ExhibitA_CDRL-Production_7Jun2018.PDF
PDF 862 KB Posted
- Solicitation number
- W31P4Q-17-R-0046
About this file
This document provides details for a forthcoming Request for Proposal for Hydra-70 Rocket System production and engineering services. The U.S. Army Contracting Command-Redstone Arsenal plans to award a single-source hybrid Firm-Fixed-Price and Cost Type contract for five years. The contract will provide Hydra-70 Rocket System hardware including the MK 66 MOD 4 Rocket Motor, various rockets and warheads, containers, packaging, and engineering services. Engineering services will include program management, engineering, safety, configuration management, testing, production support, and administration to maintain the Hydra-70 Rocket System and its variants. The Hydra-70 Rocket System is used by the U.S. Army, Marines, Navy, Air Force, and for Foreign Military Sales on approximately 20 rotary and fixed wing aircraft. It is designed for anti-materiel, anti-personnel, and suppression missions against a wide range of targets in close air support of ground forces.
Exhibit A CDRL-Production
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W31P4Q-19-X-XXXX
Exhibit A
7 June 2018
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Presentation Material Program Management Reviews
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81373 SOW Section C-3.1, C-10.6.1.3
SFAE-MSL-JAP
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT
QTRLY SEE 16
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A
N/A SEE 16
Reg
Repro
16. REMARKS:
Blk 8, 13: Government approval or disapproval within 10 calendar days of receipt. If disapproved, submit revisions and comment responses within 10 calendar days after receipt of Government comments.
Blk 12: Submit presentation NLT 5 calendar days prior to scheduled Program Management Review.
Blk 9 - For distribution statement and export control act warning – See end page of CDRL package.
Blk 14: Delivery shall be in electronic media (Microsoft
Office Products) via the Collaborative Data Environment
(CDE). Electronic notification shall be sent via email
IAW clause C-6.7.
SEE 16
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Everett Roper 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER RELI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER RELI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Failure Summary and Analysis Report Failure Analysis Reporting /
Corrective Action Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80255A SOW Section C-
5.1.1.1.2.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ASREQ SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions and comment responses within 30 calendar days after
Blk 10: Updates shall be made as LAT Failure Reports are created.
Blk 12, 13: Submit LAT Failure Analysis Report with
Corrective Action Plan no later than 30 calendar days after failure incident.
(CDE). Electronic notification shall be sent via email
/S/ David Jeffress 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 System Safety Hazard Analysis (SSHA)
Report
N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-80101C SOW Section C-8.3.2 SFAE-MSL-JAP
INSERT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
SEE 16 SEE 16
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.
Blk 10, 12, 13. Initial submission shall be a minimum of
90 calendar days prior to first contractor test or 75 calendar days prior to first Government test, whichever occurs first. Submission of hazard explosive data to support Interim Hazard Classification requests shall be provided a minimum of 60 calendar days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification, creates a new hazard or increases risk.
Blk 14. Delivery shall be in electronic media (Microsoft
(CDE). Electronic notification shall be sent via email
/S/David Harbison 13 April 18 /S/ Lee Gray 13 April 18
DD Form 1423-1, 1 Jun 90
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MCCR
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
A004 Contractor’s Risk Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81808 SOW Section C-8.1 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
N/A 60 DAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor
Blk 13. Submit revisions for changes to parts, material & processes.
/S/David Harbison 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Test Plan First Article Test (FAT), Tailored
First Article Test (TFAT) and
Requalification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80566A SOW section C-5.2.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10: As required in accordance with the SOW except as agreed to by the IPT.
Blk 12, 13: Submit 60 calendar days prior to test, except as agreed to by the Government.
(CDE). Electronic notification shall be sent via email
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
A006 Engineering Release Record (ERR) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80463D SOW C-6.2.1, C-10.9.3.5 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
XX
SECT. B
8. APP CODE
A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. The record will be approved/disapproved by the
Government in conjunction with the ECP, DI-SESS-
80639D.
Blk 10, 12, 13. The document shall be created and submitted with the formal ECP (see CDRL A010).
Blk 14. Any classified data shall be sent to JAMS
Security; SFAE-MSL-JAS. Referenced to: SFAE-MSL-
JAP. If the ECP is unclassified data, then the ERR electronic data shall be submitted as additional data using the “Supplemental Information” block of the Multi-user
ECP Automated Review System (MEARS).
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Lee Gray 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A007 Technical Report-Study/Services Single Point of Failure MGMT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW section C-4.4 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
N/A 120 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 13: Annual delivery to include first tier suppliers.
/S/ Brad Schroer 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A008 Test Procedure Lot Acceptance Test (LAT)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80603A SOW section C-5.1.1.1.2
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10: A plan procedure shall be submitted for Warheads, Motors (Including Static), All-Up Round (AUR), Grain, MK311, MK26, Igniters and Fuzes as required and for each revised plan.
Blk 12: Submit 60 days prior to LAT event.
Blk 13: Subsequent submissions are as required when revisions to the approved plan procedure are necessary.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
A009 Engineering Change Proposal (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80639D SOW Section C-6.2.1, C-6.4, C-10.9.3.2
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 10, 12. Generated as required to propose changes to existing technical baseline.
Blk 8, 13. The Government Configuration Control Board
(CCB) will approve or comment on and return the formal
ECP for rewrite as necessary. Dates for contractor resubmittal will be contained in the letter returning the formal ECP.
Blk 14. Any classified data shall be sent to JAMS Security;
SFAE-MSL-JAS. Referenced to: SFAE-MSL-JAP. If the
ECP is electronic: One copy shall be submitted using the
Multi-user ECP Automated Review System (MEARS) addressed to assigned CDM Analyst in JAMS and
USARMY Redstone Arsenal AMCOM Mailbox IMMC-
MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.
mailto:usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
A010 Request for Variance (RFV) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80640D SOW C-6.2.1 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 10, 12. RFV shall be submitted if the contractor builds deficient hardware that is non-compliant or conflicts with the government approved TDP.
Blk 8, 13. The Government Configuration Control Board
(CCB) will approve or comment on and return the formal
RFV for rewrite as necessary. Dates for contractor resubmittal will be contained in the letter returning the formal RFV.
Blk 14. Any classified data shall be sent to JAMS Security;
SFAE-MSL-JAS. Referenced to: SFAE-MSL-JAP. If the
RFV is electronic: One copy shall be submitted using the
Multi-user ECP Automated Review System (MEARS) addressed to assigned CDM Analyst in JAMS and
USARMY Redstone Arsenal AMCOM Mailbox IMMC-
MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
A011 Notice of Revision (NOR) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80642D SOW Section C-6.2.1, C-6.5, C-10.9.3.2
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. The document will be approved/disapproved by the
Government and corrected in conjunction with the ECP, DI-SESS-80639D.
Blk 10, 12, 13. The document shall be created and submitted with each ECP, DI-SESS-80639D.
Blk 14. Any classified data shall be sent to Security; SFAE-
MSL-JAS. Referenced to: SFAE-MSL-JAP. If the ECP is electronic, the NOR copy shall be submitted using the
Multi-user ECP Automated Review System (MEARS) addressed to USARMY Redstone Arsenal AMCOM
Mailbox IMMC-MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A012 Test / Inspection Report Lot Acceptance Test (LAT)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SOW Section C-5.1.1.1.2 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
16. REMA; 14RKS:
Blk 8; 13: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10, 12: Submit within 30 calendar days after completion of test.
/S/ David Jeffress 13 April 18 /S/ Lee Gray 13 April 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
A013
Test/Inspection Report
First Article Test (FAT), Tailored First Article Test
(TFAT) and Requalification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SOW Section C-5.2.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10: As required in accordance with the SOW except as agreed to by the IPT.
Blk 12: Submit within 30 calendar days after completion of test.
(CDE). Electronic notification shall be sent via email
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A014 Test / Inspection Report First Piece Inspection (FPI)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SOW Section C-5.2.2 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 10;13: As required in accordance with the SOW except as agreed to by the IPT.
Blk 12: Submit within 45 calendar days after completion of test And prior to submission of any system, subsystem, component, or material to the Government for inspection and acceptance.
(CDE). Electronic notification shall be sent via email IAW clause C-6.7.
SFAE-MSL-JAPP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A015 INTEGRATED PROGRAM
MANAGEMENT REPORT (IPMR)
INTEGRATED MASTER
SCHEDULE (IMS)/INTEGRATED
MASTER PLAN (IMP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81861A SOW SECTION C-3.4 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEE 16 90 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 4: Tailoring as set forth in the Document Summary
List.
Blk 8, 13: Government approval or disapproval within 45 calendar days of receipt. If disapproved, submit revisions and comment responses within 45 calendar days after
Blk 10:
Format 6: Quarterly
0 1 0
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Allen Haiges 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A016 Contractor’s Configuration
Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80858C SOW Section C-6.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
N/A 30 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval or disapproval within 30 calendar days after receipt. Submit revisions and comment responses within 30 calendar days after receipt of
Government comments.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A017 Critical Safety Item, Characteristic and
Critical Defect Reporting
Critical Item Failure Reporting
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-80970A SOW Section C-5.1.1.4.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10: As required for each critical item defect.
Blk 12: Contractor shall provide report within 3 calendar days after any occurrence of any critical defect.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A018 CONFIGURATION AUDIT
SUMMARY REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81022D SOW Section C-6.6 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A N/A
Blk 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 15 calendar
Blk 12. Submission shall be within 45 calendar days following completion of the audit..
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER PACK
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A019 Performance Oriented Packaging Test
Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-PACK-81059A SOW Section C-7.1.1
AMSAM-MMC-MM-DP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
1TIME SEE 16
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor
Blk 12. Submission shall be within 45 calendar days following completion of each test.
AMSAM-MMC-MM-
DP
/S/ Brad Bledsoe 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A020 Configuration Status Accounting
Information
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81253C SOW Section C-6.3 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
QTRLY 90 DAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 14. Delivery shall be in electronic media via the
Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
A021
Explosive Hazard Classification Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-81299C SOW Section C-8.4 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor
Blk 10, 12: Initial submission shall be a minimum of 90 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first.
Submission of hazard explosives data to support Interim
Hazard Classification requests shall be a minimum of 30 calendar days prior to proposed shipment.
/S/ David Harbison 13 April 18 /S/ Lee Gray 13 April 18
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A022 Hazardous Material Management
Program (HMMP) Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-81397C SOW Section C-8.5.2 AMSAM-EN
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ANNLY 1 YAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A AS REQ
Blk 8, 10, and 13. Government approval/disapproval within 30 days of submissions. If disapproved the contractor shall resubmit the report (corrected) within 30
AMSAM-EN
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A023 Hazardous Material Management
Program (HMMP) Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81398C SOW Section C-8.5.1 AMSAM-EN
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ANNLY 1 YAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A AS REQ
Blk 8, 13. Government approval/disapproval within 30 days of submissions. If disapproved the contractor shall resubmit the report (corrected) within 30 days of receipt of
Government comments.
AMSAM-EN
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MFFP
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE GROUP
A024 Corrosion Prevention and Control Plan CPDC Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MFFP-81403A SOW Section C-5.4.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEE 16 120 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproved within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10, 13: Submit revisions for annual Government approval no later than 365 Calendar days after initial plan approval.
Blk 14: Delivery shall be in electronic media via the
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A025 Data Accession List (DAL) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81453A SOW Section C-
5.1.1.2.1.2, C-5.1.1.5, C-
6.7.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEMIA 90 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A026 Quantity Data Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-82164 SOW Section C-3.3.2 SFAE-MSL-JAB
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16 SEE BLOCK 16 b. COPIES
E
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
SEE BLOCK 16 SEE BLOCK 16
Blk 8: Government approval or disapproval within 30 calendar days after receipt. Submit revisions and comment responses within 15 calendar days after receipt of Government comments.
Blk 9 - For distribution statement and export control act warning – See end page of CDRL package.
Blk 10-14: Prepare the Quantity Data Report in accordance with
Quantity Data Report Data Item Description (DID) DI-MGMT-82164
(or the most recently approved version), and the OSD Deputy
Director, Cost Assessment (DDCA)-approved contract Draft DD
FORM 2794 . The DID, DI-MGMT-82164, is available from the
Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The Draft DD
FORM 2794 is included as a contract attachment.
Contractors shall be required to submit the Quantity Data Report at frequencies specified in the OSD DDCA-approved Draft DD FORM
2794 and in the contract. The contract Draft DD FORM 2794 uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government
Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD
DDCA-approved Draft DD FORM 2794. (Continues on next page)
SFAE-MSL-JAB
DCARC
/S/ Duncan Tovar 13 April 18 /S/ Lee Gray 13 April 18
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
The Quantity Data Report shall be delivered in MS Excel (.xlsx) or comma separated values (.csv) in the contractor’s format of choosing, so long as it fulfills the requirements of the Draft DD FORM 2794 as is in accordance with the Quantity Data Report DID. When directed by DDCA, all subsequent Quantity Data
Report submissions will be expected to submit in JavaScript Object Notation (JSON) as described in the
Quantity Data Report File Format Specification (FFS) and Data Exchange Instructions (DEI) referenced in the
Quantity Data Report DID Section III.
All Quantity Data Reports shall be submitted electronically using…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .