This document outlines changes required for a federal contract for rocket system production and engineering services. The contract seeks to procure the Hydra-70 Rocket System including MK 66 MOD 4 Rocket Motors, M151, M229, M255A1, M255A2, M274, MK149, M257, M278, M156, and M282 Rockets and Warheads. Engineering services will provide program management, engineering, safety, configuration management, testing, production support and administrative efforts to maintain the capability of the Hydra-70 Rocket System and its variants. The Hydra-70 Rocket System provides close air support to ground forces and fills roles against a variety of targets. The federal agency is the Department of the Army Materiel Command Aviation and Missile Life Cycle Management Command.
Attachment 0012 Changes and Verification Request
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 12 CHANGES and VERIFICATION REQUIRED
Number Description of Changes
R e q u a li fi c a ti o n
(S O
W
.2 .1
F ir s t
A rt ic le
T e s t
(S O
W
.2 .1
T a il o re d
F A
T
S O
W
.2 .1
F ir s t
P ie c e I n s p e c ti o n
(S O
W
.2 .2
In te rn a l V a li d a ti o n
S
O W
.2
.3
100 Design Changes
101 Design changes X
102 Changes to physical features, raw materials or dimensions that may affect fit, form or function of hardware X X
Changes that affect items requiring outside agency involvement (i.e. Navy Weapon System
Explosive Safety Review Board (WSESRB), Army Fuze Board, etc.)
X X
200 Changes to Manufacturing Facility
Relocation of any equipment, tooling, or test/inspecion equipment, etc. used to manufacture deliverable hardware within same building, or relocation on same or other property.
X X X
202 Out of production for a period exceeding 12 months (See Note A Below) X X
Maintenance: Dismantling manufacturing equipment and/or acceptance test/inspection equipment that may affect fit, form or function of manufactured hardware.
X X
300 Changes to Manufacturing Processes
301 Change to manufacturing processes or Tooling that may affect fit, form, or function. X X
302 Changes to casting and press molds that do not impact form, fit or function. X
303 Preventive maintenance X
400 Changes to Material or Supply of Material
401 Change in suppliers or materials for manufacture, inspection/test and/or acceptance of hardware/software or materials X X
500 Changes Not Listed within Attachment 12. JAMS will determine the level of validation.
Notes:
A. If the supplier has not manufactured and delivered the item in question within the past 12 months, then that item will require a revalidation of manufacturing processes, etc. JAMS may waive the out of production revalidation requirement pending complexity and criticality of the item.
B. The level of validation identified will be agreed upon between the contractor and JAMS; in the event an agreement is not achieved, JAMS will determine the level of validation. JAMS may minimize the level of verification or may not require verification of some changes. Any undocumented changes that may affect fit, form or function not listed above shall be discussed with the applicable IPT and the level of validation will be determined by JAMS.