UGM Simonka_A2.3 FLOOR FINISH PLAN_12.19.24.pdf

PDF 299 KB Posted

Attached to
Union Gospel Mission - Construction Services at Simonka Place Women's Shelter
Solicitation number
S-C25102-00012036
Issued by
Marion County, Junction City, Oregon

About this file

This is a floor finish plan drawing (A2.3) for the Union Gospel Mission's Simonka Place renovation project in Keizer, Oregon, prepared by Merrick Lentz Architect. The plan details extensive flooring replacements throughout the facility, specifying different flooring materials including luxury vinyl tile (LVT), carpet tile, sheet vinyl, epoxy flooring, and walk-off carpet tile installations. The scope includes removing existing flooring, preparing concrete slabs, and installing new 6" vinyl or coved base throughout various areas. The kitchen and laundry areas require special attention, with the general contractor responsible for disconnecting, moving, replacing, and reconnecting equipment during flooring installation.

The drawing indicates specific material designations (CT-1, CT-2, LVT-1, EP-1, V-1) for different areas of the facility, with some existing flooring marked to remain unchanged. The plan is drawn at a scale of 1/8" = 1'-0" and was updated for RFP release on December 19, 2024. The document demonstrates the comprehensive nature of the flooring renovation work required as part of the larger facility improvement project, which will need to be coordinated while maintaining operational status of the shelter.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REMOVE EXISTING KITCHEN FLOORING. PREP CONCRETE

SLAB AS REQUIRED FOR NEW FLOORING. INSTALL NEW

EPOXY FLOORING IN KITCHEN WITH 6” COVED BASE. THE

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

DISCONNECTING, MOVING, REPLACING, AND

RECONNECTING THE KITCHEN EQUIPMENT, PLUMBING

FIXTURES, ETC.

REMOVE EXISTING FLOORING AND BASE. PREP

CONCRETE SLAB AS REQUIRED FOR NEW

FLOORING. INSTALL NEW L.V.T. (GLUE-DOWN).

INSTALL NEW 6” VINYL BASE. TYP.

REMOVE EXISTING FLOORING AND BASE. PREP

CONCRETE SLAB AS REQUIRED FOR NEW

FLOORING. INSTALL NEW L.V.T. (GLUE-DOWN).

INSTALL NEW 6” VINYL BASE. TYP.

REMOVE EXISTING FLOORING AND

BASE. PREP CONCRETE SLAB AS

REQUIRED FOR NEW FLOORING.

INSTALL NEW L.V.T. (GLUE-DOWN).

INSTALL NEW 6” VINYL BASE. TYP.

REMOVE EXISTING FLOORING AND BASE.

PREP CONCRETE SLAB AS REQUIRED FOR

NEW FLOORING. INSTALL NEW CARPET TILE

PER SPECIFICATION. INSTALL NEW 6”

VINYL BASE. TYP.

REMOVE EXISTING FLOORING AND BASE. PREP

CONCRETE SLAB AS REQUIRED FOR NEW

FLOORING. INSTALL NEW L.V.T. (GLUE-DOWN).

INSTALL NEW 6” VINYL BASE. TYP.

REMOVE EXISTING FLOORING. PREP

CONCRETE SLAB AS REQUIRED FOR

NEW FLOORING. INSTALL NEW SHEET

VINYL FLOORING PER SPEC, WITH 6”

COVED BASE. THE GENERAL

CONTRACTOR SHALL BE RESPONSIBLE

FOR DISCONNECTING, MOVING,

REPLACING, AND RECONNECTING THE

LAUNDRY EQUIPMENT, ETC.REMOVE EXISTING FLOORING AND BASE.

PREP CONCRETE SLAB AS REQUIRED FOR

NEW FLOORING. INSTALL NEW CARPET TILE

PER SPECIFICATION. INSTALL NEW 6”

VINYL BASE. TYP.

EXISTING FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAIN EXISTING

FLOORING

TO REMAIN

EXISTING

FLOORING

TO REMAIN

EXISTING

FLOORING

TO REMAIN

EXISTING

FLOORING

TO REMAIN

EXISTING

FLOORING

TO REMAIN

EXISTING

FLOORING

TO REMAIN

EXISTING

FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAINEXISTING FLOORING

TO REMAIN

EXISTING FLOORING

TO REMAIN

CT-1

CT-1CT-1

CT-2

CT-1

CT-1CT-1CT-1CT-1CT-1

CT-1

CT-1CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

CT-1

REMOVE EXISTING FLOORING AND

BASE. PREP CONCRETE SLAB AS

REQUIRED FOR NEW FLOORING.

INSTALL NEW WALK-OFF CARPET

TILE PER SPECIFICATION. INSTALL

NEW 6” VINYL BASE. TYP.

V-1

EP-1

LVT-1

LVT-1

LVT-1

LVT-1LVT-1

LVT-1LVT-1

LVT-1LVT-1

LVT-1LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1

LVT-1 LVT-1 LVT-1 LVT-1 LVT-1 LVT-1

LVT-1

LVT-1LVT-1LVT-1 LVT-1 LVT-1

LVT-1

LVT-1

LVT-1 LVT-1

LVT-1

LVT-1

CT-2

CT-2

CT-2

REMOVE EXISTING FLOORING AND

BASE. PREP CONCRETE SLAB AS

REQUIRED FOR NEW FLOORING.

INSTALL NEW WALK-OFF CARPET

TILE PER SPECIFICATION. INSTALL

NEW 6” VINYL BASE. TYP.

REMOVE EXISTING FLOORING AND

BASE. PREP CONCRETE SLAB AS

REQUIRED FOR NEW FLOORING.

INSTALL NEW WALK-OFF CARPET

TILE PER SPECIFICATION. INSTALL

NEW 6” VINYL BASE. TYP.

REMOVE EXISTING

FLOORING AND BASE.

PREP CONCRETE SLAB

AS REQUIRED FOR NEW

FLOORING. INSTALL

NEW WALK-OFF CARPET

TILE PER

SPECIFICATION. INSTALL

NEW 6” VINYL BASE.

TYP.

REMOVE EXISTING CARPET. PREP

CONCRETE SLAB AS REQUIRED FOR

NEW FLOORING. INSTALL NEW SHEET

VINYL FLOORING PER SPEC, WITH 6”

COVED BASE.

WELD NEW VINYL FLOORING TO

EXISTING

REMOVE EXISTING FLOORING. PREP

CONCRETE SLAB AS REQUIRED FOR

NEW FLOORING. INSTALL NEW EPOXY

FLOORING WITH 6” COVED BASE.

project name

12815 NE 126th Place, Kirkland, WA 98034 t.425.747.3177 www.mlarch.com

UNPUBLISHED WORK

© 2024 MERRICK LENTZ ARCHITECT

Unauthorized use or reproduction of these drawings or any part herein without the permission of

Merrick Lentz Architect is not permitted consultant stamp descriptionissued date checked by drawn by CSC drawing title

MDL

design development

11/18/24 RFP SET

Simonka Place Union Gospel Mission

5119 River Road North Keizer, OR 97303

Addition and

Interior Alteration

12/19/24 UPDATED RFP SET

SCALE: 1/8" = 1'-0"

FLOOR FINISH PLAN

A2.3

FLOOR FINISH

PLAN

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .