This document provides acceptance criteria for the MK 706 Mod 0 Shipping Container to be used for the Hydra-70 Rocket System Production and Engineering Services contract. The U.S. Army Contracting Command-Redstone Arsenal anticipates releasing an RFP for the Hydra-70 Rocket System, which includes MK 66 MOD 4 Rocket Motors, various rocket and warhead models, containers, packaging, and engineering services to maintain the system through 2023. The engineering services will provide program management, engineering, safety, configuration management, testing and evaluation, production support, and administrative services. The Hydra-70 Rocket System is used by the U.S. Army, Marines, Navy, Air Force and foreign militaries on rotary and fixed wing aircraft for close air support, anti-materiel, anti-personnel and suppression missions.
Attachment 0020 MK 706 Mod 0 Shipping Container Acceptance Criteria
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MK 706 MOD 0 SHIPPING CONTAINER
ACCEPTANCE CRITERIA
NSWC IHEODTD
DWG. 233AS600-233AS622
1 December 2016
PREPARED BY:
SYSTEMS ENGINEERING DEPARTMENT
AIR SYSTEMS BRANCH, CODE E11
INDIAN HEAD, MD 20640-5035
DISTRIBUTION C. Distribution authorized to U.S. Government Agencies and their contractors. Administrative or Operational Use, 1 Dec. 2016.
Other request for this document shall be referred to Commander, NSWC IHEODTD.
2 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only
1 Dec. 2016
1. PURPOSE
1.1 To provide acceptance criteria guidelines for the MK 706 Mod 0 Shipping
Container.
2. INSPECTION GUIDELINES
2.1 The MK 706 containers shall have been painted and shall also have
Performance Oriented Packaging (POP) marking and the warning
'REUSABLE CONTAINER – DO NOT DESTROY' applied to them in accordance with NAVAIR 233AS622. The Contractor shall also be responsible for assuring that the loaded containers meet the other marking requirements of NAVAIR 233AS600.
2.2 Likewise, the project engineer or designated alternate shall visually inspect the MK 706 MOD 0 Shipping Containers against the following guidelines:
Table 1. Accept/Reject Guidelines for MK 706 MOD 0 Shipping Containers
ACCEPT REJECT
1. Accept minor paint chips/scuffs not exposing bare metal (see Figure 1), except as defined below.
2. Bare metal exposure on MK 706 containers shall be allowed after motor pack-out and prior to shipping as long as it does not exceed one (1) square inch per occurrence and ten (10) square inches cumulative.
3. Accept dents (see Figure 3) in the thin-wall section of the Body Tube, e.g., within 37 inches from the Top’s stacking lugs, only if the inner diameter is greater than or equal to 3.109 inches. Inspection can be accomplished by inserting a calibrated diameter inspection cylinder
(length: 6 inches min.) machined to an outside diameter of 3.109 ± 0.005 inches.
1. Reject unit if major paint damage is exposing bare metal exceeding one (1) square inch per occurrence and ten (10) square inches cumulative (see Figure 2).
2. Reject unit if major Body Tube damage is impeding insertion of Rocket Motors.
3. Reject unit if a dent is in the thick-wall section of the Body Tube, e.g., within 6 inches from the bottom of the Base (see
Figure 4).
4. Reject unit if the inner diameter of the Body
Tube’s thin-wall section is less than 3.109 inches. Inspection can be accomplished by inserting a calibrated diameter inspection cylinder (length: 6 inches min.) machined to an outside diameter of 3.109 ± 0.005 inches.
3 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only
5. Reject unit if stencil markings are illegible
(see Figure 6).
6. Reject unit if Cover Assembly is missing
Gaskets, Buffers or Spacers (see Figure 7).
Likewise, reject for any discontinuity or deformity in the Gaskets.
7. Reject unit if Base is missing Buffers or
Acryl ic Spacers.
8. Reject unit if Cover Assembly is damaged or missing hardware.
9. Reject unit if there are holes or punctures in
Body Tubes.
10. Reject unit if stack-ability of containers is affected by:
a) Damaged stacking lugs, or
b) Top and Base surfaces are out of alignment, e.g., not on the same plane, crooked.
11. Body Tubes must be tight between Top and
Base; reject unit if Body Tubes can be turned by hand.
12. Reject unit if rivets (4 places) are missing on
Body Assembly’s Base.
4. Accept double stencil markings (see
Figure 5).
5. Accept some discoloration, dried water spots, and longitudinal deep scratches inside the Body Tubes.
Stains, light film of fine grit and/or trace amounts of tape stuck to the inner tube walls are also acceptable.
6. Accept if Buffers or Acrylic Spacers at the closed end have adhesive and/or small pieces of foreign material stuck to the adhesive around the edges.
7. Accept if Buffers are stained or discolored.
8. Accept covers with paint over-spray on the Gasket, Buffer and Acrylic
Spacer surfaces.
9. Accept if covers do not contain any paint on the underside of the cover.
10. Accept containers containing spots of white powdery residue on the exterior; the Contractor shall wipe the residue off the area to be stenciled prior to stenciling new markings.
11. Accept containers with bare metal exposure in the lug stacking area (as a result of typical shipping and handling damage) provided that no single instance is greater than one (1) square inch (see Figure 8).
12. Ensure that there is no excessive foreign material inside the Body
Tubes, e.g., less than 100 sand particles is acceptable.
4 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only
APPENDIX A
Figure 1. Minor Paint Damage (ACCEPT)
Figure 2. Major Paint Damage Exposing Bare Metal (REJECT*)
*Note: Bare metal exposure on MK 706 containers shall be allowed after motor pack-out and prior to shipping as long as it does not exceed one (1) square inch per occurrence and ten (10) square inches cumulative.
Figure 3. Minor Body Tube Damage (ACCEPT)
5 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only
Figure 4. Major Body Tube Damage (REJECT)
Figure 5. Double Stencil Markings (ACCEPT)
Figure 6. Illegible Stencil Markings (REJECT)
6 DISTRIBUTION STATEMENT C, U.S. Government Agencies & Contractors Only
Figure 7. Cover Plate with Missing Buffers/Acrylic Spacers (REJECT)
Figure 8. Bare Metal in Lug Stacking Area (ACCEPT)