SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | | N6264926RA036 | CLIN 0001(31 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| SHIP NAME: | | USS RAFAEL PERALTA (DDG-115) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| AVAILABILITY: | | USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 31 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 9.45% | | |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | | | | | | | | | |
| No. | TGI No. | DESCRIPTION | Proposed Labor | | | | Material/ODCs | | Proposed Price (JPY) |
| | | | In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | |
| 1 | 38K6112001-A01 | Scaffolding for Ship Repair and SRF-JRMC Work for FREEBD WEA & 1-304-2-M; install and remove | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38K6112301-A01 | FWD Uptake Space; repair | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38K6112303-A01 | Incompleted Weld of Bimetallic Transition Joint for Engine Removal Rail in 02-174-1-Q; | | | | | | | |
| repair | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 4 | 38K6112304-A01 | 1A Gas Turbine Module (GTM) Moisture Separator Bonding Strap; install | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38K6112305-A01 | Watertight Hatch 02-324-3; overhaul | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38K6112306-A01 | Watertight Door 03-178-1; replace | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38K6112316-A01 | No. 3 Ship’s Service Gas Turbine Generator (SSGTG) Intake and Exhaust Trunk; preserve | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 38K6112317-A01 | Hook Assembly for Louver Door of No. 3 Ship Service Gas Turbine Generator (SSGTG) | | | | | | | |
| Intake; install | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 9 | 38K6112318-A01 | Placard to FWD and AFT Gas Turbine Module (GTM) and Ship Service Gas Turbine | | | | | | | |
| Generator (SSGTG) Intake Moisture Separator/Blow in Door (BID) Flame; install | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 10 | 38K6112320-A01 | Packing Assembly of Stuffing Tube for Cable Assembly, Fuel Tank Level Indicator | | | | | | | |
| System for Tank Group-5; replace | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 11 | 38K6112321-A01 | Inspection, Repair, and Preservation of IRS Eductor Secondary Air Inlet Trunk; accomplish | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 38K6112325-A01 | Replacement of Watertight Door 01-240-1 and Repair of Defect on Collar Plate, | | | | | | | |
| Stuffing Tube, and 02 Level Deck Plating in 01-240-1-A; accomplish | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 13 | 38K6113601-A01 | Preservation of Vent Hood and Replacement of Weather Screen in 01 Level Weather | | | | | | | |
| Frame 240; accomplish | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 14 | 38K6113602-A01 | Bulkhead Plating and Antenna 2-4 Platform, between 01 Level and 05 Level Weather, | | | | | | | |
| Frames between 202 and 247, Port and Starboard (Stbd); preserve | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 15 | 38K6113701-A01 | Replacement of Nonskid System, Preservation of Stanchion, and Installation of | | | | | | | |
| Equipment on 02 Level Weather; accomplish | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 16 | 38K6113702-A01 | Forward Exhaust Stack and Sloping Transverse Bulkhead in 03 Level Weather, | | | | | | | |
| Frames between 174 and 178, Port and Starboard (Stbd); preserve | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 17 | 38K6113801-A01 | Replacement of Peel and Stick Nonskid System and Inspection, Repair, and | | | | | | | |
| Preservation of 03 Level Weather, Deck Plating; accomplish | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 18 | 38K6144104-A01 | Bond Strap of AM-7641A/U Amplifier Filter Unit No. One for AS-4679/U Antenna 3-10B; | | | | | | | |
| replace | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 19 | 38K6145601-A01 | Scaffolding for Ship Repair Facility and SRF-JRMC Work for AS-3851/SPY-1D ANT ARRAY; install and remove | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 38K6151101-A01 | Scaffolding for Ship Repair Facility and SRF-JRMC Work for 01-205-0-Q; install and remove | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | 38K6152101-A02 | Scaffolding for Ship Repair Facility and SRF-JRMC Work for ZONE-2 CMWD SYS PIPING; install and remove | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 22 | 38K6154101-A01 | Panel of Blast Shield and Bonding Assembly of Kingpost for Fueling At Sea (FAS) | | | | | | | |
| Station No. 7 in 02 Level Weather, Starboard (Stbd); replace | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 23 | 38K6154101-T01 | Tightness & Operational Test for Fuel Transfer System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 24 | 38K6154101-T02 | Tightness & Operational Test for JP-5 System | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 25 | 38K6154103-A02 | Fuel Tank Group-5 and Group-6; dewater | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 26 | 38K6158301-A01 | Rope Staple on Life Raft Cradle in 02 Level Weather, Frames between 166 and 169, | | | | | | | |
| Port; replace | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 27 | 38K6164401-A01 | Transverse Bulkhead Plate Frame 338 in 3-338-10-L; repair | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 28 | 38K6165401-A01 | Shore Power Cover on 01 Weather, Frame 240, Port and Starboard; repair | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 29 | 38K6169901-A01 | Bonding Strap Assembly for Inclined Ladder in 02 and 03 Level Weather, | | | | | | | |
| Port; replace | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 30 | 38K6171101-A01 | Nonskid System on Train Platform and Mounting Plate of AFT Close In Weapon | | | | | | | |
| System (CIWS); replace | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | | |
| 31 | 38K6186301-A01 | KTR Service Work for Temporary Utility Service; provide | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 32 | | | | | | | | | |
| 33 | | | | | | | | | |
| 34 | | | | | | | | | |
| 35 | | | | | | | | | |
| 36 | | | | | | | | | |
| 37 | | | | | | | | | |
| 38 | | | | | | | | | |
| 39 | | | | | | | | | |
| 40 | | | | | | | | | |
| 41 | | | | | | | | | |
| 42 | | | | | | | | | |
| 43 | | | | | | | | | |
| 44 | | | | | | | | | |
| 45 | | | | | | | | | |
| 46 | | | | | | | | | |
| 47 | | | | | | | | | |
| 48 | | | | | | | | | |
| 49 | | | | | | | | | |
| 50 | | | | | | | | | |
| 51 | | | | | | | | | |
| 52 | | | | | | | | | |
| 53 | | | | | | | | | |
| 54 | | | | | | | | | |
| 55 | | | | | | | | | |
| 56 | | | | | | | | | |
| 57 | | | | | | | | | |
| 58 | | | | | | | | | |
| 59 | | | | | | | | | |
| 60 | | | | | | | | | |
| 61 | | | | | | | | | |
| 62 | | | | | | | | | |
| 63 | | | | | | | | | |
| 64 | | | | | | | | | |
| 65 | | | | | | | | | |
| 66 | | | | | | | | | |
| 67 | | | | | | | | | |
| 68 | | | | | | | | | |
| 69 | | | | | | | | | |
| 70 | | | | | | | | | |
| 71 | | | | | | | | | |
| 72 | | | | | | | | | |
| 73 | | | | | | | | | |
| 74 | | | | | | | | | |
| 75 | | | | | | | | | |
| 76 | | | | | | | | | |
| 77 | | | | | | | | | |
| 78 | | | | | | | | | |
| 79 | | | | | | | | | |
| 80 | | | | | | | | | |
| 81 | | | | | | | | | |
| 82 | | | | | | | | | |
| 83 | | | | | | | | | |
| 84 | | | | | | | | | |
| 85 | | | | | | | | | |
| 86 | | | | | | | | | |
| 87 | | | | | | | | | |
| 88 | | | | | | | | | |
| 89 | | | | | | | | | |
| 90 | | | | | | | | | |
| 91 | | | | | | | | | |
| 92 | | | | | | | | | |
| 93 | | | | | | | | | |
| 94 | | | | | | | | | |
| 95 | | | | | | | | | |
| 96 | | | | | | | | | |
| 97 | | | | | | | | | |
| 98 | | | | | | | | | |
| 99 | | | | | | | | | |
| 100 | | | | | | | | | |
| 101 | | | | | | | | | |
| 102 | | | | | | | | | |
| 103 | | | | | | | | | |
| 104 | | | | | | | | | |
| 105 | | | | | | | | | |
| 106 | | | | | | | | | |
| 107 | | | | | | | | | |
| 108 | | | | | | | | | |
| 109 | | | | | | | | | |
| 110 | | | | | | | | | |
| 111 | | | | | | | | | |
| 112 | | | | | | | | | |
| 113 | | | | | | | | | |
| 114 | | | | | | | | | |
| 115 | | | | | | | | | |
| 116 | | | | | | | | | |
| 117 | | | | | | | | | |
| 118 | | | | | | | | | |
| 119 | | | | | | | | | |
| 120 | | | | | | | | | |
| 121 | | | | | | | | | |
| 122 | | | | | | | | | |
| 123 | | | | | | | | | |
| 124 | | | | | | | | | |
| 125 | | | | | | | | | |
| 126 | | | | | | | | | |
| 127 | | | | | | | | | |
| 128 | | | | | | | | | |
| 129 | | | | | | | | | |
| 130 | | | | | | | | | |
| 131 | | | | | | | | | |
| 132 | | | | | | | | | |
| 133 | | | | | | | | | |
| 134 | | | | | | | | | |
| 135 | | | | | | | | | |
| 136 | | | | | | | | | |
| 137 | | | | | | | | | |
| 138 | | | | | | | | | |
| 139 | | | | | | | | | |
| 140 | | | | | | | | | |
| 141 | | | | | | | | | |
| 142 | | | | | | | | | |
| 143 | | | | | | | | | |
| 144 | | | | | | | | | |
| 145 | | | | | | | | | |
| 146 | | | | | | | | | |
| 147 | | | | | | | | | |
| 148 | | | | | | | | | |
| 149 | | | | | | | | | |
| 150 | | | | | | | | | |
| 151 | | | | | | | | | |
| 152 | | | | | | | | | |
| 153 | | | | | | | | | |
| 154 | | | | | | | | | |
| 155 | | | | | | | | | |
| 156 | | | | | | | | | |
| 157 | | | | | | | | | |
| 158 | | | | | | | | | |
| 159 | | | | | | | | | |
| 160 | | | | | | | | | |
| 161 | | | | | | | | | |
| 162 | | | | | | | | | |
| 163 | | | | | | | | | |
| 164 | | | | | | | | | |
| 165 | | | | | | | | | |
| 166 | | | | | | | | | |
| 167 | | | | | | | | | |
| 168 | | | | | | | | | |
| 169 | | | | | | | | | |
| 170 | | | | | | | | | |
| 171 | | | | | | | | | |
| 172 | | | | | | | | | |
| 173 | | | | | | | | | |
| 174 | | | | | | | | | |
| 175 | | | | | | | | | |
| 176 | | | | | | | | | |
| 177 | | | | | | | | | |
| 178 | | | | | | | | | |
| 179 | | | | | | | | | |
| 180 | | | | | | | | | |
| 181 | | | | | | | | | |
| 182 | | | | | | | | | |
| 183 | | | | | | | | | |
| 184 | | | | | | | | | |
| 185 | | | | | | | | | |
| 186 | | | | | | | | | |
| 187 | | | | | | | | | |
| 188 | | | | | | | | | |
| 189 | | | | | | | | | |
| 190 | | | | | | | | | |
| 191 | | | | | | | | | |
| 192 | | | | | | | | | |
| 193 | | | | | | | | | |
| 194 | | | | | | | | | |
| 195 | | | | | | | | | |
| 196 | | | | | | | | | |
| 197 | | | | | | | | | |
| 198 | | | | | | | | | |
| 199 | | | | | | | | | |
| 200 | | | | | | | | | |
1_38K6112001-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 1_38K6112001-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 1_38K6112001-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
HOURS
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38K6112301-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 2_38K6112301-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 2_38K6112301-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | FWD Uptake Space; repair | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38K6112303-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 3_38K6112303-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 3_38K6112303-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Incompleted Weld of Bimetallic Transition Joint for Engine Removal Rail in 02-174-1-Q; repair | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38K6112304-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 4_38K6112304-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 4_38K6112304-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | 1A Gas Turbine Module (GTM) Moisture Separator Bonding Strap; install | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38K6112305-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 5_38K6112305-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 5_38K6112305-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Watertight Hatch 02-324-3; overhaul | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_38K6112306-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 6_38K6112306-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 6_38K6112306-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Watertight Door 03-178-1; replace | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_38K6112316-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 7_38K6112316-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 7_38K6112316-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | No. 3 Ship’s Service Gas Turbine Generator (SSGTG) Intake and Exhaust Trunk; preserve | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_38K6112317-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 8_38K6112317-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 8_38K6112317-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Hook Assembly for Louver Door of No. 3 Ship Service Gas Turbine Generator (SSGTG) Intake; install | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_38K6112318-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 9_38K6112318-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 9_38K6112318-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Placard to FWD and AFT Gas Turbine Module (GTM) and Ship Service Gas Turbine Generator (SSGTG) Intake Moisture Separator/Blow in Door (BID) Flame; install | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_38K6112320-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 10_38K6112320-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 10_38K6112320-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Packing Assembly of Stuffing Tube for Cable Assembly, Fuel Tank Level Indicator System for Tank Group-5; replace | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_38K6112321-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 11_38K6112321-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 11_38K6112321-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Inspection, Repair, and Preservation of IRS Eductor Secondary Air Inlet Trunk; accomplish | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_38K6112325-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 12_38K6112325-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 12_38K6112325-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Replacement of Watertight Door 01-240-1 and Repair of Defect on Collar Plate, | | | | | | | | | | |
| Stuffing Tube, and 02 Level Deck Plating in 01-240-1-A; accomplish | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_38K6113601-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 13_38K6113601-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 13_38K6113601-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Preservation of Vent Hood and Replacement of Weather Screen in 01 Level Weather Frame 240; accomplish | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_38K6113602-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 14_38K6113602-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 14_38K6113602-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Bulkhead Plating and Antenna 2-4 Platform, between 01 Level and 05 Level Weather, Frames between 202 and 247, Port and Starboard (Stbd); preserve | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_38K6113701-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 15_38K6113701-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 15_38K6113701-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Replacement of Nonskid System, Preservation of Stanchion, and Installation of | | | | | | | | | | |
| Equipment on 02 Level Weather; accomplish | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_38K6113702-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 16_38K6113702-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 16_38K6113702-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Forward Exhaust Stack and Sloping Transverse Bulkhead in 03 Level Weather, | | | | | | | | | | |
| Frames between 174 and 178, Port and Starboard (Stbd); preserve | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_38K6113801-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 17_38K6113801-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 17_38K6113801-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Replacement of Peel and Stick Nonskid System and Inspection, Repair, and | | | | | | | | | | |
| Preservation of 03 Level Weather, Deck Plating; accomplish | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | | |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_38K6144104-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 18_38K6144104-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 18_38K6144104-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Bond Strap of AM-7641A/U Amplifier Filter Unit No. One for AS-4679/U Antenna 3-10B; replace | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_38K6145601-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 19_38K6145601-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 19_38K6145601-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_38K6151101-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 20_38K6151101-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 20_38K6151101-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
21_38K6152101-A02
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 21_38K6152101-A02 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 21_38K6152101-A02 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
22_38K6154101-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 22_38K6154101-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 22_38K6154101-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Panel of Blast Shield and Bonding Assembly of Kingpost for Fueling At Sea (FAS) Station No. 7 in 02 Level Weather, Starboard (Stbd); replace | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
23_38K6154101-T01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 23_38K6154101-T01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 23_38K6154101-T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Tightness & Operational Test for Fuel Transfer System | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
24_38K6154101-T02
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 24_38K6154101-T02 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 24_38K6154101-T02 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Tightness & Operational Test for JP-5 System | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
25_38K6154103-A02
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 25_38K6154103-A02 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 25_38K6154103-A02 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Fuel Tank Group-5 and Group-6; dewater | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
26_38K6158301-A01
| SHIP NAME/AVAILABILITY: | USS RAFAEL PERALTA (DDG-115) - USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1 | | | | | TGI 26_38K6158301-A01 SUMMARY | | | | | |
| SOLICITATION #: | N6264926RA036 | | | | | | | | | | |
| SRF-JRMC TGI #: | 26_38K6158301-A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | Rope Staple on Life Raft Cradle in 02 Level Weather, Frames between 166 and 169, Port; replace | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
This is the start of the file's text. The full file is on GovTribe.