This document provides details for a forthcoming solicitation for the Hydra-70 Rocket System. The solicitation will be for full rate production of the Hydra-70 Rocket System hardware and associated engineering services. The Hydra-70 Rocket System is a 2.75-inch unguided rocket family employed on multiple rotary and fixed wing aircraft used by the U.S. Army, Marines, Navy, Air Force and foreign militaries. The acquisition will be for procurement of the Hydra-70 Rocket System and its variants including various rocket motors, warheads, containers and components. The engineering services will provide program management, engineering, safety, configuration management, testing and evaluation, production support and administrative efforts to maintain the system. The government anticipates awarding a single-source hybrid firm-fixed-price and cost reimbursement contract for a period of five years to a qualifying offeror that provides the best value. The solicitation is restricted to companies that are members of the National Technology and Industrial Base.
Exhibit B CDRL- Engineering Services
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W31P4Q-19-X-XXXX
Exhibit B
13 September 2018
Contract Data Requirements List
13 April 2018
Joint Attack Munition Systems Project Office SFAE-MSL-JA, Redstone Arsenal, AL 35898-5610
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B001 Engineering and Technical Services
Accomplishment Report
Program Management Control
Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80061A SOW C-10.6.1.1 SFAE-MSL-JAE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION IN
LT
SEE 16 SEE 16
b. COPIES
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A
N/A SEE 16
Reg
Repro
16. REMARKS:
BLK 8. Government approval/disapproval within 5 calendar days of receipt.
If disapproved, the contractor shall resubmit within 10 calendar days of receipt of Government comments.
BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).
BLK 10, 12, 13. First Report due on the 30th of the month following the first full accounting month subsequent to contract award. Subsequent reports are due quarterly per ESM task.
BLK 14. Delivery shall be in electronic media (Microsoft Office Products) via the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.
SEE 16
0 1 0
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Denika Harrell 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
DD Form 1423-1, Feb 2001
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B002 System Safety Hazard Analysis (SSHA)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-80101C SOW C-10.7.2.1 SFAE-MSL-JAE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.
BLK 9. For Distribution Statement and Export Control Act Statement see last page of
Exhibit B Contract Data Requirements List (CDRL).
BLK 10, 12, 13. Initial submission shall be a minimum of 60 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first. Submit 30 calendar days prior to a PDR and update 30 calendar days prior to a CDR. Submission of hazard explosive data to support Interim Hazard
Classification requests shall be provided a minimum of 30 calendar days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification, creates a new hazard or increases risk. This data shall be submitted as an appendix to the Safety Assessment Report (DI-
SAFT-80102C)
BLK 14. Delivery shall be in electronic media (Microsoft Office Products) via the
Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ David Harbison 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon
System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B003 Safety Assessment Report (SAR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-80102C SOW C-10.7.2.1 SFAE-MSL-JAE
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.
last page of Exhibit B Contract Date Requirements List (CDRL).
BLK 10, 12, 13. Initial submission shall be a minimum of 60 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first. Submit 30 calendar days prior to a PDR and updates if required 30 calendar days prior to a CDR. Submission of hazard explosive data to support Interim Hazard Classification requests shall be provided a minimum of 30 working days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification, creates a new hazard or increases risk. Report shall include a separate section that addresses the System
Safety Hazard Analysis (DI-SAFT-80101C) via the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B004 Failure Summary and Analysis Report QE & Reliability Analysis
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80255A SOW C-10.7.1.2, C-10.10.1.2,
C-10.10.1.3, C-10.10.1.4, C-
10.13.2
SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A
BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).
BLK 10, 11, 12, 13. Report (email when acceptable) provided to JAMS
Product Assurance 30 calendar days prior to implementation of ES design or configuration changes.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ David Jeffress 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon
System
W31P4Q-19-X-XXXX
B005 Test Plans/Test Procedures
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81704 SOW 10.12.2 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
ASREQ SEE 16
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8. Government approval/disapproval within 30 calendar days of receipt.
If disapproved the contractor shall resubmit within 25 calendar days of receipt of Government comments.
page of Exhibit B Contract Date Requirements List (CDRL).
BLK 10, 12, 13. Submit NLT 60 calendar days prior to test, except as agreed to by the IPT.
BLK 14. Delivery shall be in electronic media (Microsoft Office Products) via the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.
/S/ Ezio R. Wheeler 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MCCR
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon
System
W31P4Q-19-X-XXXX
B006 Computer Software Product End Items Software and Firmware Code
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ACVS-80700 SOW C-10.8.2 SFAE-MSL-JAS
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 9: For Distribution Statement and Export Control Act Statement see last
BLK 10, 12, 13: Delivery
- Every software update
- 90 calendar days prior to system CDR
- end of contract
/S/ Ashley Mathis 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon
System
W31P4Q-19-X-XXXX
B007 Test/Inspection Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SOW 10.12.2 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 10, 12, 13. Submit NLT 60 calendar days after completion of test.
Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit within 30 calendar days of receipt of
Government comments.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER FNCL
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B008 Performance and Cost Report (PCR) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-FNCL-80912 SOW C-10.6.1.5 SFAE-MSL-JAE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
B
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft page of Exhibit B Contract Data Requirements List (CDRL.).
BLK 10, 12, 13. First Report due on the 15th of the month following the first due on the 15th of each month.
/S/ Denika Harrell 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B009 Revisions to Existing Government Documents Publications
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-80925A SOW C-10.11.2.1 SFAE-MSL-JAL
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8. Government approval requirements will be stipulated in the technical direction letter.
BLK 10 and 11. Start of work meetings, in-process reviews, and verification/validation meetings shall be conducted by a joint
Government/contractor team. Date and locations will be determined by the
Government.
BLK 12 and 13. Delivery schedule will be within 45 calendar days of ECP approval.
SFAE-MSLS-JAMS-LOG-S
SFAE-MSLS-JAMS-LOG-S
15. TOTAL 1 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Brad Bledsoe 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B010 Product Drawings/Models and Associated Lists N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81000E SOW C-10.9.3.3.1.2 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8. Government approval/disapproval within 30 calendar days of receipt. If
BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Date Requirements List (CDRL).
BLK 10, 12, 13. Submittal due 14 calendar days after receipt of Engineering
Services Memorandum (ESM) Approval. Submittal due 7 calendar days prior to
Design Review II. Submittal due concurrent to submittal of ERR.
See B023 Enclosure 2 (TDP Option Selection Worksheet).
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Lee Gray 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
TDP OPTION SELECTION WORKSHEET
SYSTEM: Hydra-70 2.75 Rocket System DATE PREPARED: 03 Mar 2014
A. CONTRACT NO.
W31P4Q-14-C-0116
B. EXHIBIT/ATTACHMENT NO.
Enclosure 2 for Sequence B023
C. CLIN
D. CDRL DATA ITEM NO.
B023
1. TDP Level (X and complete as applicable.)
A. CONCEPTUAL LEVEL
DEVELOPMENTAL
LEVEL
PRODUCTION LEVEL
B. REMARKS:
2. TYPE AND FORMAT (X all that apply and complete as applicable)
A.
TYPE 2D: 2D DRAWINGS
TYPE 3D: 3D MODEL ONLY
TYPE 3D: 3D MODELS WITH
ASSOCIATED 2D DRAWINGS
B.
NATIVE CAD (SPECIFY TYPE) _______TBD_______________________
ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)_____________
ISO32000 PORTABLE DOCUMENT FORMAT:
OTHER ELECTRONIC FORMAT (SPECIFY TYPE)
_______Specifications and 2D Drawings to be submitted in PDF format____________
HARDCOPY: ___________________________________________
REMARKS: 3D models are required on new designs. 3D models required on legacy product only if already available.
3. CAGE Code AND DOCUMENT
NUMBERS
A. CONTRACTOR CAGE AND DOCUMENT NUMBERS
GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)
D. To Be Assigned By:
JAMS CM
B. USE CAGE CODE: 18876 and
30003 (Indian Head)
C. USE DOCUMENT NUMBERS: Assigned by JAMS CM
4. DRAWING FORMATS (X one and complete as applicable)
CONTRACTOR FORMAT.
GOVERNMENT FORMAT.
REMARKS: _________________________________________________________________________________________
5. TDP ELEMENTS REQUIRED (X all that apply)
ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR-OR THE FOLLOWING ARE REQUIRED:
CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS
DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LIST
COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LIST
QUALITY ASSURANCE PROVISIONS
SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS
SPECIFICATIONS
SOFTWARE DOCUMENTATION
SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LIST
6. ASSOCIATED LISTS (X and complete as applicable)
A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE
B. DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
C. INDEX LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
D. WIRINGLIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
E. INDENTURE DATA LIST (X
ONE)
(1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)
ASME Y14.100
ENGINEERING
DRAWING PRACTICES
WITH APPENDICES
B C D E
ASME Y14.24 TYPES AND APPLICATIONS OF
ENGINEERING DRAWINGS
ASME Y14.34 ASSOCIATED LIST
ASME Y14.35 REVISION OF ENGINEERING DRAWINGS
AND ASSOCIATED LIST
ASME Y14.41 DIGITAL PRODUCT DATA PRACTICES
ASME Y14.5 DIMENSIONING AND TOLERANCES
OTHER STANDARDS APPLY AS
DESCRIBED:
COMPANY STANDARDS
PERMITTED: YES NO
8. OTHER TAILORING
ASME Y14.100 tailoring Enclosure 3- Table A1 Tailoring Checklist
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER PACK
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B011 Performance Oriented Packaging (POP)
Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-PACK-81059A SOW C-10.11.1.1 AMSAM-MMC-MM-DP
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST SUBMISSION
1TIME SEE 16
SECT. B
8. APP CODE
D
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A N/A
BLK 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.
Other requests for this document shall be referred to:
U.S. Army Aviation and Missile Command
ATTN: AMSAM-MMC-MM-DP
Redstone Arsenal, AL 35898-5000
BLK 12. Submission shall be within 45 calendar days following completion of each test.
the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.
15.TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Brad Bledsoe 13 Apr 2018 /S/ Lee Gray 13 Apr 2018
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B012 Explosive Hazard Classification Data N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-81299C SOW -10.7.2.1 SFAE-MSL-JAE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8: Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.
of Exhibit B Contract Date Requirements List (CDRL.).
BLK 10, 12, 13. Submit NLT 30 calendar days prior to shipment need date.
Update whenever a change in configuration occurs that impacts existing explosive hazard classification (IHC).
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon
System
W31P4Q-19-X-XXXX
B013 Failure Analysis And Corrective Action Report Preliminary Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80255A SOW C-10.12.2 SFAE-MSL-JAP/-JAE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
N/A D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 10, 12. Preliminary Report submitted Not Later Than (NLT) 5 calendar days from identification of failure.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B014 Failure Analysis And Corrective Action
Final Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80255A SOW C-10.7.3 SFAE-MSL-JAE
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 10, 12, 13. Final Report with Corrective Actions submitted NLT 30 calendar days from identification of failure. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit within 30 calendar days of receipt of Government comments.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B015 Software Requirements Specification (SRS) Software/Firmware Requirements
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81433A SOW C-10.8.2
SFAE-MSL-JAS
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 12 and 13. Submit 60 calendar days prior to Software PDR and CDR.
Submit revisions as needed for computer resources changes. Government approval or disapproval within 30 calendar days of receipt. Submit revisions within 30 calendar days after receipt of Government comments.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B016 Software Design Description (SDD) Software/Firmware Design
Description
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81435A SOW C-10.8.2
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 12 and 13. Submit 60 calendar days prior Software PDR and CDR.
Submit revisions as needed for computer resources design changes. Government approval or disapproval of revisions 30 calendar days after receipt. Submit revisions within 30 calendar days after receipt of comments.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B017 Software Test Plans (STP) Software/Firmware Test Plans
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81438A SOW C-10.8.3
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 12 and 13. Submit 60 calendar days prior Software PDR and CDR.
Submit revisions as needed for computer resources design changes. Government approval or disapproval of revisions 30 calendar days after receipt. Submit revisions within 30 calendar days after receipt of comments.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B018 Software Test Description (STD) Software/Firmware Test Desc.
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81439A SOW C-10.8.3
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 10, 12 and 13. Submit 60 calendar days prior to start of formal computer resources test. Submit revisions as needed, but at least 15 calendar days prior to planned start of formal computer resources test. Government approval or disapproval 30 calendar days after receipt of initial submittal. Government approval or disapproval of revisions 15 calendar days after receipt.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B019 Software Test Report (STR) Software/Firmware Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81440A SOW C-10.8.3, C-10.8.4
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 10, 12 and 13. Submit 30 calendar days after completion of each formal computer resources test. Government approval or disapproval 30 calendar days after receipt. Submit revisions within 15 calendar days after receipt of Government comments.
last page of Exhibit B Contract Data Requirements List (CDRL).
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B020 Software Product Specification (SPS) Software/Firmware Product
Specification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81441A SOW C-10.8.1
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 10, 12 and 13. Submit 60 calendar days after completion of
Software Formal Qualification Test. Submit all sections concurrent with
Government acceptance of the final build of computer resources.
Government approval or disapproval 30 calendar days after receipt.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Ashley Mathis 13 Apr 18 /S/ Lee Gray 13 Apr 18
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER IPSC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B021 Software Version Description (SVD) Software/Firmware Version Desc.
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-IPSC-81442A SOW C-10.8.2
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 10, 12 and 13. Submit 15 calendar days after release of each informal and formal computer resources build. Government approval or disapproval 15 calendar days after receipt. Submit revisions within 15 calendar days after receipt of Government comments.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Ashley Mathis 13 Apr 18 /S/ Lee gray 13 Apr 18
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER SDMP
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon
System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B022 Program Unique Specification Documents Performance Based
Product/Process Specification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SDMP-81493A SOW C-10.9.3.3.1.1 SFAE-MSL-JAP
REQUIRED
10.
FREQUENCY
12. DATE OF FIRST SUBMISSION
AS
REQ
30 DAC
b. COPIES
SECT. B
8. APP CODE
D
11. AS OF
DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 8, 13. Government approval or disapproval of performance baseline specifications within 20 calendar days after receipt. Submit revisions and comment responses within 20 calendar days after receipt of government comments.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Lee Gray 13 Apr 18 /S/ Lee Gray 13 Apr 18
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B023 Scientific and Technical Reports Safety Technical Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80711A SOW C-10.7.1.5 SFAE-MSL-JAE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 10, 12, 13. Each submittal shall be no later than 30 calendar days following each Government request for technical data in support of safety requirements unless otherwise specified by the Government when the request for technical data is made. Submit updates as required.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ David Harbison 13 Apr 18 /S/ Lee Gray 13 Apr 18
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX
B024 Briefing Material Safety Briefing Material
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81605 SOW C-10.7.1.5 SFAE-MSL-JAE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).
BLK 10, 12, 13. Each submittal shall be no later than 30 calendar days prior to each Safety Board or Safety Panel meeting unless otherwise specified by the
Government when the request is made. Submit updates as required.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188).