ExhibitB_CDRL-_Engineering_Services_13Sept2018.pdf

PDF 727 KB Posted

Attached to
Hydra-70 Rocket System Production and Engineering Services
Solicitation number
W31P4Q-17-R-0046
Issued by

About this file

This document provides details for a forthcoming solicitation for the Hydra-70 Rocket System. The solicitation will be for full rate production of the Hydra-70 Rocket System hardware and associated engineering services. The Hydra-70 Rocket System is a 2.75-inch unguided rocket family employed on multiple rotary and fixed wing aircraft used by the U.S. Army, Marines, Navy, Air Force and foreign militaries. The acquisition will be for procurement of the Hydra-70 Rocket System and its variants including various rocket motors, warheads, containers and components. The engineering services will provide program management, engineering, safety, configuration management, testing and evaluation, production support and administrative efforts to maintain the system. The government anticipates awarding a single-source hybrid firm-fixed-price and cost reimbursement contract for a period of five years to a qualifying offeror that provides the best value. The solicitation is restricted to companies that are members of the National Technology and Industrial Base.

Exhibit B CDRL- Engineering Services

View the file

Other files

File Type Posted
W31P4Q-17-R-0046_0004.pdf PDF
Consolidated_W31P4Q17R0046_Amendment_0004.pdf PDF
Copy_of_Attach_0031_Solicitation_Questions_and_Answers_110218.xlsx XLSX spreadsheet
W31P4Q-17-R-0046_0003.pdf PDF
Attach_0004_TDPListing_26Apr2018.pdf PDF
Attach_0028-_FFP_Hydra_Production_DO_Pricing_PRICING_181025_PDA_R-1.xlsm XLSM spreadsheet
Attach_0006-_FFP_Hydra_Pricing_Tables_PRICING_181017_PDA.xlsm XLSM spreadsheet
Attachment_0025-_Total_Evaluated_Price_Template_PRICING_181025_R-1.xlsm XLSM spreadsheet
W31P4Q-17-R-0046_Consolidated_Amendment_0003.pdf PDF
Attach_0031_Solicitaion_Questions_and_Answers.xlsx XLSX spreadsheet
W31P4Q17R0046-0002.pdf PDF
W31P4Q17R0046_Consolidated_through_Amend_0002.pdf PDF
Attach_0030_Past_Performance_Cover_and_Questionnaire_26Sep2018.pdf PDF
Attach_0009_Hazardous_Material_31Jan2018.pdf PDF
Attach_0008__GFP-GFM_Listing_6Aug2018.pdf PDF
Attach_0003_SOW_18Sept2018.pdf PDF
Attach_0007_CPFF_Hydra_Labor_Rate_Tables_15Aug2018.xlsx XLSX spreadsheet
Attach_0028_FFP_Hydra_Production_DO_Pricing_14Sep2018.xlsm XLSM spreadsheet
Attach_0024_Skill_Classification_Crosswalk_28Dec2017.xlsx XLSX spreadsheet
Attach_0017_ARGSM_System_Risk_Management_Plan_31Jan2018.pdf PDF
Attach_0012_Changes_and_Verification_Request_31Jan18.pdf PDF
Attach_0019_Quality_Assurance_Surveillance_Plan_08Nov2017.pdf PDF
Attach_0010_MK2_Mod_0_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0005_Hazard_Classification_31Jan2018.pdf PDF
Attach_0013_Work_Breakdown_Structure-Cost_and_Software_Data_Report_Plan_31Jan2018.pdf PDF
Attach_0022_M643_Refurb_Acceptance_Criteria_16Apr2018.pdf PDF
Attach_0001_DocSummaryList_13Sept2018.pdf PDF
Attach_0025_Total_Evaluated_Price_Template_17Sep2018.xlsm XLSM spreadsheet
Attach_0020_MK_706_Mod_0_Shipping_Container_Acceptance_Criteria_01Dec2016.pdf PDF
Attach_0016__TDPL_for_CFM_Grain_19Apr2018.pdf PDF
Attach_0029_CAGE_Code_and_DCMA-DCAA_Information_15Aug2018.xlsx XLSX spreadsheet
ExhibitA_CDRL-Production_7Jun2018.PDF PDF
W31P4Q-17-R-0046.pdf PDF
Attach_0004_Technical_Data_Package_Listing_(TDPL)_31Jan2018.pdf PDF
Attach_0006_FFP_Hydra_Pricing_Tables_14Sep2018.xlsm XLSM spreadsheet
Attach_0023_JAMS_Parts_Management_Plan_(PMP)_31Jan2018.pdf PDF
Attach_0011_AT-OPSEC_Cover_and_DD254_26Jan2017.pdf PDF
W31P4Q-17-R-0046_Consolidated_with_Amendment_0001.pdf PDF
W31P4Q-17-R-0046-Amendment_0001.pdf PDF
Attach_0021_PA150-PA151_Refurb_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0027_Delivery_Scenario_13Mar2018.xls XLS spreadsheet
Attach_0026_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist_27Feb2018.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31P4Q-19-X-XXXX

Exhibit B

13 September 2018

Contract Data Requirements List

13 April 2018

Joint Attack Munition Systems Project Office SFAE-MSL-JA, Redstone Arsenal, AL 35898-5610

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B001 Engineering and Technical Services

Accomplishment Report

Program Management Control

Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80061A SOW C-10.6.1.1 SFAE-MSL-JAE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT

SEE 16 SEE 16

b. COPIES

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A

N/A SEE 16

Reg

Repro

16. REMARKS:

BLK 8. Government approval/disapproval within 5 calendar days of receipt.

If disapproved, the contractor shall resubmit within 10 calendar days of receipt of Government comments.

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 12, 13. First Report due on the 30th of the month following the first full accounting month subsequent to contract award. Subsequent reports are due quarterly per ESM task.

BLK 14. Delivery shall be in electronic media (Microsoft Office Products) via the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.

SEE 16

0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Denika Harrell 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

DD Form 1423-1, Feb 2001

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B002 System Safety Hazard Analysis (SSHA)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-80101C SOW C-10.7.2.1 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

BLK 9. For Distribution Statement and Export Control Act Statement see last page of

Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 12, 13. Initial submission shall be a minimum of 60 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first. Submit 30 calendar days prior to a PDR and update 30 calendar days prior to a CDR. Submission of hazard explosive data to support Interim Hazard

Classification requests shall be provided a minimum of 30 calendar days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification, creates a new hazard or increases risk. This data shall be submitted as an appendix to the Safety Assessment Report (DI-

SAFT-80102C)

BLK 14. Delivery shall be in electronic media (Microsoft Office Products) via the

Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ David Harbison 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B003 Safety Assessment Report (SAR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-80102C SOW C-10.7.2.1 SFAE-MSL-JAE

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

last page of Exhibit B Contract Date Requirements List (CDRL).

BLK 10, 12, 13. Initial submission shall be a minimum of 60 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first. Submit 30 calendar days prior to a PDR and updates if required 30 calendar days prior to a CDR. Submission of hazard explosive data to support Interim Hazard Classification requests shall be provided a minimum of 30 working days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification, creates a new hazard or increases risk. Report shall include a separate section that addresses the System

Safety Hazard Analysis (DI-SAFT-80101C) via the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B004 Failure Summary and Analysis Report QE & Reliability Analysis

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80255A SOW C-10.7.1.2, C-10.10.1.2,

C-10.10.1.3, C-10.10.1.4, C-

10.13.2

SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

N/A

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 11, 12, 13. Report (email when acceptable) provided to JAMS

Product Assurance 30 calendar days prior to implementation of ES design or configuration changes.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ David Jeffress 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

B005 Test Plans/Test Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81704 SOW 10.12.2 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

ASREQ SEE 16

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt.

If disapproved the contractor shall resubmit within 25 calendar days of receipt of Government comments.

page of Exhibit B Contract Date Requirements List (CDRL).

BLK 10, 12, 13. Submit NLT 60 calendar days prior to test, except as agreed to by the IPT.

BLK 14. Delivery shall be in electronic media (Microsoft Office Products) via the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.

/S/ Ezio R. Wheeler 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MCCR

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

B006 Computer Software Product End Items Software and Firmware Code

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ACVS-80700 SOW C-10.8.2 SFAE-MSL-JAS

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 9: For Distribution Statement and Export Control Act Statement see last

BLK 10, 12, 13: Delivery

- Every software update

- 90 calendar days prior to system CDR

- end of contract

/S/ Ashley Mathis 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

B007 Test/Inspection Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80809B SOW 10.12.2 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12, 13. Submit NLT 60 calendar days after completion of test.

Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit within 30 calendar days of receipt of

Government comments.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B008 Performance and Cost Report (PCR) N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-FNCL-80912 SOW C-10.6.1.5 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

B

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft page of Exhibit B Contract Data Requirements List (CDRL.).

BLK 10, 12, 13. First Report due on the 15th of the month following the first due on the 15th of each month.

/S/ Denika Harrell 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B009 Revisions to Existing Government Documents Publications

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-80925A SOW C-10.11.2.1 SFAE-MSL-JAL

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval requirements will be stipulated in the technical direction letter.

BLK 10 and 11. Start of work meetings, in-process reviews, and verification/validation meetings shall be conducted by a joint

Government/contractor team. Date and locations will be determined by the

Government.

BLK 12 and 13. Delivery schedule will be within 45 calendar days of ECP approval.

SFAE-MSLS-JAMS-LOG-S

SFAE-MSLS-JAMS-LOG-S

15. TOTAL 1 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Brad Bledsoe 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B010 Product Drawings/Models and Associated Lists N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81000E SOW C-10.9.3.3.1.2 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt. If

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Date Requirements List (CDRL).

BLK 10, 12, 13. Submittal due 14 calendar days after receipt of Engineering

Services Memorandum (ESM) Approval. Submittal due 7 calendar days prior to

Design Review II. Submittal due concurrent to submittal of ERR.

See B023 Enclosure 2 (TDP Option Selection Worksheet).

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Lee Gray 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

TDP OPTION SELECTION WORKSHEET

SYSTEM: Hydra-70 2.75 Rocket System DATE PREPARED: 03 Mar 2014

A. CONTRACT NO.

W31P4Q-14-C-0116

B. EXHIBIT/ATTACHMENT NO.

Enclosure 2 for Sequence B023

C. CLIN

D. CDRL DATA ITEM NO.

B023

1. TDP Level (X and complete as applicable.)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL

LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODEL ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) _______TBD_______________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)_____________

ISO32000 PORTABLE DOCUMENT FORMAT:

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

_______Specifications and 2D Drawings to be submitted in PDF format____________

HARDCOPY: ___________________________________________

REMARKS: 3D models are required on new designs. 3D models required on legacy product only if already available.

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

JAMS CM

B. USE CAGE CODE: 18876 and

30003 (Indian Head)

C. USE DOCUMENT NUMBERS: Assigned by JAMS CM

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: _________________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply)

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR-OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LIST

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LIST

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LIST

6. ASSOCIATED LISTS (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

D. WIRINGLIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

E. INDENTURE DATA LIST (X

ONE)

(1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING

DRAWING PRACTICES

WITH APPENDICES

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35 REVISION OF ENGINEERING DRAWINGS

AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCES

OTHER STANDARDS APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED: YES NO

8. OTHER TAILORING

ASME Y14.100 tailoring Enclosure 3- Table A1 Tailoring Checklist

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER PACK

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B011 Performance Oriented Packaging (POP)

Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-PACK-81059A SOW C-10.11.1.1 AMSAM-MMC-MM-DP

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

1TIME SEE 16

SECT. B

8. APP CODE

D

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

N/A N/A

BLK 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

Other requests for this document shall be referred to:

U.S. Army Aviation and Missile Command

ATTN: AMSAM-MMC-MM-DP

Redstone Arsenal, AL 35898-5000

BLK 12. Submission shall be within 45 calendar days following completion of each test.

the Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.7.

15.TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Brad Bledsoe 13 Apr 2018 /S/ Lee Gray 13 Apr 2018

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B012 Explosive Hazard Classification Data N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-81299C SOW -10.7.2.1 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8: Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

of Exhibit B Contract Date Requirements List (CDRL.).

BLK 10, 12, 13. Submit NLT 30 calendar days prior to shipment need date.

Update whenever a change in configuration occurs that impacts existing explosive hazard classification (IHC).

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

B013 Failure Analysis And Corrective Action Report Preliminary Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80255A SOW C-10.12.2 SFAE-MSL-JAP/-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

N/A D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 10, 12. Preliminary Report submitted Not Later Than (NLT) 5 calendar days from identification of failure.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B014 Failure Analysis And Corrective Action

Final Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80255A SOW C-10.7.3 SFAE-MSL-JAE

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12, 13. Final Report with Corrective Actions submitted NLT 30 calendar days from identification of failure. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit within 30 calendar days of receipt of Government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B015 Software Requirements Specification (SRS) Software/Firmware Requirements

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81433A SOW C-10.8.2

SFAE-MSL-JAS

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 12 and 13. Submit 60 calendar days prior to Software PDR and CDR.

Submit revisions as needed for computer resources changes. Government approval or disapproval within 30 calendar days of receipt. Submit revisions within 30 calendar days after receipt of Government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B016 Software Design Description (SDD) Software/Firmware Design

Description

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81435A SOW C-10.8.2

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 12 and 13. Submit 60 calendar days prior Software PDR and CDR.

Submit revisions as needed for computer resources design changes. Government approval or disapproval of revisions 30 calendar days after receipt. Submit revisions within 30 calendar days after receipt of comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B017 Software Test Plans (STP) Software/Firmware Test Plans

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81438A SOW C-10.8.3

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 12 and 13. Submit 60 calendar days prior Software PDR and CDR.

Submit revisions as needed for computer resources design changes. Government approval or disapproval of revisions 30 calendar days after receipt. Submit revisions within 30 calendar days after receipt of comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B018 Software Test Description (STD) Software/Firmware Test Desc.

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81439A SOW C-10.8.3

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 60 calendar days prior to start of formal computer resources test. Submit revisions as needed, but at least 15 calendar days prior to planned start of formal computer resources test. Government approval or disapproval 30 calendar days after receipt of initial submittal. Government approval or disapproval of revisions 15 calendar days after receipt.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B019 Software Test Report (STR) Software/Firmware Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81440A SOW C-10.8.3, C-10.8.4

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 30 calendar days after completion of each formal computer resources test. Government approval or disapproval 30 calendar days after receipt. Submit revisions within 15 calendar days after receipt of Government comments.

last page of Exhibit B Contract Data Requirements List (CDRL).

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B020 Software Product Specification (SPS) Software/Firmware Product

Specification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81441A SOW C-10.8.1

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 60 calendar days after completion of

Software Formal Qualification Test. Submit all sections concurrent with

Government acceptance of the final build of computer resources.

Government approval or disapproval 30 calendar days after receipt.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Ashley Mathis 13 Apr 18 /S/ Lee Gray 13 Apr 18

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B021 Software Version Description (SVD) Software/Firmware Version Desc.

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81442A SOW C-10.8.2

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 15 calendar days after release of each informal and formal computer resources build. Government approval or disapproval 15 calendar days after receipt. Submit revisions within 15 calendar days after receipt of Government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Ashley Mathis 13 Apr 18 /S/ Lee gray 13 Apr 18

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SDMP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B022 Program Unique Specification Documents Performance Based

Product/Process Specification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SDMP-81493A SOW C-10.9.3.3.1.1 SFAE-MSL-JAP

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

AS

REQ

30 DAC

b. COPIES

SECT. B

8. APP CODE

D

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 13. Government approval or disapproval of performance baseline specifications within 20 calendar days after receipt. Submit revisions and comment responses within 20 calendar days after receipt of government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Lee Gray 13 Apr 18 /S/ Lee Gray 13 Apr 18

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B023 Scientific and Technical Reports Safety Technical Data

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80711A SOW C-10.7.1.5 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 10, 12, 13. Each submittal shall be no later than 30 calendar days following each Government request for technical data in support of safety requirements unless otherwise specified by the Government when the request for technical data is made. Submit updates as required.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ David Harbison 13 Apr 18 /S/ Lee Gray 13 Apr 18

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B024 Briefing Material Safety Briefing Material

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81605 SOW C-10.7.1.5 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 12, 13. Each submittal shall be no later than 30 calendar days prior to each Safety Board or Safety Panel meeting unless otherwise specified by the

Government when the request is made. Submit updates as required.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .