This is a Task Group Instruction (TGI) document for ship maintenance work on USS RAFAEL PERALTA (DDG-115), issued by Naval Base as an internal work order for temporary scaffolding installation and removal services.
The document specifies installation and removal of scaffolding assemblies across twelve distinct locations on the vessel to support countermeasure washdown (CMWD) system piping repair work. Work locations include multiple deck levels and weather decks (05 Level, 04 Level, 03 Level, 02 Level, and 01 Level) spanning frames 110-165, plus specialized spaces including the Pilot House, Array Rooms, Electronic Workshops, Fan Rooms, and the Commanding Officer Stateroom. The work consists of 16 total scaffolding assembly lots to be erected and subsequently removed upon completion of SRF-JRMC repair work. The contractor work period runs from July 22, 2026 through September 11, 2026. References include NSI FY-26 (NAVSEA Standard Items), LI FY-26 (Local Standard Items), and 29 CFR Part 1915.71 (Scaffolding or Staging standards). SRF-JRMC will provide crane and rigger services, safety inspections, and QA inspections for G-symbol work items. No Government Furnished Material is required. Security classification applies to work in Array Rooms 3 and 4 (spaces 1.2.8 and 1.2.9). The Material List (Appendix M) contains no line items, indicating that materials may be contractor-supplied or GFM to be added separately. The document includes planning contact information, with N. Kurokawa as Planner and T. Yaginuma as Work Integration Manager.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: TEMPORARY STAGING SY TST A 2 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-115 USS RAFAEL PERALTA 86511 K61
CU PHASE TITLE:
*F/O - INSTL & RMV SCAFFOLDING TO/FROM ZONE-2 CMWD SYS PIPING RPR WORK AREA
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
NAOKI KUROKAWA 231B. 315-243-0108 24-OCT-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 24-OCT-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: TEMPORARY STAGING SY TST A 2
FOUO
SHIP: DDG-115 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-4 J-1 M-1
1. SCOPE/PURPOSE
1.1 Title: Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove
1.2 Location of Work:
1.2.1 05 Level Weather, Frames between 158 and 164, Port
1.2.2 04 Level Weather, Frames between 130 and 160, Port
1.2.3 04 Level Weather, Frames between 155 and 160, Starboard (Stbd)
1.2.4 03 Level Weather, Frames between 140 and 165, Stbd
1.2.5 Between 01 Level and 02 Level Weather, Frames between 110 and 115, Port and Stbd
1.2.6 02 Level Weather, Frames between 135 and 140, Stbd
1.2.7 Pilot House (04-130-0-C)
1.2.8 Array Room No. 3 and Electronic Workshop No. 1A (03-158-3-Q)
1.2.9 Array Room No. 4 and Electronic Workshop No. 1B (03-158-2-Q)
1.2.10 Fan Room (03-142-3-Q)
1.2.11 Fan Room (03-142-4-Q)
1.2.12 Commanding Officer Stateroom (02-136-3-L)
1.3 Identification:
1.3.1 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.1 Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.2 Quantity (3 Lot), Scaffolding Assembly
Location: 1.2.2 Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.3 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.3 Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.4 Quantity (2 Lot), Scaffolding Assembly
Location: 1.2.4 Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
FOUO
SHIP: DDG-115 CHG/VER: 0/0
1.3.5 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.5 Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.6 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.6 Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.7 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.7, Frames between 130 and 135, Port Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.8 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.8, Frames between 155 and 160, Stbd Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.9 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.9, Frames between 155 and 160, Port Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.10 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.10, Frames between 148 and 156, Stbd Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.11 Quantity (3 Lot), Scaffolding Assembly
Location: 1.2.11, Frames between 142 and 158, Port Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.3.12 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.12, Frames between 140 and 145, Stbd Remarks: Repair work of countermeasure washdown system piping will be accomplished by SRF-JRMC.
1.4 Security Classification:
1.4.1 Spaces - 1.2.8 and 1.2.9
1.5 Initial Condition: None.
1.6 Contractor Work start date:
1.7 Contractor Work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM 29 CFR
PART
1915.71
Scaffolding or Staging - N
3. APPENDICES:
Kouichi.Yoshida.ja Typewritten Text 7/22/2026
Kouichi.Yoshida.ja Typewritten Text 9/11/2026
FOUO
SHIP: DDG-115 CHG/VER: 0/0
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable
5. PROCEDURE:
5.1 Erect/hang scaffolding listed in 1.3.1 through 1.3.12 in accordance with 2.3.
5.2 Remove scaffolding listed in 1.3.1 through 1.3.12 upon completion of the work in accordance with 2.3 when requested by SRF-JRMC via Code 333.
5.3 Notes:
5.3.1 Planner: Code 231B N. Kurokawa, 243-0108
5.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
5.3.3 JCN ER04-1265 is related to this TGI.
5.4 Government Furnished Material (GFM): None.
5.5 SRF-JRMC will provide the following service work: (TGI No. 38K6152101S02)
5.5.1 [C740] Crane and crane rigger service.
5.5.2 [C106.1] Safety inspection for SRF-JRMC employees.
5.5.3 [C133] QA inspection for (G) symbol(s).
Kouichi.Yoshida.ja Cross-Out
Kouichi.Yoshida.ja Typewritten Text
1/30/2026 C1209.2 K. YOSHIDA
TGI NO.: TEMPORARY STAGING
SY
TST A 2
FOUO
M-1
SHIP: DDG-115 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
86511 TEMPORARY STAGING SY TST A 2 0
CU PHASE TITLE:
*F/O - INSTL & RMV SCAFFOLDING TO/FROM ZONE-2 CMWD SYS PIPING RPR WORK AREA
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K6152101 A02
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 TEMPORARY STAGING SY TST A 2
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K6152101 A02
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 TEMPORARY STAGING SY TST A 2
File details come from the government source that posted it. Updated .