This is a WebAIM Short Form Task Group Instruction (TGI) document for naval ship maintenance work. The document provides instructions for contractor work on USS RAFAEL PERALTA (DDG-115), specifically for tightness and operational testing of the JP-5 fuel system (System 54211) under project K61. The work is identified as component 54211-3-300KTR and designated as contractor work, marked with Phase TT and Type T.
The primary task requires the contractor to accomplish and document the tightness and operational test in accordance with reference document TP 54211-3-300KTR. The work was prepared by Shigeru Teranishi (Code 246.2) on November 28, 2025, and approved by John Sophabmixay (Code 246.2) on December 6, 2025, with Kazunobu Saito serving as Zone Manager for Zone U. The instruction was last updated January 24, 2026 (ICN: 38K6154101, Key Op: T02). The document indicates material references and lists are available but do not specify quantities, labor hours, or costs in the provided sections. Special requirements note only "TGI Short Form" without additional detail. This instruction serves as the governing document for executing the specified maintenance and testing work on the ship's JP-5 fuel system.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
24-JAN-2026 0949
20.15.6.0.9333 (July 2025) ICN: 38K6154101 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54211-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 54211
CU PHASE TITLE: JP-5 SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EB14L021 * CE03L017
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TERANISHI, SHIGERU 246.2 3152433424 28-NOV-2025
APPROVED BY: CODE: PHONE: DATE:
SOPHABMIXAY, JOHN 246.2 3152432291 06-DEC-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CE03-L017 * EB14-L021
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
541A1201
Tightness & Operational Test for JP-5 System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
24-JAN-2026 0949
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154101 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54211-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 54211
CU PHASE TITLE: JP-5 SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 54211-3-300KTR JP-5 SYS (T & OP) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 54211-3-300KTR.
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6154101 KEY OP: T02