About this file

This is a Task Group Instruction (TGI) for maintenance work on the USS Rafael Peralta (DDG-115). The document provides detailed instructions for replacing rope staples on a life raft cradle located at 02 Level Weather, Frames 166-169, Port side of the vessel.

The work scope includes removing, storing, and reinstalling four (4) MK-7 inflatable life rafts with 25-passenger capacity; removing and fabricating two (2) new rope staples constructed of CRES 316 material (3/8 inch diameter round bar per QQ-S-763 specification); drilling inspection holes and accomplishing build-up welds on the existing support structure; and applying surface preservation treatments to affected areas per referenced specifications. The contractor work is scheduled to commence on 7/27/2026 and be completed by 9/4/2026. Supporting work, including removal and installation of rubber tile on the cradle, will be covered under separate TGIs (38K6158301U01 and 38K6158301R01). The instruction references design drawings DWG 583-6220293 and DWG 600-7026484, along with NAVSEA standard items and local standard items. Government-furnished materials will be provided by SRF-JRMC, which will also supply crane services, utility support (electrical, low-pressure air, water, and steam), and safety/gas-free inspections for employees. Material required includes 10 feet of CRES 316 bar stock ordered for the contractor. The document was prepared and approved on 13-NOV-2025 by Code 231B personnel.

View the file

Other files

File Type Posted
TGI_38K6112304A01_c0v0_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV2.pdf PDF
TGI_38K6154101A01_c1v1_REV2.pdf PDF
TGI_38K6112320A01_c1v1_REV2.pdf PDF
TGI_38K6112001A01_c0v0_REV2.pdf PDF
TGI_38K6112301A01_c0v0_REV1.pdf PDF
TGI_38K6112305A01_c1v0_REV1.pdf PDF
TGI_38K6112304A01_c0v0_REV1.pdf PDF
TGI_38K6112316A01_c0v0_REV1.pdf PDF
TGI_38K6171101A01_c0v0_REV1.pdf PDF
TGI_38K6169901A01_c0v0_REV1.pdf PDF
TGI_38K6154101A01_c1v1_REV1.pdf PDF
7027318_53711_-_0001_ G_-_0001.pdf PDF
MP LM19-K6112303-ES01NA54_r3.pdf PDF
TGI_38K6113702A01_c0v0_REV1.pdf PDF
TGI_38K6112303A01_c0v0_REV1.pdf PDF
TGI_38K6113601A01_c0v0_REV1.pdf PDF
TGI_38K6113602A01_c0v0_REV1.pdf PDF
TGI_38K6112325A01_c0v0_REV1.pdf PDF
TGI_38K6154103A02_c0v0_REV1.pdf PDF
TGI_38K6144104A01_c0v0_REV1.pdf PDF
TGI_38K6151101A01_c0v0_REV1.pdf PDF
material info.pdf PDF
6220213_53711_-_0001_ R_-_0001.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
TGI_38K6151101A01_c0v0.pdf PDF
TGI_38K6113702A01_c0v0.pdf PDF
TGI_38K6113601A01_c0v0.pdf PDF
TGI_38K6113602A01_c0v0.pdf PDF
TGI_38K6112303A01_c0v0.pdf PDF
TGI 38K6169901A01_c0v0.pdf PDF
TGI_38K6112316A01_c0v0.pdf PDF
TGI_38K6112306A01_c0v1.pdf PDF
TGI_38K6112321A01_c0v0.pdf PDF
Attachment VII QSAP.pdf PDF
Exhibit A CDRL - GFM.pdf PDF
Attachment V Source of Repair Instruction.pdf PDF
TGI_38K6154103A02_c0v0.pdf PDF
TGI_38K6112301A01_c0v0.pdf PDF
TGI_38K6112317A01_c0v0.pdf PDF
TGI_38K6112304A01_c0v0.pdf PDF
TGI 38K6152101A02_c0v0.pdf PDF
TGI 38K6154101A01_c1v1.pdf PDF
TGI 38K6165401A01_c0v0.pdf PDF
TGI 38K6164401A01_c1v2.pdf PDF
TGI 38K6154101T02_c0v0.pdf PDF
Attachment IV DDG-115_BUNDLE1_GFP_List.xlsx XLSX spreadsheet
Attachment VIII Contract data.pdf PDF
Solicitation - N6264926RA036.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

22-JAN-2026 1112

20.15.6.0.9333 (July 2025) ICN: 38K6158301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CRADEL FR 165 P AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - REPLACE ROPE STAPLE ON LIFE RAFT CRADLE IN 02 LVL WEA, FR 166 - 169, PORT

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

OD011127

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SUZUKI, TOORU 231B 3152437793 13-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 13-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

OD01-1127

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

583A2101

1. SCOPE/PURPOSE:

1.1 Title: Rope Staple on Life Raft Cradle in 02 Level Weather, Frames between 166 and 169, Port; replace

1.2 Location of Work:

1.2.1 02 Level Weather, Frames between 165 and 175, Port

1.2.2 03 Level Weather, Frames between 165 and 175, Port

1.3 Identification:

1.3.1 Quantity (4 EA), Life Raft in 02 Level Weather, Frames between 165 and 175, Port

Type: MK-7, Inflatable Capacity: 25-passenger

TGI Short Form

22-JAN-2026 1112

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6158301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CRADEL FR 165 P AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - REPLACE ROPE STAPLE ON LIFE RAFT CRADLE IN 02 LVL WEA, FR 166 - 169, PORT

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (2 EA), Rope Staple on Support of Life Raft Cradle in 02 Level Weather, Frames between 166 and 169, Port, Lower

Material: CRES 316, QQ-S-763, 3/8 Inch Diameter Round Bar Remarks: See Sheet 17B Detail 17B-A, Detail 17B-E, and Section 17B-B of Ref. No. 3 and Ref. No. 4 for detail and

Sketch Enclosure-01 for location detail

1.3.3 Quantity (2 SF), Life Raft Cradle in 02 Level Weather, Frames between 166 and 169, Port, Lower

Remarks: The area where rubber tile is installed.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Remove, store, and reinstall each life raft listed in 1.3.1 for structure work and preservation work.

2.2 Remove existing, fabricate and install new each rope staple listed in 1.3.2 in accordance with Ref. No. 3, using Ref. No.4 for guidance.

2.2.1 Drill hole(s) on the existing support for gas free inspection.

2.2.2 Accomplish build up weld of the remaining hole(s) on the support, using Ref. No. 3 for guidance.

2.2.3 Accomplish the requirements of 009-012 of Ref. No. One, including Table 2, Column(s) D, Lines One through 7.

2.3 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) 46, for each area listed in 1.3.3.

2.4 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.5 Notes:

2.5.1 Planner: Code 231B T. Suzuki, 243-7793

2.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.5.3 Removal and installation of rubber tile on cradle will be covered by TGI No(s). 38K6158301U01 and 38K6158301R01

(SRF-JRMC TGI).

2.5.4 JCN OD01-1127 is related to this TGI.

2.6 Government Furnished Material (GFM):

Kouichi.Yoshida.ja Typewritten Text 7/27/2026

Kouichi.Yoshida.ja Typewritten Text 9/4/2026

22-JAN-2026 1112

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6158301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CRADEL FR 165 P AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - REPLACE ROPE STAPLE ON LIFE RAFT CRADLE IN 02 LVL WEA, FR 166 - 169, PORT

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.6.1 SRF-JRMC will provide GFM listed in the Material List.

2.7 SRF-JRMC will provide the following service work: (TGI No. 38K6158301S02).

2.7.1 [C740] Crane and crane rigging service.

2.7.2 [X99E] Utility service, electrical.

2.7.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.7.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.7.6 [C133] Provide QA inspection for (G) symbol(s).

22-JAN-2026 1112

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6158301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CRADEL FR 165 P AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - REPLACE ROPE STAPLE ON LIFE RAFT CRADLE IN 02 LVL WEA, FR 166 - 169, PORT

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 DWG 583-6220293 DDG51 CLASS FAB OF INFL

BOAT STWG FTG

AG Y 17B

,17 D

4 DWG 600-7026484 HULL OUTFIT INSTL DSGN

ZN 4220 02 LVL FR 126-174

R Y 4A B,3 C1

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M BAR,META, ORDERED FOR

KTR

ORIG: C231B T. SUZUKI 243-

9B 9510 001890617 NA 4 N 53175658 10/FT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K6158301A01-Sketch.pdf 13-NOV-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6158301 KEY OP: A01

Tooru.Suzuki2.ja Line

Tooru.Suzuki2.ja_1 Line

Tooru.Suzuki2.ja_2 Text Box

FR 169

Tooru.Suzuki2.ja_3 Text Box

FR 166

Tooru.Suzuki2.ja_4 Polygon

Tooru.Suzuki2.ja_5 Text Box

FWD

Tooru.Suzuki2.ja_6 Line

Tooru.Suzuki2.ja_7 Line

Tooru.Suzuki2.ja_8 Oval

Tooru.Suzuki2.ja_9 Line

Tooru.Suzuki2.ja_10 Rectangle

Tooru.Suzuki2.ja_11 Oval

Tooru.Suzuki2.ja_12 Oval

Tooru.Suzuki2.ja_13 Line

Tooru.Suzuki2.ja_14 Line

Tooru.Suzuki2.ja_15 Text Box Rope Staple (2 EA)

Tooru.Suzuki2.ja_16 Rectangle

Tooru.Suzuki2.ja_17 Rectangle

Tooru.Suzuki2.ja_18 Rectangle

Tooru.Suzuki2.ja_19 Text Box

PLAN VIEW

Tooru.Suzuki2.ja_20 Text Box

02 LVL FR 126 - 175, PORT

Tooru.Suzuki2.ja_21 Line

Tooru.Suzuki2.ja_22 Text Box

LOCATION OF ROPE STAPLE

Tooru.Suzuki2.ja_23 Text Box

ENCLOSURE-01

Tooru.Suzuki2.ja_24 Text Box

SKETCH

Tooru.Suzuki2.ja_25 Text Box 38K6158301A01

Tooru.Suzuki2.ja_26 Text Box

SHEET 1 OF 1

Tooru.Suzuki2.ja_27 Line

Tooru.Suzuki2.ja_28 Text Box

WARDROOM MESSROOM AND LOUNGE

02-126-4-L

Tooru.Suzuki2.ja_29 Text Box

WARDROOM

GALLEY

02-158-4-Q

Tooru.Suzuki2.ja_30 Text Box

PASSAGE

02-167-2-L

Tooru.Suzuki2.ja_31 Line

File details come from the government source that posted it. Updated .