Attach_0026_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist_27Feb2018.pdf

PDF 1 MB Posted

Attached to
Hydra-70 Rocket System Production and Engineering Services
Solicitation number
W31P4Q-17-R-0046
Issued by

About this file

This document contains a pre-award survey checklist for a prospective contractor's accounting system and a notice for a solicitation seeking Hydra-70 Rocket System production and engineering services.

The accounting system checklist requests information from offerors on topics including whether their accounting system has been audited by DCAA, is in compliance with CAS and GAAP, properly segregates direct and indirect costs, and accumulates and distributes labor and other expenses in accordance with government cost accounting standards. It appears to be a template for agencies to evaluate an offeror's financial systems prior to awarding a cost-reimbursement contract.

The solicitation notice indicates the Army intends to release an RFP for a five-year hybrid FFP/cost contract for Hydra-70 Rocket System hardware, including various mark numbers of rockets and warheads, containers, and associated components and packaging. Engineering services will include program management, engineering, production support, and administrative efforts to maintain the system. The incumbent will provide full rate production and engineering support for the weapon system used by military aircraft.

Attachment 0026 Preaward Survey of Prospective Contractor Accounting System Checklist

View the file

Other files

File Type Posted
W31P4Q-17-R-0046_0004.pdf PDF
Copy_of_Attach_0031_Solicitation_Questions_and_Answers_110218.xlsx XLSX spreadsheet
W31P4Q-17-R-0046_0003.pdf PDF
Consolidated_W31P4Q17R0046_Amendment_0004.pdf PDF
Attach_0004_TDPListing_26Apr2018.pdf PDF
Attach_0031_Solicitaion_Questions_and_Answers.xlsx XLSX spreadsheet
Attach_0006-_FFP_Hydra_Pricing_Tables_PRICING_181017_PDA.xlsm XLSM spreadsheet
Attach_0028-_FFP_Hydra_Production_DO_Pricing_PRICING_181025_PDA_R-1.xlsm XLSM spreadsheet
W31P4Q-17-R-0046_Consolidated_Amendment_0003.pdf PDF
Attachment_0025-_Total_Evaluated_Price_Template_PRICING_181025_R-1.xlsm XLSM spreadsheet
W31P4Q17R0046_Consolidated_through_Amend_0002.pdf PDF
Attach_0030_Past_Performance_Cover_and_Questionnaire_26Sep2018.pdf PDF
W31P4Q17R0046-0002.pdf PDF
Attach_0013_Work_Breakdown_Structure-Cost_and_Software_Data_Report_Plan_31Jan2018.pdf PDF
ExhibitA_CDRL-Production_7Jun2018.PDF PDF
Attach_0012_Changes_and_Verification_Request_31Jan18.pdf PDF
Attach_0020_MK_706_Mod_0_Shipping_Container_Acceptance_Criteria_01Dec2016.pdf PDF
Attach_0004_Technical_Data_Package_Listing_(TDPL)_31Jan2018.pdf PDF
W31P4Q-17-R-0046.pdf PDF
ExhibitB_CDRL-_Engineering_Services_13Sept2018.pdf PDF
Attach_0016__TDPL_for_CFM_Grain_19Apr2018.pdf PDF
Attach_0006_FFP_Hydra_Pricing_Tables_14Sep2018.xlsm XLSM spreadsheet
Attach_0021_PA150-PA151_Refurb_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0011_AT-OPSEC_Cover_and_DD254_26Jan2017.pdf PDF
Attach_0027_Delivery_Scenario_13Mar2018.xls XLS spreadsheet
W31P4Q-17-R-0046_Consolidated_with_Amendment_0001.pdf PDF
Attach_0008__GFP-GFM_Listing_6Aug2018.pdf PDF
Attach_0028_FFP_Hydra_Production_DO_Pricing_14Sep2018.xlsm XLSM spreadsheet
Attach_0023_JAMS_Parts_Management_Plan_(PMP)_31Jan2018.pdf PDF
Attach_0022_M643_Refurb_Acceptance_Criteria_16Apr2018.pdf PDF
Attach_0017_ARGSM_System_Risk_Management_Plan_31Jan2018.pdf PDF
Attach_0024_Skill_Classification_Crosswalk_28Dec2017.xlsx XLSX spreadsheet
Attach_0025_Total_Evaluated_Price_Template_17Sep2018.xlsm XLSM spreadsheet
Attach_0003_SOW_18Sept2018.pdf PDF
Attach_0001_DocSummaryList_13Sept2018.pdf PDF
Attach_0007_CPFF_Hydra_Labor_Rate_Tables_15Aug2018.xlsx XLSX spreadsheet
Attach_0009_Hazardous_Material_31Jan2018.pdf PDF
W31P4Q-17-R-0046-Amendment_0001.pdf PDF
Attach_0029_CAGE_Code_and_DCMA-DCAA_Information_15Aug2018.xlsx XLSX spreadsheet
Attach_0005_Hazard_Classification_31Jan2018.pdf PDF
Attach_0010_MK2_Mod_0_Acceptance_Criteria_31Jan2018.pdf PDF
Attach_0019_Quality_Assurance_Surveillance_Plan_08Nov2017.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM

Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.

PLEASE ANSWER THE QUESTIONS BELOW:

HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90 - "Information for Contractors" ON For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").

Pre-award Survey of Prospective Contractor Accounting System Checklist

1. Has your organization's Accounting System ever been audited by DCAA?

the DCAA Report number or DCAA POC info.

1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?

1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?

1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?

2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?

Pre-award Survey of Prospective Contractor Accounting System Checklist

2. Is your organization subject to CAS (48 CFR Chapter 99)?

(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey) 2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?

2.c. Is any aspect of this proposal inconsistent with your orgnaization's disclosed practices or applicable CAS?

Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:

3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?

4. Is your organization's Accounting System currently in full operation?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

6. Is your organization's Accounting System ready for a DCAA audit?

7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)

5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?

8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?

9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?

10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

11. Does the Accounting System Provide for the accumulation of costs under general ledger control?

12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?

13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?

14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?

15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?

16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

17. Does the Accounting System provide for the segregation of preproduction costs from production costs?

18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?

19. Does the Accounting System provide financial information required to support requests for Progress Payments?

Pre-award Survey of Prospective Contractor Accounting System Checklist

22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?

21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?

20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

Pre-award Survey of Prospective Contractor Accounting System Checklist 11.0.0.20130303.1.892433.887364 7142287093 1/06/2016 DCAA/Policy and Plans DCAA Preaward survey of Prospective Contractor Accounting System Checklist Naomi Vaughn Draft Preaward survey of Prospective Contractor Accounting System Checklist

Enter Date as MONTH/DAY/YEAR XX/XX/XXXX:
TextField1:
TextField2:
TextField3:
DateField2:
TextField4:
TextField5:
CheckBox1:
CheckBox2:
CheckBox3:
TextField6:
CheckBox4:
CheckBox5:
TextField7:
CheckBox6:

File details come from the government source that posted it. Updated .