UGM Simonka RFP Pre-Bid Questions.pdf
PDF 493 KB Posted
- Solicitation number
- S-C25102-00012036
- Issued by
- Marion County, Junction City, Oregon
About this file
This is a pre-bid question and answer document for the Union Gospel Mission Simonka Place Women's Shelter Remodel project in Keizer, Oregon. The document includes questions from contractors during a pre-bid walk-through held on December 11, 2024, and addresses technical specifications for a comprehensive renovation including HVAC systems, fire alarms, security cameras, lighting, and hardware upgrades. The project includes a 523 square foot proposed addition, with construction permit applications planned for January 2024. The project requires coordination of temporary modular buildings during construction, weekly construction meetings with remote architect participation, and maintaining operational access to critical facility areas throughout construction.
The project budget is approximately $3.38 million including add-alternates, with no E-Verify requirements. The document includes a detailed site utilization plan showing contractor laydown areas, storage spaces, and required fire lane access. Technical specifications include requirements for new lever hardware on all dorm room doors, 1-hour fire protection measures for ceiling fixtures, and replacement of unrated ceiling access panels with 1-hour rated panels. The contractor must provide temporary power, data, and telephone connections to two modular buildings that will be procured by the owner. While on-site parking for contractors will not be provided, the owner will arrange access to parking at adjacent properties.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Questions Union Gospel Mission Simonka Place Women’s Shelter Remodel 5119 River Road North, Keizer, OR
RFP Contractor Questions Prior to Pre-Bid Walk-Through
Contractor: Triplett Wellman Contractors Question: What is the intended budget for the project or the funds that are allocated for the work?
Answer: The project budget, including add-alternates, is approximately $3.38 million.
Contractor: Triplett Wellman Contractors Question: Will there be E -verify requirements regarding the contract?
Answer: There is no requirement for E-Verify provisions to be included in the contract.
RFP Questions During Pre-Bid Walk-Through December 11, 2024 - 11 am
Question: Is there going to be an asbestos survey?
Answer: An asbestos survey will be required as part of the demolition permit. The owner is engaging a company to perform an asbestos survey and prepare an asbestos report.
Question: HVAC system controls – are they going to be replaced with new programable controls?
Answer: Replaced HVAC units should have new programmable controllers, mounted in their current location in the service closet. Replace remote t-stats with new.
Question: Fire alarms - sensors – locations, do we want new ones?
Answer: Modifications to the existing fire alarm system are design-build. Sensors, horns and strobes in existing unmodified spaces are to remain. Provide new sensors, horns and strobes in modified spaces as required by code, and tie into existing fire alarm system.
Question: Will we relocate cameras displaced by construction? Existing or new?
Answer: Existing camera locations displaced by construction activities will be relocated, with new cameras. Cameras will be tied into the existing monitoring system. Low Voltage modifications by design-build.
Question: Will there be a lighting schedule?
Answer: A lighting schedule will be issued with the permit drawings.
Question: Will questions raised during the walk-through be posted?
Answer: Yes. See answers herein to be posted.
Question: What provisions will be made for on-site storage and staging of construction materials, and for construction trailer(s)? Follow-up question: Will parking be provided for construction workers?
Answer: The southern half of the parking lot will generally be available for staging and storage, with the exception that fire lane access will need to be maintained. Additionally, access to the loading area door must be maintained when the main entry of the building is closed due to construction activities. Owner will arrange with adjacent property owners to secure access to excess parking capacity in the vicinity for use by the contractor and subcontractor. On-site parking for the contractor and workers will not be provided. See Figure 1 at the end of this worksheet for construction stage, storage and trailer locations.
Question: Will connection to temporary power and main building data and telephone be required as part of the project?
Answer: The general contractor shall be responsible for providing and connecting temporary power, data, and telephone to two modular temporary buildings. The owner will procure and supply the two temporary modular buildings during construction activities while the oƯice and classroom areas are being impacted by the project construction.
Question: Will design meetings be held prior to construction?
Answer: There is not a requirement that weekly design meetings be held during the pre-construction period after selection of the contractor. Design meetings will be held as required to coordinate production of the design-build drawings, and to work with the contractor to refine the construction drawings to show means and methods of completing the construction work in an eƯicient manner.
Question: What is the anticipated frequency of construction meetings?
Answer: Construction meetings will be weekly. The architect will not be on-site for every construction meeting, so the general contractor shall provide for remote participation in the weekly meetings. The architect expects to be on site approximately every two weeks, with the frequency to be adjusted depending on the scope of work underway at the time.
Question: What is the status of the permit?
Answer: The permit will be applied for in January 2024.
Question: Some of the posted PDF’s are diƯicult to read.
Answer: New, higher detail PDF’s shall be posted as addendums to the original documents.
Question: Will lever hardware be required to replace the existing knob hardware at the dorm rooms?
Answer: All new doors and relocated doors will have lever hardware. Relocated doors will be provided with new lever hardware. Existing doors in altered rooms will receive new lever hardware. All dorm rooms in the original building will receive new lever hardware.
Question: How will 1-hour fire protection be provided in the ceiling at the removed recessed fixtures and new LED fixtures?
Answer: Existing recessed ceiling fixtures in GWB ceiling will be removed and openings infilled with 5/8” type “X” GWB, taped, sanded and finished to match existing ceiling finish and hide seams. New fixtures will be surface-mounted LED fixtures that utilize a J-box rated for installation in a 1-hour assembly as the fixture housing.
Question: The existing building has two unrated ceiling access panels. Will the project require replacing these with new 1-hour rated access panels?
Answer: (2) new 1-hour access panels to replace the existing will be added to the project scope.
Figure 1: Contractor Site Utilization:
EXISTING
LOADING AREA
EXISTING
PARKING LOT
EXISTING
PARKING LOT
EXISTING ACCESSIBLE
PARKING TO REMAIN
EXISTING 14
PARKING SPACES
EXISTING 9
PARKING SPACES
EXISTING 9
PARKING SPACES
EXISTING
LANDSCAPING
EXISTING
LANDSCAPING
EXISTING CONC.
CURB, TYP.
NK FENCE W/
IC
EXISTING DRIVEWAY/
APPROACH
EXISTING
CONCRETE
SIDEWALK TO
REMAIN
5'- 0"
6'-0" 5'-0" 6'-0"
6'-0"
6"
PROPOSED ADDITION
= 523 S.F.
EXISTING SIGN
'-0
15'-0"
10'-0"
S01
S01
S02 S02
S02
9'-6"
S04
S05 S06
S06
S07
S08
S09 S09
S10
S10
S11
S11
S12
S12
S12
S13
S13 10'-9" S15
S14
ONLY
DO NOT ENTER
ONLY
DO
N
OT
E
NT
ER
S16
S16
S16
S16
S17
DNDN
CONTRACTOR
LAYDOWN/TRAILER AREA
CONTRACTOR LAYDOWN/
STORAGE AREA
KEEP PEDESTRIAN
PATH CLEAR FOR
ACCESS/ EGRESS
WHEN MAIN ENTRY
IS BLOCKED
KEEP 15' WIDE FIRE LANE/DRIVE OPEN AND CLEARDURING CONSTRUCTION
MAINTAIN EXIT PATH
FROM BUILDING TO
R.O.W. AT ALL TIMES
DURING
CONSTRUCTION