Attach_0001_DocSummaryList_13Sept2018.pdf

PDF 445 KB Posted

Attached to
Hydra-70 Rocket System Production and Engineering Services
Solicitation number
W31P4Q-17-R-0046
Issued by

About this file

This document summary list provides the data item descriptions and regulatory documents relevant to solicitation number W31P4Q-17-R-0046 for Hydra-70 Rocket System production and engineering services. Key requirements include the procurement of Hydra-70 Rocket System munitions such as the MK 66 MOD 4 Rocket Motor, M151, M229, M255A1, M255A2, M274, MK149, M257, M278, M156, M264, and M282 Rockets and warheads. Engineering services will provide program management, engineering, safety, configuration management, testing, production support, and administration to maintain the capability of the Hydra-70 Rocket System and its variants. The U.S. Army Contracting Command-Redstone Arsenal intends to award a single-source hybrid firm-fixed-price and cost-type five-year contract to a member of the National Technology and Industrial Base.

Attachment 0001 Document Summary List

View the file

Other files

File Type Posted
W31P4Q-17-R-0046_0004.pdf PDF
Copy_of_Attach_0031_Solicitation_Questions_and_Answers_110218.xlsx XLSX spreadsheet
W31P4Q-17-R-0046_0003.pdf PDF
Attach_0004_TDPListing_26Apr2018.pdf PDF
Consolidated_W31P4Q17R0046_Amendment_0004.pdf PDF
Attach_0028-_FFP_Hydra_Production_DO_Pricing_PRICING_181025_PDA_R-1.xlsm XLSM spreadsheet
Attach_0006-_FFP_Hydra_Pricing_Tables_PRICING_181017_PDA.xlsm XLSM spreadsheet
Attachment_0025-_Total_Evaluated_Price_Template_PRICING_181025_R-1.xlsm XLSM spreadsheet
W31P4Q-17-R-0046_Consolidated_Amendment_0003.pdf PDF
Attach_0031_Solicitaion_Questions_and_Answers.xlsx XLSX spreadsheet
W31P4Q17R0046-0002.pdf PDF
W31P4Q17R0046_Consolidated_through_Amend_0002.pdf PDF
Attach_0030_Past_Performance_Cover_and_Questionnaire_26Sep2018.pdf PDF
Attach_0022_M643_Refurb_Acceptance_Criteria_16Apr2018.pdf PDF
Attach_0025_Total_Evaluated_Price_Template_17Sep2018.xlsm XLSM spreadsheet
Attach_0020_MK_706_Mod_0_Shipping_Container_Acceptance_Criteria_01Dec2016.pdf PDF
ExhibitB_CDRL-_Engineering_Services_13Sept2018.pdf PDF
Attach_0016__TDPL_for_CFM_Grain_19Apr2018.pdf PDF
Attach_0029_CAGE_Code_and_DCMA-DCAA_Information_15Aug2018.xlsx XLSX spreadsheet
ExhibitA_CDRL-Production_7Jun2018.PDF PDF
Attach_0019_Quality_Assurance_Surveillance_Plan_08Nov2017.pdf PDF
Attach_0010_MK2_Mod_0_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0005_Hazard_Classification_31Jan2018.pdf PDF
Attach_0013_Work_Breakdown_Structure-Cost_and_Software_Data_Report_Plan_31Jan2018.pdf PDF
W31P4Q-17-R-0046.pdf PDF
Attach_0004_Technical_Data_Package_Listing_(TDPL)_31Jan2018.pdf PDF
Attach_0006_FFP_Hydra_Pricing_Tables_14Sep2018.xlsm XLSM spreadsheet
Attach_0023_JAMS_Parts_Management_Plan_(PMP)_31Jan2018.pdf PDF
Attach_0011_AT-OPSEC_Cover_and_DD254_26Jan2017.pdf PDF
W31P4Q-17-R-0046_Consolidated_with_Amendment_0001.pdf PDF
W31P4Q-17-R-0046-Amendment_0001.pdf PDF
Attach_0021_PA150-PA151_Refurb_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0027_Delivery_Scenario_13Mar2018.xls XLS spreadsheet
Attach_0026_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist_27Feb2018.pdf PDF
Attach_0009_Hazardous_Material_31Jan2018.pdf PDF
Attach_0008__GFP-GFM_Listing_6Aug2018.pdf PDF
Attach_0003_SOW_18Sept2018.pdf PDF
Attach_0007_CPFF_Hydra_Labor_Rate_Tables_15Aug2018.xlsx XLSX spreadsheet
Attach_0028_FFP_Hydra_Production_DO_Pricing_14Sep2018.xlsm XLSM spreadsheet
Attach_0024_Skill_Classification_Crosswalk_28Dec2017.xlsx XLSX spreadsheet
Attach_0017_ARGSM_System_Risk_Management_Plan_31Jan2018.pdf PDF
Attach_0012_Changes_and_Verification_Request_31Jan18.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31P4Q-19-X-XXXX

Attachment #0001

14 Sept 2018

DOCUMENT SUMMARY LIST (DSL)

CONTRACTORS ARE ENCOURAGED TO OFFER SUGGESTIONS, COMMENTS, OR ALTERNATIVES TO THE

DOCUMENTS CITED HEREIN. TAILORING CATEGORY OF APPLICATION, REVISION LEVELS, AND THE

DOCUMENTS CITED ARE ALL CANDIDATES.

1.0 Definition of Document Categories

l. Category 0 (Cat. 0). The requirements contained in the directly cited document, are not mandatory and are for reference and information only.

2. Category l (Cat. 1). The requirements contained in the directly cited document are contractually applicable to the extent specified. All requirements contained in reference and subsequently referenced documents are contractually for information only, unless otherwise specified in the solicitation, contract, or contract modifications.

3. Category 2 (Cat. 2). The requirements contained in the directly cited document are contractually applicable to the extent specified. All requirements contained in referenced documents are also imposed to the extent specified. All requirements contained in subsequently referenced documents are contractually for information only unless otherwise specified in the solicitation, contract or contract modification.

DD Form l423 Definitions

Block l0, ll, l2, l3: “Submit” means to deliver to the Government as specified in the shipping instructions for data which are located in section F of the contract.

Block l4: Regular/Repro Copies

Regular Copy – Blueline, Blackline, Xerographic (originals of reports, plans, or routine data also fall into this definition).

Repro Copy – Multilith, Vellum, photographic negatives, etc. (Originals of drawings, engineering change proposals

(ECPS), engineering release records (ERRS), technical publications). NOTE: Type of electronic media, e.g., diskette, CD-ROM, may be designated in Block 16.

CONTRACTUAL REQUIREMENTS OF DATA ITEM DESCRIPTION (DID)

DD FORM l664, Block l0 – Preparation Instructions. This block contains the only portion of the DID that represents a contractual requirement imposed on the contractor. All other blocks are for Government use and for reference only.

BLANK PAGE

ALL REFERENCES TO SOURCE DOCUMENTS IN BLOCK 4 OF DATA ITEM DESCRIPTION ARE

USED FOR REFERENCE ONLY.

A. Data Items:

No. Data Item /

Sequence Title

Date /

Category

DI-ADMN-81373

Seq A001

Presentation Material

01 Oct 93

Cat 1

DI-SESS-80255A

Seq A002

Failure Summary and Analysis Report

Corrective Action Plan

19 Dec 14

Cat 1

DI-SAFT-80101C

Seq A003 System Safety Hazard Analysis (SSHA) Report

12 Jun 15

Cat 1

DI-MGMT-81808

Seq A004 Contractor’s Risk Management Plan

21 Apr 10

Cat 1

DI-NDTI-80566A

Seq A005

Test Plan

(First Article Test(FAT) and Tailored First Article Test

(TFAT))

14 Nov 06

Cat 1

DI-SESS-80463D

Seq A006 Engineering Release Record (ERR)

07 Apr 15

Cat 1

DI-MISC-80508B

Seq A007

Technical Report - Study/Services

(Single Point of Failure (SPOF) Management)

14 Nov 06

Cat 1

DI-NDTI-80603A

Seq A008

Test Procedure

(Lot Acceptance Test (LAT))

14 Nov 06

Cat 1

DI-SESS-80639D

Seq A009 Engineering Change Proposal (ECP)

07 Apr 15

Cat 2

DI-SESS-80640D

Seq A010 Request for Variance (RFV)

07 Apr 15

Cat 1

DI-SESS-80642D

Seq A011 Notice of Revision (NOR)

07 Apr 15

Cat 1

DI-NDTI-80809B

Seq A012 Test/Inspection Report (LAT)

24 Jan 97

DI-NDTI-80809B

Seq A013

Test/Inspection Report

(First Article Test (FAT) and Tailored First

Article Test (TFAT))

24 Jan 97

Cat 1

DI-NDTI-80809B

Seq A014 Test/Inspection Report (First Piece Inspection (FPI))

24 Jan 97

Cat 1

DI-MGMT-81861A

Seq A015 (Format 6)

Integrated Program Management Report (IPMR)

Integrated Master Schedule/Plan (IMS/IMP)

16 Sep 15

Cat 1

DI-SESS-80858C

Seq A016 Contractor's Configuration Management Plan

30 Sep 00

Cat 1

DI-SAFT-80970A

Seq A017

Critical Safety Item, Characteristic and Critical

Defect Report

(Critical Item Failure Reporting)

2 Jun 98

Cat 1

DI-SESS-81022D

Seq A018 Configuration Audit Summary Report

07 Apr 15

Cat 1

DI-PACK-81059A

Seq A019 Performance Oriented Packaging Test Report

25 Mar 11

Cat 1

DI-SESS-81253C

Seq A020 Configuration Status Accounting Information

10 Mar 16

Cat 1

DI-SAFT-81299C

Seq A021 Explosive Hazard Classification Data

12 Jun 15

Cat 1

DI-MISC-81397C

Seq A022

Hazardous Materials Management Program

(HMMP) Report

19 Jun 14

Cat 1

DI-MGMT-81398C

Seq A023

Hazardous Materials Management Program

(HMMP) Plan

19 Jun 14

Cat 1

DI-MFFP-81403

Seq A024

Corrosion Prevention and Control Plan

(CPDC Plan)

06 Jun 94

Cat 1

DI-MGMT-81453A

Seq A025 Data Accession List (DAL)

27 Sep 07

Cat 1

DI-MGMT-82164

Seq A026 Quantity Data Report

16 Nov 17

DI-FNCL-82162

Seq A027 Cost and Hour Report (Flex File)

15 Nov 17

Cat 1

DI-SESS-81646B

Seq A028 Configuration Audit Plan

24 Feb 14

Cat 1

DI-FNCL-81765B

Seq A029

Contractor Business Data Report (DD Form 1921-3)

(Contractor Cost and Software Data Reporting

(CSDR))

18 May 11

Cat 1

DI-QCIC-81794

Seq A030 Quality Assurance Program Plan (QAPP)

08 Dec 09

Cat 1

DI-MISC-81832

Seq A031 Counterfeit Prevention Plan

21 Jan 11

Cat 1

DI-MGMT-80061A

Seq B001

Engineering & Technical Services Accomplishment

Report (Program Management Control Report)

28 Mar 91

Cat 1

DI-SAFT-80101C

Seq B002 System Safety Hazard Analysis (SSHA) Report

12 Jun 15

Cat 1

DI-SAFT-80102C

Seq B003 Safety Assessment Report (SAR)

12 Jun 15

Cat 1

DI-SESS-80255A

Seq B004

Failure Summary and Analysis Report (QE &

Reliability Analysis)

19 Dec 14

Cat 1

DI-SESS-81704

Seq B005 Test Plans/Test Procedures

22 Nov 06

Cat 1

DI-AVCS-80700

Seq B006

Computer Software Product End Items (Software and

Firmware Code)

26 Oct 88

Cat 1

DI-NDTI-80809B

Seq B007 Test/Inspection Report

24 Jan 97

Cat 1

DI-FNCL-80912

Seq B008 Performance and Cost Report (PCR)

06 Oct 89

Cat 1

DI-ADMN-80925A

Seq B009

Revisions to Existing Government Documents

(Publications)

14 Apr 17

DI-SESS-81000E

Seq B010 Product Drawings/Models and Associated Lists

26 Feb 13

Cat 1

DI-PACK-81059A

Seq B011 Performance Oriented Packaging (POP) Test Report

25 Mar 11

Cat 1

DI-SAFT-81299C

Seq B012 Explosive Hazard Classification Data

12 Jun 15

Cat 1

DI-SESS-80255A

Seq B013

Failure Analysis and Corrective Action Report

(Preliminary Report)

19 Dec 14

Cat 1

DI-SESS-80255A

Seq B014

Failure Analysis and Corrective Action Report (Final

Report)

19 Dec 14

Cat 1

DI-IPSC-81433A

Seq B015

Software Requirements Specifications (SRS)

(Software/Firmware Requirements)

15 Dec 99

Cat 1

DI-IPSC-81435A

Seq B016

Software Design Description (SDD)

(Software/Firmware Design Description)

15 Dec 99

Cat 1

DI-IPSC-81438A

Seq B017

Software Test Plans (STP) (Software/Firmware Test

Plans)

15 Dec 99

Cat 1

DI-IPSC-81439A

Seq B018

Software Test Description (STD) (Software/Firmware

Test Description)

15 Dec 99

Cat 1

DI-IPSC-81440A

Seq B019

Software Test Report (STR) (Software/Firmware Test

Report)

15 Dec 99

Cat 1

DI-IPSC-81441A

Seq B020

Software Product Specification (SPS)

(Software/Firmware Product Specification)

15 Dec 99

Cat 1

DI-IPSC-81442A

Seq B021

Software Version Description (SVD)

(Software/Firmware Version Description)

15 Dec 99

Cat 1

DI-SDMP-81493A

Seq B022

Program Unique Specification Documents

(Performance Based Product/Process Specification)

01 Aug 03

Cat 1

DI-MISC-80711A

Seq B023

Scientific and Technical Reports (Safety Technical

Data)

21 Jan 00

DI-MGMT-81605

Seq B024 Briefing Material (Safety Briefing Material)

15 Feb 01

Cat 1

DI-MISC-80711A

Seq B025

Scientific and Technical Reports (Technical Data

Material)

21 Jan 00

Cat 1

DI-MISC-80711A

Seq B026

Scientific and Technical Reports (Performance Trends and Corrective Actions)

21 Jan 00

Cat 1

DI-MISC-80711A

Seq B027

Scientific and Technical Reports (Design Review

Material)

21 Jan 00

Cat 1

DI-MGMT-81605

Seq B028 Briefing Material (Technical Review Briefing Material)

15 Feb 01

Cat 1

DI-EMCS-81540B

Seq B029

Electromagnetic Environmental Effects (E3)

Integration and Analysis Report (E3AR)

25 Jul 10

Cat 1

DI-MICS-80711A

Seq B030

Scientific and Technical Reports (Safety/Human

Systems Integration/HFE Reports)

21 Jan 00

Cat 1

DI-SESS-81497A

Seq B031

Reliability Prediction and Documentation of

Supporting Data

19 Dec 14

Cat 1

DI-MGMT-81334D

Seq B032 Contract Work Breakdown Structure

18 May 11

Cat 1

DI-MGMT-81861A

Seq B033 Integrated Program Management Report

16 Sep 15

Cat 1

DI-MGMT-81468

Seq B034 Contract Funds Status Report

19 Oct 95

B. Regulations, Specifications, and Other Documents

1. FAR 52.246-11 Higher-Level Contract Quality Standard Feb 1999

(Attach 3, C-5-1) Cat 1

2. ASME Yl4.24M-2000 Types and Applications of Engineering 01 Jan 99

(Attach 3, C-6.5) Drawings Cat l

3. ASME Y14.100 Engineering Drawing Practices 30 Jul 13

(Attach 3, C-6.5, Cat 2

General)

4. CFR 29 Sec 1910, Occupational Safety and Health Standards 01 Jul 03

OSHA, Subpart Z Cat 1

(Attach 3, C-8.5.1)

5. CFR 49 U.S. Government Material 01 Oct 02

(Attach 3, C-7.2) Cat 1

6. CFR 49, Sec 178.600 Purpose and Scope, Testing of Non-bulk 01 Oct 02

(Attach 3, C-7.1.1, Packaging and Packages Cat 1

C-10.11.1.1)

7. AR 190-11, Chapter 7 Physical Security of Arms, Ammunition, 12 Feb 98

(Attach 3, C-7.2 ) and Explosives Cat 1

8. NAS 411 Hazardous Materials Management Program 30 Sep 13

(Attach 3, C-8.5.2) Cat 1

9. TB 700-2 Department of Defense Ammunition 30 Jul 12

(Attach 3, C-8.4) and Explosives Hazard Classification Cat 1

Procedures

10. MIL-STD-882E Standard Practice for System Safety 11 May 12

(Attach 3, C-8.3, Cat 1

C-10.7.2.1)

11. MIL-STD-1168C Ammunition Lot Numbering and Ammunition 11 Mar 14

(Attach 3, C-7.5.2, Data Card Cat 1

5.1.1.1.3)

12. DOD 4145.26-M DOD Contractor’s Safety Manual for Ammunition 13 Mar 08

(Attach 3, C-8.3) and Explosives Cat 1

13. DoD 4500.9-R Defense Transportation Regulation-Cargo May 14

Ch 205 Movement Cat 1

(Attach 3, C-7.2)

14. DOD 5100.76M Physical Security of Conventional Arms, 12 Aug 00

(Attach 3, C-7.2) Ammunition and Explosives Cat 1

15. DOD 5220.22-M National Industrial Security Program 01 Feb 06

(Attach 3, C-6.7, Operating Manual Supplement 1 Cat 1

C-10.9.3.6, C-10.11.2.2)

16. ANSI/ISO/ASQ Q9001 Quality Management Systems–Requirements 15 Nov 08

(Attach 3, C-5.1, Cat l

C-10.10.1.1)

17. ISO 11462-1 Guidelines for implementation of statistical 2001

(Attach 3, C-5.1.1.6) process control (SPC)- Part 1: Elements of SPC Cat 0

18. MIL-STD-31000A Technical Data Packages 26 Feb 13

(Attach 3, C-10.9.3.3.1.2) Cat 1

19. Drawing ACV00561 Unit Load Marking for Shipment and Storage, 26 Nov 08

Rev F Ammunition and Explosive Cat 1

(Attach 3, C-7.1.2)

20. Drawing 8796522 Marking Diagram and Sealing for Wood 3 Oct 07

Rev BM Packing Boxes Cat 1

21. Drawing 12982865 Minimum Marking Instructions for Ammunition 30 Jul 04

Rev H and Explosive Containers Cat 1

22. Drawing 12999545 Two-Dimensional Barcode Ammunition Label 19 Aug 13

Rev G Instructions for Ammunition and Explosive Cat 1

(Attach 2, C-7.1.2) Containers

23. ANSI / ASQ Z1.4 Sampling Procedures and Table For Inspection 2013

(Attach 3, C-5.1.1.1.1) by Attributes Cat 1

24. ISO 10012:2003 Measurement, Management Systems- 10 Jun 03

(Attach 2, C-5.1.1.2) Requirements for measurement processes and Cat. 1 measuring equipment.

25. IPC J-STD-001, Requirements for Soldered Electrical and 01 Jul 14

Class 3 Electronic Assemblies Cat 1

(Attach 3, C-5.3, 10.10.1.1)

26. MIL-HDBK-1568 Corrosion Prevention and Control Planning Guidebook 18 July 96

(Attach 3, C-5.4.1) (Guideline) Cat 0

27. 7 CFR 319.40-3 Wood Packaging Materials 01 Jan 08

(Attach 3, C-7.1.3) Cat 1

28. SAE EIA 649-1 Configuration Management Requirements for 04 Mar 15

(Attach 3, C-6.1) Defense Contracts Cat 1

29. ASME Y14.34 Engineering Drawing and Related Documentation 01 Jan 13

(Attach 3, C-6..5) Practices Cat 1

30. ASME Y14.41 Standards for Geometric Dimensioning and Tolerancing 14 May 12

(Attach 3, C-6.5) Standards Cat 1

31. MIL-STD-961E Defense and Program-Unique Specifications 09 Jan 14

Change 2 Format and Content Cat 1

(Attach 3, C-6.5)

32. SAE AS5553A Counterfeit Electronic Parts; Avoidance, Detection, 01 Jan 13

(Attach 3, C-4.5) Mitigation, and Disposition Cat 1

33. SAE AS9100C Aerospace Requirements, Quality Management Systems 01 Jan 09

(Attach 3, C-5.1) Cat 1

34. ISO 9000 Quality Management Systems-Fundamentals and 15 Sep 05

(Attach 3, C-5.1.1.3) Vocabulary Cat 1

35. FAR 52.246-2 Higher-Level Contract Quality Standard Feb 1999

(Attach 3, C-5.1.1.1.2) Cat 1

36. SAE AS7106/2A Aerospace Requirements for Corrective Action 01 Sep 95

(Attach 3, C-5.1.1.3.1) & Disposition System for Nonconforming Material Cat 1

37. DoDD 8570.01 Information Assurance Training, Certification, and 23 Apr 07

(Attach 3, C-9.0) Workforce Management Cat 1

38. DoDD 8570.01-M Information Assurance Workforce Improvement Plan 10 Nov 15

(Attach 3, C-9.0 Cat 1

C-10.16.1)

39. AR 25-2 Information Assurance Rapid Action Revision (RAR) 24 Oct 07

(Attach 3, C-9.0, Cat 1

C10.16.3)

40. MIL-STD-881D Work Breakdown Structures for Defense Material 03 Oct 11

(Attach 3, C-10.6.1.5) Items Cat 1

41. MIL-STD-464 Electromagnetic Environmental Effects Requirements 01 Dec 1

(Attach 3, C-10.7.1.8) For Systems Cat 1

42. ADS-37A-PRF Electromagnetic Environmental Effects Performance 28 May 96

(Attach 3, C-10.7.1.8) And Verification Requirements Cat 1

43. AMCOM Reg 385-17 Hazardous Items Contracts 01 Apr 83

(Attach 3, C-10.7.2.1) Cat 1

44. MIL-STD-52406B-IS Interface Standard For System Interface Requirements 14 Jun 11

(Attach 3, C-10.9.3.3.1.2)For Engineering Data Cat 1

45. MIL-STD-130 Identification Marking of U.S. Military Property 16 Nov 12

(Attach 3, C-10.9.6.4) Cat 1

46. IPC/WHMA-A-620 Requirements and Acceptance for Cable and Wire 01 Aug 13

(Attach 3, C-10.10.1.1) Harness Assemblies Cat 1

47. DoDD 4140.65-M Issue, Use, and Disposal of Wood Packaging Material 21 Aug 12

(Attach 3, C-10.11.1.2) (WPM) Cat 1

48. MIL-STD-40051-1-C Preparation of Digital Technical Information For 01 Sep 95

(Attach 3, C-10.11.2.5) Interactive Electronic Tech Manuals Cat 1

49. DI-RELI-80685 Critical Item List 30 Sep 88

(Attach 3, C-5.1.1.4) Cat 0

50. ANSI/EIA-748 Earned Value Management Systems 01 Mar 13

(Attach 3, C-10.6.1.5) Cat 0

51. AR 700-145 Item Unique Identification 18 Feb 16

(Attach 3, C-7.1.2) Cat 1

File details come from the government source that posted it. Updated .