This is a WebAIM Short Form Task Group Instruction (TGI) for maintenance work on the USS RAFAEL PERALTA (DDG-115), a U.S. Navy destroyer. The document, issued January 30, 2026, authorizes dewatering of Fuel Tank Groups 5 and 6 with a work window from August 3, 2026 to September 11, 2026.

The scope involves removing water from six fuel tanks located across multiple ship compartments: Crew Living Spaces 4, 6, and 7; an Access Trunk; a Passage; and a Generator Room. Group 5 consists of three tanks with a combined capacity of 69,695 gallons requiring removal of 47,700 gallons of water, while Group 6 contains three tanks with a combined capacity of 63,450 gallons also requiring 47,700 gallons of water removal. Work will be performed in accordance with Navy standard procedures (references 099-909YO and 009-009). The instruction specifies that SRF-JRMC will provide supporting services including crane and rigging, electrical utilities, low-pressure air/water/steam supply, safety and gas-free inspections for employees, and QA inspection. A related Fuel Transfer Valve replacement (TGI No. 38K6154103A01) will occur concurrently. The planner is Code 231B A. Suzuki and the Work Integration Manager is Code 333 T. Yaginuma. No Government-Furnished Material is required, and the security classification is unclassified. The document contains blank fields for task descriptions, materials lists, and crew hour requirements.

View the file

Other files

File Type Posted
TGI_38K6112304A01_c0v0_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV2.pdf PDF
TGI_38K6154101A01_c1v1_REV2.pdf PDF
TGI_38K6112320A01_c1v1_REV2.pdf PDF
TGI_38K6112001A01_c0v0_REV2.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
TGI_38K6112301A01_c0v0_REV1.pdf PDF
TGI_38K6112305A01_c1v0_REV1.pdf PDF
TGI_38K6112304A01_c0v0_REV1.pdf PDF
TGI_38K6112316A01_c0v0_REV1.pdf PDF
TGI_38K6171101A01_c0v0_REV1.pdf PDF
TGI_38K6169901A01_c0v0_REV1.pdf PDF
TGI_38K6154101A01_c1v1_REV1.pdf PDF
7027318_53711_-_0001_ G_-_0001.pdf PDF
MP LM19-K6112303-ES01NA54_r3.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6112321A01_c0v0_REV1.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6112317A01_c0v0_REV1.pdf PDF
TGI_38K6112001A01_c0v0_REV1.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
TGI_38K6186301A01_c0v0_rev1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
Attachment IV Request for Information Form.pdf PDF
N6264926RA0360001 SF30.pdf PDF
TGI_38K6151101A01_c0v0.pdf PDF
TGI_38K6113702A01_c0v0.pdf PDF
TGI_38K6113601A01_c0v0.pdf PDF
TGI_38K6113602A01_c0v0.pdf PDF
TGI_38K6112303A01_c0v0.pdf PDF
TGI 38K6169901A01_c0v0.pdf PDF
TGI_38K6112316A01_c0v0.pdf PDF
TGI_38K6112306A01_c0v1.pdf PDF
TGI_38K6112321A01_c0v0.pdf PDF
Attachment VII QSAP.pdf PDF
Exhibit A CDRL - GFM.pdf PDF
Attachment V Source of Repair Instruction.pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
TGI 38K6171101A01_c0v0.pdf PDF
TGI_38K6112001A01_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EB140579

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SUZUKI, AKIRA 231B 3152430968 17-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 17-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EB14-0579

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

541A1203

1. SCOPE/PURPOSE:

1.1 Title: Fuel Tank Group-5 and Group-6; dewater

1.2 Location of Work:

1.2.1 Crew Living Space No. 4 (3-300-1-L)

1.2.2 Access Trunk (3-308-2-T)

1.2.3 Crew Living Space No. 6 (3-338-3-L)

1.2.4 Passage (3-338-6-L)

1.2.5 Crew Living Space No. 7 (3-350-2-L)

1.2.6 Generator Room (3-370-0-E)

TGI Short Form

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3 Identification:

1.3.1 Quantity (One EA), Fuel Receiving Tank Group-6

Tank No.: 5-308-2-F Capacity: 30,032 Gallons

1.3.2 Quantity (One Lot/3 Tanks), Fuel Tank Group-5

Total Capacity: 69,695 Gallons Required amount of water to dewater: 47,700 Gallons

1.3.2.1 Fuel Receiving Tank Group-5

Tank No.: 5-308-1-F Capacity: 30,038 Gallons

1.3.2.2 Fuel Tank Group-5

Tank No.: 5-354-0-F Capacity: 38,127 Gallons

1.3.2.3 Fuel Expansion Seawater Overflow Tank Group-5

Tank No.: 4-370-3-F Capacity: 1,530 Gallons

1.3.3 Quantity (One Lot/3 Tanks), Fuel Tank Group-6

Total Capacity: 63,450 Gallons Required amount of water to dewater: 47,700 Gallons

1.3.3.1 Fuel Receiving Tank Group-6

Tank No.: 5-308-2-F Capacity: 30,032 Gallons

1.3.3.2 Fuel Tank Group-6

Tank No.: 5-370-0-F Capacity: 31,545 Gallons

1.3.3.3 Fuel Expansion Seawater Overflow Tank Group-6

Tank No.: 4-370-4-F Capacity: 1,873 Gallons

1.4 Security Classification: None.

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition:

1.5.1 CASREP C-2, DTG: 242351ZMAR ’25, SERIAL: 25040

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Dewater each tank listed in 1.3.1. See 2.2.3.

2.1.1 Accomplish the requirements of 099-909YO of Ref. No. 2 for each tank listed in 1.3.2 and 1.3.3.

2.1.2 Accomplish the requirements of 009-009 of Ref. No. One.

2.2 Notes:

2.2.1 Planner: Code 231B A. Suzuki, 243-0968

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 Fuel Transfer Valve FT-V-122B located in 5-300-01-E will be replaced by SRF-JRMC (TGI No. 38K6154103A01).

2.2.4 JCN EB14-0579 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38K6154103S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

Kouichi.Yoshida.ja Typewritten Text 8/3/2026

Kouichi.Yoshida.ja Typewritten Text 9/11/2026

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6154103 KEY OP: A02