pre-bid conf agenda.pdf

PDF 62 KB Posted

Attached to
Union Gospel Mission - Construction Services at Simonka Place Women's Shelter
Solicitation number
S-C25102-00012036
Issued by
Marion County, Junction City, Oregon

About this file

This is a pre-proposal conference agenda for the Union Gospel Mission (UGM) Simonka Place Women's Shelter in Keizer, Oregon, outlining the schedule for preconstruction and construction services walk-through meetings. The document details two potential tour iterations scheduled for December 11, 2024, at 5119 River Rd N. The first iteration runs from 11:00 AM to 1:00 PM, including a welcome session, scope of work review, facility walk-through, and a question period. A second iteration tour, if needed, is scheduled from 1:00 PM to 3:00 PM, following a similar format but with the addition of prayer/introductions and plans review, plus a walk-through conducted in two separate groups.

The document does not contain specific pricing terms, funding details, or set-aside requirements. However, it is part of a larger procurement for design-build contracting services for a comprehensive renovation project that includes a facility expansion, sleeping room modifications, and various improvements. The project involves federal HOME-ARP grant funding through Marion County and is subject to Davis-Bacon Act and BOLI prevailing wage requirements.

View the file

Other files

File Type Posted
OregonBuys Posting Page for UGM.pdf PDF
UGM Simonka_A4.1 SECTIONS_12.19.24.pdf PDF
UGM Simonka_A1.1 SITE PLAN_12.19.24.pdf PDF
UGM Simonka_AD2.1 DEMO FLOOR PLAN_12.19.24.pdf PDF
Addendum 2~1.pdf PDF
RFP UGM Simonka 2025 Remodel RFP 112524 F.pdf PDF
UGM Simonka_A2.6 WALL SCHEDULES_12.19.24.pdf PDF
UGM Simonka_AD3.1 DEMO ELEVATIONS_12.19.24.pdf PDF
SP - Attendance - Tours for Bidding_.docx DOCX document
UGM Simonka_A2.1 FLOOR PLAN_12.19.24.pdf PDF
UGM Simonka_A3.2_Elevations_11.19.24.pdf PDF
Medical Examiner Request for Proposals.pdf PDF
UGM Simonka_A2.3 FLOOR FINISH PLAN_12.19.24.pdf PDF
Findings for Design Build Exemption Jan 23 2025.pdf PDF
UGM Simonka_A5.1 SECTIONS_12.19.24.pdf PDF
Notice of Intent to Award~16.pdf PDF
UGM Simonka RFP Pre-Bid Questions_Final.pdf PDF
UGM Simonka RFP Pre-Bid Questions.pdf PDF
UGM Simonka_AD3.2 DEMO ELEVATIONS_12.19.24.pdf PDF
Q and A #1 Dec10-2024~1.pdf PDF
Addendum1.pdf PDF
UGM Simonka_A2.2.1 CEILING DETAILS_12.19.24.pdf PDF
UGM Simonka_A2.2 CEILING PLAN_12.19.24.pdf PDF
UGM Simonka_RFP SET REV1_12.19.24.pdf PDF
UGM Simonka_A3.1 ELEVATIONS_12.19.24.pdf PDF
UGM Simonka_A3.2 ELEVATIONS_12.19.24.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Union Gospel Mission (UGM) Simonka Place Women’s Shelter Request for Proposal

PRECONSTRUCTION SERVICES

CONSTRUCTION SERVICES

Pre-Proposal Conference/Walk thru 5119 River Rd N, Keizer, OR 97303

December 11, 2024

Tentative Schedule

1st Iteration Tour -

11 am Welcome

1110 am Review of Scope of Work

1130 – 1230 Walk-Thru

1230 – 1 pm Questions

2nd Iteration Tour – (If Needed)

1:00 pm Welcome/Prayer/Introductions

1:10 – 1:30 Scope of Work/Review Plans

1:30 – 2:30 Walk-Thru 2 groups led by:

2:30 – 3:00 Questions

3 pm Closing of Pre-Bid/Walk-Thru

File details come from the government source that posted it. Updated .