TGI_38K6112317A01_c0v0.pdf

PDF 2 MB Posted

Attached to
USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
Solicitation number
N6264926RA036
Issued by

About this file

This is a WebAIM Short Form Task Group Instruction (TGI) document for installation work on the USS Rafael Peralta (DDG-115) naval vessel. The document, dated 21 January 2026, provides detailed specifications for installing a hook assembly and staple for the louver door of Ship Service Gas Turbine Generator (SSGTG) No. 3 intake system.

The work scope requires fabrication and installation of one hook assembly and one staple on the louver assembly located in the SSGTG Intake Trunk at 01 Level Weather between frames 397 and 398 on the port side. The staple must be fabricated from carbon steel (ASTM A36) 3/8-inch diameter round bar using fillet weld joints per MIL-STD-22D with 3/16-inch fillet weld size. The hook assembly consists of a snap hook (CRES 316 material, 19/32-inch opening, modified per MIL-H-15021 Type I) and detachable link. Contractor work is scheduled from 27 July 2026 through 4 September 2026. The work must comply with Gas Turbine Maintenance Procedure requirements and includes fabrication per referenced engineering drawings (DWG 259-6566713, Sheets 6A, 26B-30, and 38C-12). Government-furnished materials and services—including crane and rigging services, utilities, safety inspections, gas-free inspections, and QA inspections—will be provided by SRF-JRMC under separate service work order (TGI No. 38K6112317S02).

View the file

Other files

File Type Posted
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6112321A01_c0v0_REV1.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6112317A01_c0v0_REV1.pdf PDF
TGI_38K6112001A01_c0v0_REV1.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
TGI_38K6186301A01_c0v0_rev1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
Attachment IV Request for Information Form.pdf PDF
N6264926RA0360001 SF30.pdf PDF
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI_38K6112318A01_c0v0.pdf PDF
TGI 38K6186301A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
TGI 38K6171101A01_c0v0.pdf PDF
TGI_38K6112001A01_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) ICN: 38K6112317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: LVR DR #3 SSGTG INTK AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - INSTALL HOOK ASSEMBLY FOR LOUVER DOOR OF NO. 3 SSGTG INTAKE

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

ES01NA56

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKEUCHI, NORIYUKI 231B 3152439983 26-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 26-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NA56

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A2117

1. SCOPE/PURPOSE:

1.1 Title: Hook Assembly for Louver Door of No. 3 Ship Service Gas Turbine Generator (SSGTG) Intake; install

1.2 Location of Work:

1.2.1 SSGTG Intake Trunk (1-388-2-Q) (Dirty Side)

1.2.2 SSGTG Intake Trunk (1-388-2-Q) (Clean Side)

1.2.3 01 Level Weather, Frames between 397 and 398, Port

1.3 Identification:

1.3.1 Quantity (One AY), Hook Assembly for Louver Door of No. 3 SSGTG Intake

Remarks: See Sheet 38C-12 of Ref. No. 4 for material and detail, and Sketch Enclosure-01 for location detail

TGI Short Form

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: LVR DR #3 SSGTG INTK AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - INSTALL HOOK ASSEMBLY FOR LOUVER DOOR OF NO. 3 SSGTG INTAKE

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.1.1 Quantity (One EA), Staple on Louver Assembly

Material: OS, ASTM A36, 3/8 Inch Diameter Round Bar Weld Joint Design: PT1S.1 of MIL-STD-22D Fillet Weld Size: 3/16 Inch

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Accomplish the requirements of Ref. No. 3.

(V)(G) “GAS TURBINE MAINTENANCE PROCEDURE”

2.2 Install each new hook assembly listed in 1.3.1 in accordance with Ref. No. 4.

2.2.1 Fabricate each new staple listed in 1.3.1.1.

2.2.2 Accomplish the requirements of 009-012 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.4 Notes:

2.4.1 Planner: Code 231B N. Takeuchi, 243-9983

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.4.3 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG115-045-24 from TGI No. 3815C11006I01.

2.4.4 WPC will copy the following sheet in reference.

REF. No. 4: Pages 6A, 26B-30, and 38C-12

2.4.5 JCN ES01-NA56 is related to this TGI.

2.5 Government Furnished Material (GFM):

2.5.1 SRF-JRMC will provide GFM listed in the Material List.

2.6 SRF-JRMC will provide the following service work: (TGI No. 38K6112317S02).

Kouichi.Yoshida.ja Typewritten Text 7/27/2026

Kouichi.Yoshida.ja Typewritten Text 9/4/2026

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: LVR DR #3 SSGTG INTK AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - INSTALL HOOK ASSEMBLY FOR LOUVER DOOR OF NO. 3 SSGTG INTAKE

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service, electrical.

2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA inspection for (G) symbol(s).

2.6.7 [C285] Inspection for (G) symbol(s).

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: LVR DR #3 SSGTG INTK AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - INSTALL HOOK ASSEMBLY FOR LOUVER DOOR OF NO. 3 SSGTG INTAKE

FOUO Pg 4 of 5

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 MP AL14-K6112317-

ES01NA56

NR.3 SSGTG INTK SYS FOD

PROTECTION FOR INSTL

NEW HOOK ASSY & STAPLE

FOR LVR DOOR

- Y ALL

4 DWG 259-6566713 DDG51 CLASS FAB & INSTL

OF INTAKE LVRS FOR GTRB

& SSGTRB

U Y SE

E

NO

TE

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M BAR,METAL, ORIG: C231B,

Y.YOSHIHARA, 243-9984

ORDER FOR X11

9B 9510 001881738 NA 4 N 51615098 10/FT

002 M LINK,DETACHABLE, ORIG:

C231B, Y.YOSHIHARA, 243-

ORDER FOR X11

9B 4010 015308436 NA 4 N 51115024 2/EA

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6112317 KEY OP: A01

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112317 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: LVR DR #3 SSGTG INTK AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: F/O - INSTALL HOOK ASSEMBLY FOR LOUVER DOOR OF NO. 3 SSGTG INTAKE

FOUO Pg 5 of 5

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

003 M SNAP HOOK, SNAP HOOK,

OPENING WITHOUT O-RING,

SPEC: MIL-H-15021, TYPE I

MOD (MODIFY MATERIAL TO

CRES 316),

SIZE: 19/32" OPENING X 1-1/4"

DIA EYE X 4-3/4"LG,

MATERIAL: CRES 316, BIW

CAT# 54624-026,

ORIG: C231B, Y.YOSHIHARA,

243-9984

ORDER FOR X11

9B 5340 LL9006549 NA 4 N 51157454 1/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K6112317A01-Sketch.pdf 26-NOV-2025 0000

LOCATION DETAIL OF STAPLE AND HOOK ASSEMBLY FOR LOUVER DOOR OF NO.3 SSGTG INTAKE

SKETCH

ENCLOSURE-0138K6112317A01 SHEET 1 OF 1

Missing Hook Assembly and Staple

: Missing Hook Assembly and Staple

File details come from the government source that posted it. Updated .