Attach_0012_Changes_and_Verification_Request_31Jan18.pdf

PDF 37 KB Posted

Attached to
Hydra-70 Rocket System Production and Engineering Services
Solicitation number
W31P4Q-17-R-0046
Issued by

About this file

This document outlines changes required for a federal contract for rocket system production and engineering services. The contract seeks to procure the Hydra-70 Rocket System including MK 66 MOD 4 Rocket Motors, M151, M229, M255A1, M255A2, M274, MK149, M257, M278, M156, and M282 Rockets and Warheads. Engineering services will provide program management, engineering, safety, configuration management, testing, production support and administrative efforts to maintain the capability of the Hydra-70 Rocket System and its variants. The Hydra-70 Rocket System provides close air support to ground forces and fills roles against a variety of targets. The federal agency is the Department of the Army Materiel Command Aviation and Missile Life Cycle Management Command.

Attachment 0012 Changes and Verification Request

View the file

Other files

File Type Posted
W31P4Q-17-R-0046_0004.pdf PDF
Consolidated_W31P4Q17R0046_Amendment_0004.pdf PDF
Copy_of_Attach_0031_Solicitation_Questions_and_Answers_110218.xlsx XLSX spreadsheet
W31P4Q-17-R-0046_0003.pdf PDF
Attach_0004_TDPListing_26Apr2018.pdf PDF
Attach_0028-_FFP_Hydra_Production_DO_Pricing_PRICING_181025_PDA_R-1.xlsm XLSM spreadsheet
Attach_0006-_FFP_Hydra_Pricing_Tables_PRICING_181017_PDA.xlsm XLSM spreadsheet
Attachment_0025-_Total_Evaluated_Price_Template_PRICING_181025_R-1.xlsm XLSM spreadsheet
W31P4Q-17-R-0046_Consolidated_Amendment_0003.pdf PDF
Attach_0031_Solicitaion_Questions_and_Answers.xlsx XLSX spreadsheet
W31P4Q17R0046-0002.pdf PDF
W31P4Q17R0046_Consolidated_through_Amend_0002.pdf PDF
Attach_0030_Past_Performance_Cover_and_Questionnaire_26Sep2018.pdf PDF
Attach_0009_Hazardous_Material_31Jan2018.pdf PDF
Attach_0008__GFP-GFM_Listing_6Aug2018.pdf PDF
Attach_0003_SOW_18Sept2018.pdf PDF
Attach_0007_CPFF_Hydra_Labor_Rate_Tables_15Aug2018.xlsx XLSX spreadsheet
Attach_0028_FFP_Hydra_Production_DO_Pricing_14Sep2018.xlsm XLSM spreadsheet
Attach_0024_Skill_Classification_Crosswalk_28Dec2017.xlsx XLSX spreadsheet
Attach_0017_ARGSM_System_Risk_Management_Plan_31Jan2018.pdf PDF
Attach_0019_Quality_Assurance_Surveillance_Plan_08Nov2017.pdf PDF
Attach_0010_MK2_Mod_0_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0005_Hazard_Classification_31Jan2018.pdf PDF
Attach_0013_Work_Breakdown_Structure-Cost_and_Software_Data_Report_Plan_31Jan2018.pdf PDF
Attach_0022_M643_Refurb_Acceptance_Criteria_16Apr2018.pdf PDF
Attach_0001_DocSummaryList_13Sept2018.pdf PDF
Attach_0025_Total_Evaluated_Price_Template_17Sep2018.xlsm XLSM spreadsheet
Attach_0020_MK_706_Mod_0_Shipping_Container_Acceptance_Criteria_01Dec2016.pdf PDF
ExhibitB_CDRL-_Engineering_Services_13Sept2018.pdf PDF
Attach_0016__TDPL_for_CFM_Grain_19Apr2018.pdf PDF
Attach_0029_CAGE_Code_and_DCMA-DCAA_Information_15Aug2018.xlsx XLSX spreadsheet
ExhibitA_CDRL-Production_7Jun2018.PDF PDF
W31P4Q-17-R-0046.pdf PDF
Attach_0004_Technical_Data_Package_Listing_(TDPL)_31Jan2018.pdf PDF
Attach_0006_FFP_Hydra_Pricing_Tables_14Sep2018.xlsm XLSM spreadsheet
Attach_0023_JAMS_Parts_Management_Plan_(PMP)_31Jan2018.pdf PDF
Attach_0011_AT-OPSEC_Cover_and_DD254_26Jan2017.pdf PDF
W31P4Q-17-R-0046_Consolidated_with_Amendment_0001.pdf PDF
W31P4Q-17-R-0046-Amendment_0001.pdf PDF
Attach_0021_PA150-PA151_Refurb_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0027_Delivery_Scenario_13Mar2018.xls XLS spreadsheet
Attach_0026_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist_27Feb2018.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12 CHANGES and VERIFICATION REQUIRED

Number Description of Changes

R e q u a li fi c a ti o n

(S O

W

.2 .1

F ir s t

A rt ic le

T e s t

(S O

W

.2 .1

T a il o re d

F A

T

S O

W

.2 .1

F ir s t

P ie c e I n s p e c ti o n

(S O

W

.2 .2

In te rn a l V a li d a ti o n

S

O W

.2

.3

100 Design Changes

101 Design changes X

102 Changes to physical features, raw materials or dimensions that may affect fit, form or function of hardware X X

Changes that affect items requiring outside agency involvement (i.e. Navy Weapon System

Explosive Safety Review Board (WSESRB), Army Fuze Board, etc.)

X X

200 Changes to Manufacturing Facility

Relocation of any equipment, tooling, or test/inspecion equipment, etc. used to manufacture deliverable hardware within same building, or relocation on same or other property.

X X X

202 Out of production for a period exceeding 12 months (See Note A Below) X X

Maintenance: Dismantling manufacturing equipment and/or acceptance test/inspection equipment that may affect fit, form or function of manufactured hardware.

X X

300 Changes to Manufacturing Processes

301 Change to manufacturing processes or Tooling that may affect fit, form, or function. X X

302 Changes to casting and press molds that do not impact form, fit or function. X

303 Preventive maintenance X

400 Changes to Material or Supply of Material

401 Change in suppliers or materials for manufacture, inspection/test and/or acceptance of hardware/software or materials X X

500 Changes Not Listed within Attachment 12. JAMS will determine the level of validation.

Notes:

A. If the supplier has not manufactured and delivered the item in question within the past 12 months, then that item will require a revalidation of manufacturing processes, etc. JAMS may waive the out of production revalidation requirement pending complexity and criticality of the item.

B. The level of validation identified will be agreed upon between the contractor and JAMS; in the event an agreement is not achieved, JAMS will determine the level of validation. JAMS may minimize the level of verification or may not require verification of some changes. Any undocumented changes that may affect fit, form or function not listed above shall be discussed with the applicable IPT and the level of validation will be determined by JAMS.

W31P4Q-19-X-XXXX

Attachment #0012

31 January 2018

File details come from the government source that posted it. Updated .