This is a floor finish plan drawing (A2.3) for the Union Gospel Mission's Simonka Place renovation project in Keizer, Oregon, prepared by Merrick Lentz Architect. The plan details extensive flooring replacements throughout the facility, specifying different flooring materials including luxury vinyl tile (LVT), carpet tile, sheet vinyl, epoxy flooring, and walk-off carpet tile installations. The scope includes removing existing flooring, preparing concrete slabs, and installing new 6" vinyl or coved base throughout various areas. The kitchen and laundry areas require special attention, with the general contractor responsible for disconnecting, moving, replacing, and reconnecting equipment during flooring installation.
The drawing indicates specific material designations (CT-1, CT-2, LVT-1, EP-1, V-1) for different areas of the facility, with some existing flooring marked to remain unchanged. The plan is drawn at a scale of 1/8" = 1'-0" and was updated for RFP release on December 19, 2024. The document demonstrates the comprehensive nature of the flooring renovation work required as part of the larger facility improvement project, which will need to be coordinated while maintaining operational status of the shelter.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REMOVE EXISTING KITCHEN FLOORING. PREP CONCRETE
SLAB AS REQUIRED FOR NEW FLOORING. INSTALL NEW
EPOXY FLOORING IN KITCHEN WITH 6” COVED BASE. THE
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
DISCONNECTING, MOVING, REPLACING, AND
RECONNECTING THE KITCHEN EQUIPMENT, PLUMBING
FIXTURES, ETC.
REMOVE EXISTING FLOORING AND BASE. PREP
CONCRETE SLAB AS REQUIRED FOR NEW
FLOORING. INSTALL NEW L.V.T. (GLUE-DOWN).
INSTALL NEW 6” VINYL BASE. TYP.
REMOVE EXISTING FLOORING AND BASE. PREP
CONCRETE SLAB AS REQUIRED FOR NEW
FLOORING. INSTALL NEW L.V.T. (GLUE-DOWN).
INSTALL NEW 6” VINYL BASE. TYP.
REMOVE EXISTING FLOORING AND
BASE. PREP CONCRETE SLAB AS
REQUIRED FOR NEW FLOORING.
INSTALL NEW L.V.T. (GLUE-DOWN).
INSTALL NEW 6” VINYL BASE. TYP.
REMOVE EXISTING FLOORING AND BASE.
PREP CONCRETE SLAB AS REQUIRED FOR
NEW FLOORING. INSTALL NEW CARPET TILE
PER SPECIFICATION. INSTALL NEW 6”
VINYL BASE. TYP.
REMOVE EXISTING FLOORING AND BASE. PREP
CONCRETE SLAB AS REQUIRED FOR NEW
FLOORING. INSTALL NEW L.V.T. (GLUE-DOWN).
INSTALL NEW 6” VINYL BASE. TYP.
REMOVE EXISTING FLOORING. PREP
CONCRETE SLAB AS REQUIRED FOR
NEW FLOORING. INSTALL NEW SHEET
VINYL FLOORING PER SPEC, WITH 6”
COVED BASE. THE GENERAL
CONTRACTOR SHALL BE RESPONSIBLE
FOR DISCONNECTING, MOVING,
REPLACING, AND RECONNECTING THE
LAUNDRY EQUIPMENT, ETC.REMOVE EXISTING FLOORING AND BASE.
PREP CONCRETE SLAB AS REQUIRED FOR
NEW FLOORING. INSTALL NEW CARPET TILE
PER SPECIFICATION. INSTALL NEW 6”
VINYL BASE. TYP.
EXISTING FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAIN EXISTING
FLOORING
TO REMAIN
EXISTING
FLOORING
TO REMAIN
EXISTING
FLOORING
TO REMAIN
EXISTING
FLOORING
TO REMAIN
EXISTING
FLOORING
TO REMAIN
EXISTING
FLOORING
TO REMAIN
EXISTING
FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAINEXISTING FLOORING
TO REMAIN
EXISTING FLOORING
TO REMAIN
CT-1
CT-1CT-1
CT-2
CT-1
CT-1CT-1CT-1CT-1CT-1
CT-1
CT-1CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
CT-1
REMOVE EXISTING FLOORING AND
BASE. PREP CONCRETE SLAB AS
REQUIRED FOR NEW FLOORING.
INSTALL NEW WALK-OFF CARPET
TILE PER SPECIFICATION. INSTALL
NEW 6” VINYL BASE. TYP.
V-1
EP-1
LVT-1
LVT-1
LVT-1
LVT-1LVT-1
LVT-1LVT-1
LVT-1LVT-1
LVT-1LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1
LVT-1 LVT-1 LVT-1 LVT-1 LVT-1 LVT-1
LVT-1
LVT-1LVT-1LVT-1 LVT-1 LVT-1
LVT-1
LVT-1
LVT-1 LVT-1
LVT-1
LVT-1
CT-2
CT-2
CT-2
REMOVE EXISTING FLOORING AND
BASE. PREP CONCRETE SLAB AS
REQUIRED FOR NEW FLOORING.
INSTALL NEW WALK-OFF CARPET
TILE PER SPECIFICATION. INSTALL
NEW 6” VINYL BASE. TYP.
REMOVE EXISTING FLOORING AND
BASE. PREP CONCRETE SLAB AS
REQUIRED FOR NEW FLOORING.
INSTALL NEW WALK-OFF CARPET
TILE PER SPECIFICATION. INSTALL
NEW 6” VINYL BASE. TYP.
REMOVE EXISTING
FLOORING AND BASE.
PREP CONCRETE SLAB
AS REQUIRED FOR NEW
FLOORING. INSTALL
NEW WALK-OFF CARPET
TILE PER
SPECIFICATION. INSTALL
NEW 6” VINYL BASE.
TYP.
REMOVE EXISTING CARPET. PREP
CONCRETE SLAB AS REQUIRED FOR
NEW FLOORING. INSTALL NEW SHEET
VINYL FLOORING PER SPEC, WITH 6”
COVED BASE.
WELD NEW VINYL FLOORING TO
EXISTING
REMOVE EXISTING FLOORING. PREP
CONCRETE SLAB AS REQUIRED FOR
NEW FLOORING. INSTALL NEW EPOXY
FLOORING WITH 6” COVED BASE.
project name
12815 NE 126th Place, Kirkland, WA 98034 t.425.747.3177 www.mlarch.com
UNPUBLISHED WORK
© 2024 MERRICK LENTZ ARCHITECT
Unauthorized use or reproduction of these drawings or any part herein without the permission of
Merrick Lentz Architect is not permitted consultant stamp descriptionissued date checked by drawn by CSC drawing title
MDL
design development
11/18/24 RFP SET
Simonka Place Union Gospel Mission
5119 River Road North Keizer, OR 97303
Addition and
Interior Alteration
12/19/24 UPDATED RFP SET
SCALE: 1/8" = 1'-0"
FLOOR FINISH PLAN
A2.3
FLOOR FINISH
PLAN