This is a WebAIM Short Form Task Group Instruction (TGI) document for naval ship maintenance work. The document provides instructions for contractor work on USS RAFAEL PERALTA (DDG-115), specifically for tightness and operational testing of the JP-5 fuel system (System 54211) under project K61. The work is identified as component 54211-3-300KTR and designated as contractor work, marked with Phase TT and Type T.

The primary task requires the contractor to accomplish and document the tightness and operational test in accordance with reference document TP 54211-3-300KTR. The work was prepared by Shigeru Teranishi (Code 246.2) on November 28, 2025, and approved by John Sophabmixay (Code 246.2) on December 6, 2025, with Kazunobu Saito serving as Zone Manager for Zone U. The instruction was last updated January 24, 2026 (ICN: 38K6154101, Key Op: T02). The document indicates material references and lists are available but do not specify quantities, labor hours, or costs in the provided sections. Special requirements note only "TGI Short Form" without additional detail. This instruction serves as the governing document for executing the specified maintenance and testing work on the ship's JP-5 fuel system.

View the file

Other files

File Type Posted
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6112321A01_c0v0_REV1.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6112317A01_c0v0_REV1.pdf PDF
TGI_38K6112001A01_c0v0_REV1.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
TGI_38K6186301A01_c0v0_rev1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
Attachment IV Request for Information Form.pdf PDF
N6264926RA0360001 SF30.pdf PDF
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI_38K6112318A01_c0v0.pdf PDF
TGI 38K6186301A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
TGI 38K6171101A01_c0v0.pdf PDF
TGI_38K6112001A01_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

24-JAN-2026 0949

20.15.6.0.9333 (July 2025) ICN: 38K6154101 KeyOp: T02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54211-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 54211

CU PHASE TITLE: JP-5 SYS (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EB14L021 * CE03L017

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TERANISHI, SHIGERU 246.2 3152433424 28-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

SOPHABMIXAY, JOHN 246.2 3152432291 06-DEC-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CE03-L017 * EB14-L021

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

541A1201

Tightness & Operational Test for JP-5 System - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

24-JAN-2026 0949

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154101 KeyOp: T02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54211-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 54211

CU PHASE TITLE: JP-5 SYS (T & OP) - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 54211-3-300KTR JP-5 SYS (T & OP) - KTR LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the tightness & operational test in accordance with reference, TP 54211-3-300KTR.

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6154101 KEY OP: T02