W31P4Q17R0046-0002.pdf

PDF 13 KB Posted

Attached to
Hydra-70 Rocket System Production and Engineering Services
Solicitation number
W31P4Q-17-R-0046
Issued by

About this file

This document consists of an amendment to a solicitation and federal contract opportunity notice for the Hydra-70 Rocket System. The amendment updates the solicitation to include a new past performance attachment. The opportunity notice indicates the U.S. Army Contracting Command-Redstone Arsenal intends to release a request for proposal for a single-source hybrid firm-fixed-price and cost-type contract for full-rate production of Hydra-70 rocket system hardware and engineering services. The five-year contract would provide rockets, warheads, containers, packaging, and engineering support to maintain capability for the Hydra-70 family of 2.75-inch unguided rockets used on Army, Marine, Navy, Air Force, and foreign military aircraft. The opportunity is restricted to National Technology and Industrial Base companies and involves the Hydra-70 Mark 66 Mod 4 rocket motor and various Mark rockets, warheads, and components.

W31P4Q-17-R-0046 Amendment 0002; Incorporation of Attachment 0030-Past Performance Cover Letter and Questionnaire

View the file

Other files

File Type Posted
W31P4Q-17-R-0046_0004.pdf PDF
Copy_of_Attach_0031_Solicitation_Questions_and_Answers_110218.xlsx XLSX spreadsheet
W31P4Q-17-R-0046_0003.pdf PDF
Consolidated_W31P4Q17R0046_Amendment_0004.pdf PDF
Attach_0004_TDPListing_26Apr2018.pdf PDF
Attach_0031_Solicitaion_Questions_and_Answers.xlsx XLSX spreadsheet
Attach_0006-_FFP_Hydra_Pricing_Tables_PRICING_181017_PDA.xlsm XLSM spreadsheet
Attach_0028-_FFP_Hydra_Production_DO_Pricing_PRICING_181025_PDA_R-1.xlsm XLSM spreadsheet
W31P4Q-17-R-0046_Consolidated_Amendment_0003.pdf PDF
Attachment_0025-_Total_Evaluated_Price_Template_PRICING_181025_R-1.xlsm XLSM spreadsheet
W31P4Q17R0046_Consolidated_through_Amend_0002.pdf PDF
Attach_0030_Past_Performance_Cover_and_Questionnaire_26Sep2018.pdf PDF
Attach_0013_Work_Breakdown_Structure-Cost_and_Software_Data_Report_Plan_31Jan2018.pdf PDF
ExhibitA_CDRL-Production_7Jun2018.PDF PDF
Attach_0012_Changes_and_Verification_Request_31Jan18.pdf PDF
Attach_0020_MK_706_Mod_0_Shipping_Container_Acceptance_Criteria_01Dec2016.pdf PDF
Attach_0004_Technical_Data_Package_Listing_(TDPL)_31Jan2018.pdf PDF
W31P4Q-17-R-0046.pdf PDF
ExhibitB_CDRL-_Engineering_Services_13Sept2018.pdf PDF
Attach_0016__TDPL_for_CFM_Grain_19Apr2018.pdf PDF
Attach_0006_FFP_Hydra_Pricing_Tables_14Sep2018.xlsm XLSM spreadsheet
Attach_0021_PA150-PA151_Refurb_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0011_AT-OPSEC_Cover_and_DD254_26Jan2017.pdf PDF
Attach_0027_Delivery_Scenario_13Mar2018.xls XLS spreadsheet
W31P4Q-17-R-0046_Consolidated_with_Amendment_0001.pdf PDF
Attach_0008__GFP-GFM_Listing_6Aug2018.pdf PDF
Attach_0028_FFP_Hydra_Production_DO_Pricing_14Sep2018.xlsm XLSM spreadsheet
Attach_0023_JAMS_Parts_Management_Plan_(PMP)_31Jan2018.pdf PDF
Attach_0022_M643_Refurb_Acceptance_Criteria_16Apr2018.pdf PDF
Attach_0017_ARGSM_System_Risk_Management_Plan_31Jan2018.pdf PDF
Attach_0024_Skill_Classification_Crosswalk_28Dec2017.xlsx XLSX spreadsheet
Attach_0025_Total_Evaluated_Price_Template_17Sep2018.xlsm XLSM spreadsheet
Attach_0003_SOW_18Sept2018.pdf PDF
Attach_0001_DocSummaryList_13Sept2018.pdf PDF
Attach_0007_CPFF_Hydra_Labor_Rate_Tables_15Aug2018.xlsx XLSX spreadsheet
Attach_0009_Hazardous_Material_31Jan2018.pdf PDF
W31P4Q-17-R-0046-Amendment_0001.pdf PDF
Attach_0026_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist_27Feb2018.pdf PDF
Attach_0029_CAGE_Code_and_DCMA-DCAA_Information_15Aug2018.xlsx XLSX spreadsheet
Attach_0005_Hazard_Classification_31Jan2018.pdf PDF
Attach_0010_MK2_Mod_0_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0019_Quality_Assurance_Surveillance_Plan_08Nov2017.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2018SEP27

W31P4Q

ARMY CONTRACTING COMMAND-REDSTONE

REDSTONE ARSENAL AL 35898-5280

SAMANTHA M. SCHRIMSHER

EMAIL: SAMANTHA.M.SCHRIMSHER.CIV@MAIL.MIL

W31P4Q-17-R-0046

2018SEP21

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 3

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: SAMANTHA M. SCHRIMSHER

Buyer Office Symbol/Telephone Number: CCAM-TMH/(256)842-3769

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost Plus Fixed Fee

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1 THE PURPOSE OF THIS SOLICITATION W31P4Q-17-R-0046, AMENDMENT 002, IS TO UPDATE SECTION J.

A-2 ATTACHMENT 0030, PAST PERFORMANCE COVER AND QUESTIONNAIRE, DATED 26 SEPTEMBER 2018, IS HEREBY INCORPORATED.

*** END OF NARRATIVE A0003 ***

2 3

W31P4Q-17-R-0046

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0030 PAST PERFORMANCE COVER AND QUESTIONNAIRE 26-SEP-2018 005

3 3

W31P4Q-17-R-0046

SECTION A
SECTION J

File details come from the government source that posted it. Updated .