North Wing East Attic Heats HD X X ZN 38 X

2nd FL North Wing Corridor Attic Heats HD X X ZN 39 X

2nd FL West Wing North Attic Heats HD X X ZN 40 X

2nd FL West Wing South Attic Heats HD X X ZN 41 X

2nd FL West Wing Corridor Attic Heats HD X X ZN 42 X

2nd FL South Wing West Attic Heats HD X X ZN 43 X

2nd FL South Wing East Attic Heats HD X X ZN 44 X

2nd FL South Wing Corridor Attic Heats HD X X ZN 45 X

Weapons & Release Shop Area DD X X ZN 46 X

2nd FL North Area Duct DD X X ZN 47 X

2nd FL South Wing Duct DD X X ZN 48 X

Ejection Seat Recharge RMS PSD X X ZN 49

PROPERTY NAME: Fresno Air National Guard Building 100 DATE: June 18, 2019

Type VIS. FUNC. Address Pass Fail

Fire Pump #1 Running SUPV X X ZN09 X

Fire Pump #2 Running SUPV X X ZN06 X

Fire Pump #1 Power Loss TBL X X ZN10 X

Fire Pump #2 Power Loss TBL X X ZN07 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 1 HANGAR HD X X ZN 1 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

ZN 2 HANGAR HD X X ZN 2 X

To add more sheets, copy this page and paste it to the end of this document. Page 6 Of 7

PROPERTY NAME: Fresno Air National Guard Building 100 DATE: June 17, 2019

Type VIS. FUNC. Address Pass Fail

ZN 47 DUCT 2ND FLOOR DD X X ZN 47 X

ZN 47 DUCT 2ND FLOOR DD X X ZN 47 X

ZN 47 DUCT 2ND FLOOR DD X X ZN 47 X

ZN 47 DUCT 2ND FLOOR DD X X ZN 47 X

ZN 47 DUCT 2ND FLOOR DD X X ZN 47 X

ZN 48 DUCT 2ND FLOOR DD X X ZN 48 X

ZN 48 DUCT 2ND FLOOR DD X X ZN 48 X

ZN 48 DUCT 2ND FLOOR DD X X ZN 48 X

ZN 48 DUCT 2ND FLOOR DD X X ZN 48 X

Fire Pump Room South Door PSSA X X ZN05 X

Admin Office Water Flow 52 Seconds WF X X ZN51 X

Hangar Sprinkler Water Flow 68 Seconds WF X X ZN03 X

Admin Office Tamper Switch STS X X ZN50 X

Fire Pump Heat Detector South Device HD X X ZN21 X

Fire Pump Tamper Switches Jockey Pump STS X X ZN52 X

Fire Pump Tamper Switches Jockey Pump STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

Fire Pump Tamper Switches STS X X ZN52 X

South Hangar Manual Dump Stations SMD X X ZN04 X

South Hangar Manual Dump Stations SMD X X ZN04 X

South Hangar Manual Dump Stations SMD X X ZN04 X

North Hangar Manual Dump Stations SMD X X ZN05 X

North Hangar Manual Dump Stations SMD X X ZN05 X

North Hangar Manual Dump Stations SMD X X ZN05 X

North Hangar Manual Dump Stations SMD X X ZN05 X

Office Surge Tank #19 Control Valve STS X X ZN50 X

Hangar Surge Tank #20 STS X X ZN12 X

Hangar Surge Tank #20 STS X X ZN12 X

Deluge Riser Control Valve BFV STS X X ZN12 X

Deluge Riser Over Head Valve STS X X ZN12 X

Hangar Foam Deluge Riser HLPS X X M1-08 X

To add more sheets, copy this page and paste it to the end of this document. Page 7 Of 7