Attach_0008__GFP-GFM_Listing_6Aug2018.pdf
PDF 51 KB Posted
- Solicitation number
- W31P4Q-17-R-0046
About this file
This document contains a listing of government furnished property and materials as well as details of a federal contract opportunity for the Hydra-70 Rocket System. The listing includes five items of government furnished property located at the Radford Army Ammunition Plant, including two GFP grain in process defect X-Ray machines, ten GFP end state buggies, one GFP bar code reader upgrade, and up to 120,000 Mk90 grains and 9,999 WGU-59B guidance sections to be provided per fiscal year. The federal contract opportunity is for the Hydra-70 Rocket System full rate production hardware and engineering services with an anticipated award of a single-source hybrid firm-fixed-price and cost type five-year IDIQ contract. The contract will provide Hydra-70 Rocket System production including MK66 MOD 4, M151, M229, M255A1, M255A2, M274, MK149, M257, M278, M156, M264, and M282 rockets and warheads as well as AGR-20C containers, packaging, and engineering services to maintain system capability.
Attachment 0008 GFPGFM Listing
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W31P4Q-19-X-XXXX
Attachment 0008 06 Aug 2018
ITEM DESCRIPTION QTY MFR/MODEL# LOCATION
1 GFP UT MACHINES MK90 Grain in Process Defect X-Ray 2 each
UT-1-49125-50100
UT-2-49126-30100 Radford Army Ammunition Plan (Radford, VA)
2 GFP END STATE BUGGIES MK90 End Sleeve Process Cart/Buggy 10 each DWG 51478-Mfg by ATK Radford Army Ammunition Plan (Radford, VA)
3 GFP BAR CODE READER UPGRADE
MK90 Identification Bar Code Scanner/Upgrade 1 each
Motorola-Bartec MC9090ex UL CI 1 Div 1, Gun Style, Imager Part #17-A129- 0GK0HJAFA600 Radford Army Ammunition Plan (Radford, VA)
4 GFM MK90 Grain Mk90 Grain provided as GFM Up to 120,000 Mk90 Grains per FY Order
P/N 233AS106
Lot numbering IAW MIL-STD- 1168B
A final delivery schedule for GFM shall be negotiated and mutually agreed to by the contractor and the Government prior to the first scheduled delivery date for grain. The Contractor shall provide a production schedule that includes need dates for the GFM grains so that the Government and contractor can come to agreement on a GFM grain delivery schedule. If an agreement cannot be reached, the Government will establish the final delivery schedule.
5 GFM Guidance Section, WGU-59B WGU-59B Guidance Section (Serialized) in CNU-711 container Up to 9,999 per FY Order P/N 13722927
GFM Guidance Sections, WGU-59B, will be provided by the Government to the Contractors Specified Load Assembly Pack Facility NLT 60 days before contract delivery unless mutually agreed to bythe contractor and the Government.
GFM M156 Head and Casing Assemblies (HACAs) M156 Head and Casing Assemblies Up to 40,000 per order P/N D90-1-43
A final delivery schedule for CFM and GFM shall be negotiated and mutually agreed to by the contractor and the Government prior to the first scheduled delivery date for M156 Rockets and Warheads under this contract. If agreement cannot be reached, the Government will establish a final delivery schedule.
Government Furnished Property/Government Furnished Material Special Tooling and Special Test Equipment
File details come from the government source that posted it. Updated .