Attach_0020_MK_706_Mod_0_Shipping_Container_Acceptance_Criteria_01Dec2016.pdf

PDF 524 KB Posted

Attached to
Hydra-70 Rocket System Production and Engineering Services
Solicitation number
W31P4Q-17-R-0046
Issued by

About this file

This document provides acceptance criteria for the MK 706 Mod 0 Shipping Container to be used for the Hydra-70 Rocket System Production and Engineering Services contract. The U.S. Army Contracting Command-Redstone Arsenal anticipates releasing an RFP for the Hydra-70 Rocket System, which includes MK 66 MOD 4 Rocket Motors, various rocket and warhead models, containers, packaging, and engineering services to maintain the system through 2023. The engineering services will provide program management, engineering, safety, configuration management, testing and evaluation, production support, and administrative services. The Hydra-70 Rocket System is used by the U.S. Army, Marines, Navy, Air Force and foreign militaries on rotary and fixed wing aircraft for close air support, anti-materiel, anti-personnel and suppression missions.

Attachment 0020 MK 706 Mod 0 Shipping Container Acceptance Criteria

View the file

Other files

File Type Posted
W31P4Q-17-R-0046_0004.pdf PDF
Copy_of_Attach_0031_Solicitation_Questions_and_Answers_110218.xlsx XLSX spreadsheet
W31P4Q-17-R-0046_0003.pdf PDF
Consolidated_W31P4Q17R0046_Amendment_0004.pdf PDF
Attach_0004_TDPListing_26Apr2018.pdf PDF
Attach_0031_Solicitaion_Questions_and_Answers.xlsx XLSX spreadsheet
Attach_0006-_FFP_Hydra_Pricing_Tables_PRICING_181017_PDA.xlsm XLSM spreadsheet
Attach_0028-_FFP_Hydra_Production_DO_Pricing_PRICING_181025_PDA_R-1.xlsm XLSM spreadsheet
W31P4Q-17-R-0046_Consolidated_Amendment_0003.pdf PDF
Attachment_0025-_Total_Evaluated_Price_Template_PRICING_181025_R-1.xlsm XLSM spreadsheet
W31P4Q17R0046_Consolidated_through_Amend_0002.pdf PDF
Attach_0030_Past_Performance_Cover_and_Questionnaire_26Sep2018.pdf PDF
W31P4Q17R0046-0002.pdf PDF
Attach_0013_Work_Breakdown_Structure-Cost_and_Software_Data_Report_Plan_31Jan2018.pdf PDF
ExhibitA_CDRL-Production_7Jun2018.PDF PDF
Attach_0012_Changes_and_Verification_Request_31Jan18.pdf PDF
Attach_0004_Technical_Data_Package_Listing_(TDPL)_31Jan2018.pdf PDF
W31P4Q-17-R-0046.pdf PDF
ExhibitB_CDRL-_Engineering_Services_13Sept2018.pdf PDF
Attach_0016__TDPL_for_CFM_Grain_19Apr2018.pdf PDF
Attach_0006_FFP_Hydra_Pricing_Tables_14Sep2018.xlsm XLSM spreadsheet
Attach_0021_PA150-PA151_Refurb_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0011_AT-OPSEC_Cover_and_DD254_26Jan2017.pdf PDF
Attach_0027_Delivery_Scenario_13Mar2018.xls XLS spreadsheet
W31P4Q-17-R-0046_Consolidated_with_Amendment_0001.pdf PDF
Attach_0008__GFP-GFM_Listing_6Aug2018.pdf PDF
Attach_0028_FFP_Hydra_Production_DO_Pricing_14Sep2018.xlsm XLSM spreadsheet
Attach_0023_JAMS_Parts_Management_Plan_(PMP)_31Jan2018.pdf PDF
Attach_0022_M643_Refurb_Acceptance_Criteria_16Apr2018.pdf PDF
Attach_0017_ARGSM_System_Risk_Management_Plan_31Jan2018.pdf PDF
Attach_0024_Skill_Classification_Crosswalk_28Dec2017.xlsx XLSX spreadsheet
Attach_0025_Total_Evaluated_Price_Template_17Sep2018.xlsm XLSM spreadsheet
Attach_0003_SOW_18Sept2018.pdf PDF
Attach_0001_DocSummaryList_13Sept2018.pdf PDF
Attach_0007_CPFF_Hydra_Labor_Rate_Tables_15Aug2018.xlsx XLSX spreadsheet
Attach_0009_Hazardous_Material_31Jan2018.pdf PDF
W31P4Q-17-R-0046-Amendment_0001.pdf PDF
Attach_0026_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist_27Feb2018.pdf PDF
Attach_0029_CAGE_Code_and_DCMA-DCAA_Information_15Aug2018.xlsx XLSX spreadsheet
Attach_0005_Hazard_Classification_31Jan2018.pdf PDF
Attach_0010_MK2_Mod_0_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0019_Quality_Assurance_Surveillance_Plan_08Nov2017.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MK 706 MOD 0 SHIPPING CONTAINER

ACCEPTANCE CRITERIA

NSWC IHEODTD

DWG. 233AS600-233AS622

1 December 2016

PREPARED BY:

SYSTEMS ENGINEERING DEPARTMENT

AIR SYSTEMS BRANCH, CODE E11

INDIAN HEAD, MD 20640-5035

DISTRIBUTION C. Distribution authorized to U.S. Government Agencies and their contractors. Administrative or Operational Use, 1 Dec. 2016.

Other request for this document shall be referred to Commander, NSWC IHEODTD.

2 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only

1 Dec. 2016

1. PURPOSE

1.1 To provide acceptance criteria guidelines for the MK 706 Mod 0 Shipping

Container.

2. INSPECTION GUIDELINES

2.1 The MK 706 containers shall have been painted and shall also have

Performance Oriented Packaging (POP) marking and the warning

'REUSABLE CONTAINER – DO NOT DESTROY' applied to them in accordance with NAVAIR 233AS622. The Contractor shall also be responsible for assuring that the loaded containers meet the other marking requirements of NAVAIR 233AS600.

2.2 Likewise, the project engineer or designated alternate shall visually inspect the MK 706 MOD 0 Shipping Containers against the following guidelines:

Table 1. Accept/Reject Guidelines for MK 706 MOD 0 Shipping Containers

ACCEPT REJECT

1. Accept minor paint chips/scuffs not exposing bare metal (see Figure 1), except as defined below.

2. Bare metal exposure on MK 706 containers shall be allowed after motor pack-out and prior to shipping as long as it does not exceed one (1) square inch per occurrence and ten (10) square inches cumulative.

3. Accept dents (see Figure 3) in the thin-wall section of the Body Tube, e.g., within 37 inches from the Top’s stacking lugs, only if the inner diameter is greater than or equal to 3.109 inches. Inspection can be accomplished by inserting a calibrated diameter inspection cylinder

(length: 6 inches min.) machined to an outside diameter of 3.109 ± 0.005 inches.

1. Reject unit if major paint damage is exposing bare metal exceeding one (1) square inch per occurrence and ten (10) square inches cumulative (see Figure 2).

2. Reject unit if major Body Tube damage is impeding insertion of Rocket Motors.

3. Reject unit if a dent is in the thick-wall section of the Body Tube, e.g., within 6 inches from the bottom of the Base (see

Figure 4).

4. Reject unit if the inner diameter of the Body

Tube’s thin-wall section is less than 3.109 inches. Inspection can be accomplished by inserting a calibrated diameter inspection cylinder (length: 6 inches min.) machined to an outside diameter of 3.109 ± 0.005 inches.

3 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only

5. Reject unit if stencil markings are illegible

(see Figure 6).

6. Reject unit if Cover Assembly is missing

Gaskets, Buffers or Spacers (see Figure 7).

Likewise, reject for any discontinuity or deformity in the Gaskets.

7. Reject unit if Base is missing Buffers or

Acryl ic Spacers.

8. Reject unit if Cover Assembly is damaged or missing hardware.

9. Reject unit if there are holes or punctures in

Body Tubes.

10. Reject unit if stack-ability of containers is affected by:

a) Damaged stacking lugs, or

b) Top and Base surfaces are out of alignment, e.g., not on the same plane, crooked.

11. Body Tubes must be tight between Top and

Base; reject unit if Body Tubes can be turned by hand.

12. Reject unit if rivets (4 places) are missing on

Body Assembly’s Base.

4. Accept double stencil markings (see

Figure 5).

5. Accept some discoloration, dried water spots, and longitudinal deep scratches inside the Body Tubes.

Stains, light film of fine grit and/or trace amounts of tape stuck to the inner tube walls are also acceptable.

6. Accept if Buffers or Acrylic Spacers at the closed end have adhesive and/or small pieces of foreign material stuck to the adhesive around the edges.

7. Accept if Buffers are stained or discolored.

8. Accept covers with paint over-spray on the Gasket, Buffer and Acrylic

Spacer surfaces.

9. Accept if covers do not contain any paint on the underside of the cover.

10. Accept containers containing spots of white powdery residue on the exterior; the Contractor shall wipe the residue off the area to be stenciled prior to stenciling new markings.

11. Accept containers with bare metal exposure in the lug stacking area (as a result of typical shipping and handling damage) provided that no single instance is greater than one (1) square inch (see Figure 8).

12. Ensure that there is no excessive foreign material inside the Body

Tubes, e.g., less than 100 sand particles is acceptable.

4 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only

APPENDIX A

Figure 1. Minor Paint Damage (ACCEPT)

Figure 2. Major Paint Damage Exposing Bare Metal (REJECT*)

*Note: Bare metal exposure on MK 706 containers shall be allowed after motor pack-out and prior to shipping as long as it does not exceed one (1) square inch per occurrence and ten (10) square inches cumulative.

Figure 3. Minor Body Tube Damage (ACCEPT)

5 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only

Figure 4. Major Body Tube Damage (REJECT)

Figure 5. Double Stencil Markings (ACCEPT)

Figure 6. Illegible Stencil Markings (REJECT)

6 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only

Figure 7. Cover Plate with Missing Buffers/Acrylic Spacers (REJECT)

Figure 8. Bare Metal in Lug Stacking Area (ACCEPT)