This is a Task Group Instruction (TGI) for repair work on the forward uptake space of the USS RAFAEL PERALTA (DDG-115), a naval destroyer. The TGI was prepared by Reiya Kimura and approved by Hideo Harada on November 28, 2025, with a contractor work start date of July 27, 2026, and completion date of September 4, 2026.
The scope of work encompasses multiple repair and replacement activities across five locations within the ship: Uptake Engine Room No. One, two Decoy Launching System magazines, and weather deck areas. Major work items include removal and replacement of thermal insulation and lagging on three exhaust ducts (20 SF for 1A GTM, 20 SF for 1B GTM, and 32 SF for SSGTG) specified to MIL-PRF-2818 insulation with 1577CW-WME lagging. Additionally, the contractor must remove and replace 13 steel studs, 8 padeyes, 4 cable studs, 1 cable clamp, and 4 stuffing tubes across various bulkheads and structural elements. The work also includes welding and repair of bulkhead plating with air hose testing, modification of a cable trunk, installation of thermostat switches (2 units, NSN 5930-01-023-9214), and replacement of 15 cable hangers. Special requirements mandate hot work procedures in magazine and adjacent spaces per S6740-AA-SAF-010 and NAVSEA OP 4. The government will furnish materials and provide service work including crane/rigging, utilities, safety and gas-free inspections, and QA inspection. Physical inspection of completed work is not required, though records review is mandated.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: FWD UPTAKE RPR AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE:
*F/O – REPAIR FWD UPTAKE SPACE
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
REIYA KIMURA 234. 070-7603-8983 28-NOV-2025
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 315-243-5176 28-NOV-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
HOT WORK IN MAGAZINE AND ADJACENT SPACES IAW S6740-AA-SAF-010 AND NAVSEA OP 4
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: FWD UPTAKE RPR AY A 0
FOUO
SHIP: DDG-115 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-6 Sketch- 01 (1-4)
J1-2 Sketch- 02 (1-11)
M1-3 Engrg Inst (1-5)
1. SCOPE/PURPOSE
1.1 Title: FWD Uptake Space; repair
1.2 Location of Work:
1.2.1 Uptake Engine Room No. One (02-186-0-Q)
1.2.2 Decoy Launching System (DLS) Magazine (MAG) No. One (02-186-2-M)
1.2.3 DLS MAG No. 2 (02-194-1-M)
1.2.4 02 Level Weather, Frames between 204 and 206, Port
1.2.5 05 Level Weather, Frames between 189 and 216, Port and Starboard (Stbd)
1.3 Identification:
1.3.1 Quantity (20 SF), Insulation and Lagging, Exhaust Duct, 1A Gas Turbine Module (GTM), Frame 210, Located in 1.2.1 Insulation: MIL-PRF-2818 Lagging: 1577CW-WME Remarks: See Sketch Enclosure-02 for detail.
1.3.2 Quantity (20 SF), Insulation and Lagging, Exhaust Duct, 1B GTM, Frame 195, Located in 1.2.1 Insulation: MIL-PRF-2818 Lagging: 1577CW-WME Remarks: See Sketch Enclosure-02 for detail.
1.3.3 Quantity (32 SF), Insulation and Lagging, Exhaust Duct, No. One Ship Service Gas Turbine Generator (SSGTG), Frame 202, Located in 1.2.1 Insulation: MIL-PRF-2818 Lagging: 1577CW-WME Remarks: See Sketch Enclosure-02 for detail.
1.3.4 Quantity (13 EA in Total), Stud in 02-186-0-Q
Material: Steel
1.3.4.1 Quantity (2 EA), Stud on Web Frame 212, Stbd
Remarks: See Sheet 3 Detail 3-B of Sketch Enclosure-03 for location detail
1.3.4.2 Quantity (One EA), Stud on Transverse Bulkhead, Frame 212, Stbd Remarks: See Sheet 3 Detail 3-C of Sketch Enclosure-03 for location detail
FOUO
SHIP: DDG-115 CHG/VER: 0/0
1.3.4.3 Quantity (7 EA), Stud on Horizontal Stiffener on Longitudinal Bulkhead of Forward Stack, Frames between 206 and 212, Port Remarks: See Sheet 4 Detail 4-B and 4-C of Sketch Enclosure-03 for location detail
1.3.4.4 Quantity (One EA), Stud on Lateral Stiffener on Sloping Transverse Bulkhead, Frame 220, Port Remarks: See Sheet 4 Detail 4-D of Sketch Enclosure-03 for location detail
1.3.4.5 Quantity (3 EA), Stud on Horizontal Stiffener on Longitudinal Bulkhead of Forward Stack, Frames between 204 and 206, Port Remarks: See Sheet 5 of Sketch Enclosure-03 for location detail
1.3.5 Quantity (8 EA in Total), Padeye in 02-186-0-Q
Material: Steel
1.3.5.1 Quantity (4 EA), Padeye on Stack Top, Frames between 193 and 208, Port and Stbd Remarks: See Sheet 11 of Sketch Enclosure-03 for location detail
1.3.5.2 Quantity (2 EA), Padeye on Horizontal Framing, Frames between 187 and 189, Port and Stbd Remarks: See Sheet 8 Detail 8-A and 8-D of Sketch Enclosure-03 for location detail
1.3.5.3 Quantity (2 EA), Padeye on Flange Plate of Horizontal Framing, Frames between 188 and 189, Port and Stbd Remarks: See Sheet 8 Detail 8-B and 8-C of Sketch Enclosure-03 for location detail
1.3.6 Quantity (4 EA in Total), Cable Stud in 02-186-0-Q
Material: Steel
1.3.6.1 Quantity (2 EA), Cable Stud on Horizontal Stiffener on Sloping Transverse Bulkhead, Frame 220, Stbd Remarks: See Sheet 10 of Sketch Enclosure-03 for location detail
1.3.6.2 Quantity (One EA), Cable Stud on Vertical Stiffener on Sloping Transverse Bulkhead, Frame 186, Stbd Remarks: See Sheet 9 Detail 9-B of Sketch Enclosure-03 for location detail
1.3.6.3 Quantity (One EA), Cable Stud on Horizontal Stiffener on Sloping Transverse Bulkhead, Frame 186, Stbd Remarks: See Sheet 9 Detail 9-C of Sketch Enclosure-03 for location detail
1.3.7 Quantity (One EA), Cable Clamp with Stud on Horizontal Stiffener on Sloping Transverse Bulkhead in 02-186- 0-Q, Frame 186, Stbd Material: Steel Remarks: See Sheet 9 Detail 9-D of Sketch Enclosure-03 for location detail
1.3.8 Quantity (4 EA), Stuffing Tube on Transverse Bulkhead in 02-186-0-Q, Frames between 204 and 205, Port Material: Steel Remarks: See Sheet 5 Section 5-A of Engrg Inst Enclosure-01 for location detail
1.3.9 Quantity (One Lot), Bulkhead Plating, Transverse Bulkhead in 02-186-0-Q, Frames between 204 and 205, Port Base Material: HTS, MIL-S-22698 GR-DH36, 7.65 LBs Plate Remarks: See Sheet 5 Section 5-A of Engrg Inst Enclosure-01
1.3.10 Quantity (One Lot), Cable Trunk in 02-186-0-Q, Port
Base Material: HTS, MIL-S-22698 GR-DH36, 7.65 LBs Plate
1.3.10.1 Quantity (13 EA), Stud for Access Cover Plate
Remarks: See Sheet 6 of Sketch Enclosure-03 for location detail
1.3.10.2 Quantity (16 EA), Stud for Access Cover Plate
FOUO
SHIP: DDG-115 CHG/VER: 0/0
Parts No.: M24149/3-3 Material: CRES 316, MIL-24149/3D, Type V, Class One, Style B Size: 1/4-20UNC-2A, One Inch Length Remarks: See Detail 7C-4G of 2.7 and 2.8 for detail, and Sheet 6 of Sketch Enclosure-03 for location detail
1.3.11 Quantity (2 EA), Thermostat Switch
Mfr: Detroit Switch Inc Part Number: 222-10NNM-2221375
NSN: 5930-01-023-9214
Remarks: Item No. One, See SECT 3-A and SECT 5-A of Engrg Inst Enclosure-01 for details.
1.3.12 Quantity (15 EA), Cable Hanger for Coaxial Cable (Ckt: R-RA96(R4)) in 02-186-0-Q Material: Steel Remarks: See Engrg Inst Enclosure-01 for details.
1.4 Security Classification:
1.4.1 Spaces - 1.2.2 and 1.2.3
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM S9086-
VH-STM-
010/CH-635
Thermal, Fire, and Acoustic Insulation
3 N
4 DWG 259-
6218406
FAB & INSTL OF GTRB UPTAKE &
AIR INTAKE ENG RM NO.1 &
ABOVE
AF N
5 DWG 259-
6218421
FAB & INSTL of SS GTRB Uptake & Air Intakes AUX MCHRY RM
NO.1 & ABV
AH N
6 DWG 150-
7026725
UNIT STRUCTURAL ARR DWG
ASSY UNIT 4420
J Y SE
E N
OT
E
7 DWG 150-
7026723
UNIT STRL ARR ASSY UNIT 4320 J Y 7C
-18
8 DWG 100-
6218863
STANDARD STRUCTURAL &
WELDING DETAILS
AJ Y 74
9 DWG 301-
7027056
INSTL ELEC EQUIP DZ 4420 FWD
STACK
H Y 23, 10 DWG 331-
7028051
One Line Diagram Lighting System G Y 59 E
11 MIL MIL-
STD-2003
Electric Plant Installation Standard Methods for Surface Ships and Submarines
B N
Kouichi.Yoshida.ja Typewritten Text 7/27/2026
Kouichi.Yoshida.ja Typewritten Text 9/4/2026
FOUO
SHIP: DDG-115 CHG/VER: 0/0
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Remove each existing insulation and lagging listed in 1.3.1 through 1.3.3 from each exhaust duct, using 2.3 for guidance.
5.2 Accomplish the requirements of 009-011 of 2.1 for installation of each new insulation and lagging listed in 1.3.1 through 1.3.3 to each exhaust duct, using 2.4 and 2.5 for guidance.
5.3 Remove unused each existing stud, padeye, cable stud, cable clamp, and stuffing tube listed in 1.3.4 through
1.3.8 in accordance with Enclosure-01, using 2.6 for guidance.
5.3.1 Accomplish build up weld of remaining holes on each existing bulkhead plating listed in 1.3.9 where removal of unused each stuffing tube listed in 1.3.8.
5.3.1.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3.1.2 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld of bulkhead plating listed in 1.3.11. Allowable leakage: None.
5.4 Remove 2 each of access cover plate of each existing cable trunk listed in 1.3.10, using 2.7 for guidance.
5.4.1 Remove remaining portion of each existing stud listed in 1.3.10.1.
5.5 Accomplish build up weld of remaining bolt holes on each existing cable trunk listed in 1.3.10, using 2.7 for guidance.
5.5.1 Drill 1/2 inch diameter hole on each remaining hole.
5.5.2 Shape remaining hole to minimum 20 degrees countersink.
5.5.3 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.5.4 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld of cable trunk listed in
1.3.10. Allowable leakage: None.
5.6 Install each new stud listed in 1.3.10.2 in accordance with 2.7 and 2.8.
5.6.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.7 Reinstall 2 each of access cover plate of each cable trunk listed in 1.3.10, using new gaskets, CRES self-locking nuts conforming to NASM17830, and new CRES washers conforming to FF-W-92, Type A, Grade One, Class B, using 2.7 for guidance.
Kouichi.Yoshida.ja Cross-Out
Kouichi.Yoshida.ja Typewritten Text
1/26/2026 C1209.2 K. YOSHIDA
FOUO
SHIP: DDG-115 CHG/VER: 0/0
5.7.1 Fabricate new gaskets conforming to MIL-PRF-2765.
5.8 Remove existing and install new each equipment listed in 1.3.11 in accordance with Enclosure-01, using 2.9 and Sheet 59E of 2.10 for guidance.
5.9 Remove existing, fabricate, and install new each cable hanger listed in 1.3.12 in accordance with 2.11 and Enclosure-01.
5.10 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.11 Notes:
5.11.1 Planner: Code 234 R. Kimura, 070-7603-8983
Planner: Code 231B C. Saito, 243-5840 Planner: Code 232 T. Ogata, 243-1176 Planner: Code 233 Y. Shinohara, 080-9350-1451 Planner: Code 233 R. Nakamura, 080-9350-1445 Engineer: Code 250 K. Ishiwata, 243-0092 Engineer: Code 270 N. Kozaki, 243-1880
5.11.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.11.3 JCNs EM01-L034 and ES01-NA61 are related to this TGI.
5.11.4 WPC will copy the following pages in reference.
REF. 2.6: Pages 3N-6, 3-12, 3A-12, 3B-18, 3C-18, and 3D-18
5.11.5 Thermostat switches listed in 1.3.11 will be adjusted by S/F.
5.12 Government Furnished Material (GFM):
5.12.1 SRF-JRMC will provide GFM listed in the Material List.
5.13 SRF-JRMC will provide the following service work: (TGI No. 38K6112301S02)
5.13.1 [C740] Crane and crane rigging service.
5.13.2 [X99E] Utilities service.
5.13.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.13.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.13.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.13.6 [C133] QA Inspection for (G) symbol(s).
FOUO
M-1
SHIP: DDG-115 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
FWD UPTAKE RPR AY A 0 0
CU PHASE TITLE:
*F/O – REPAIR FWD UPTAKE SPACE
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K6112301 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
100 M INSULATI, ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9Q 5640 013713263 NA 4 N 53175486 3/SH
101 M INSULATI, ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9Q 5640 013713262 NA 4 N 53175457 4/SH
102 M TAPE,TEX, ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9B 8315 002671632 NA 4 N 53175126 1/RO
103 M CAP,SNAP, ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9B 5325 007377648 NA 4 N 53175136
100/EA
104 M ADHESIVE, ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9B 8040 002738708 NA 4 Y 53175147 1/GL
NOTES:
FOUO
M-2
SHIP: DDG-115 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
105 M STUD WELDING, STUD
WELDING WITH ARC SHIELD
(FERRULE), SPEC:MIL-S-
24149/3 TYPE V STYLE B
(SOLID FLUX WELD-END)
CLASS 1, SIZE:1/4"-20UNC-2A
X 1"LG, MATL:CRES 316
ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
LL9310282 NA 4 N 16/EA
106 M NUT,SELF, ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9B 5310 015126463 NA 4 N 53175491 40/EA
107 M WASHER,F, ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9B 5310 014476391 NA 4 N 53175386 40/EA
108 M RUBBER SHEET,SOLID,
ORDER FOR KTR
ORIG: C231B, C. SAITO, 243-
9B 9320 010199073 NA 4 N 53285143 2/SY
200 M SWITCH,THERMOSTATIC,
ORDERED FOR KTR
ORIG: C-232, T. OGATA 243-
3B 5930 010239214 NA 4 N 53175495 2/EA
201 M SCREW,CAP,HEXAGON H,
ORDERED FOR KTR
ORIG: C-232, T. OGATA 243-
9B 5305 015198464 NA 4 N 53175500 6/EA
300 M ANGLE DOWNCOMER, ANGLE
DOWNCOMER, STEEL, 120-
3/8"LG, UNIVERSAL TYPE,
WELD STUD MOUNTING, PART
NUMBER EQUALS ONE EACH.
ORIG: C233.2 R. NAKAMURA,
080-9350-1445
ORDERED FOR KTR
P/N: 3ADS-120U
9Q LL4660730 NA 4 N 1/EA
301 M CROSSTIER, NAVY STAN,
CROSSTIER, NAVY STANDARD
7"LONG.CABLE HANGER,
STEEL, USE FOR WIREWAY,
UNIVERSAL TYPE
ORIG: C233.2 R. NAKAMURA,
080-9350-1445
ORDERED FOR KTR
P/N: 3CTS-07
LL9000947 NA 4 N 15/EA
302 M CHANNEL, DOWNCOMER,
CHANNEL, DOWNCOMER,
LENGTH: 10 FT, MATL: STEEL,
ORIG: C233.2 R. NAKAMURA,
080-9350-1445
ORDERED FOR KTR
P/N: 3CDS-120
9G 5975 LL4588937 NA 4 N 53287468 1/EA
FOUO
M-3
SHIP: DDG-115 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
400 M INSULATI, INSULATION
BLANKET, THERMAL, MINERAL
WOOL,
SPEC: MIL-PRF-2818,
SIZE: 24" X 48" X 2" THK,
DENSITY: 8 LBS/CU FT,
BIW CATALOG NO. 47111-030,
ROCKWOOL P/N: SEAROX SL
620(128), REMARKS: OMIT METALLIC
SUPPORT MEMBERS FROM
BOTH SIDES,
ORG: C234 R.KIMURA, 070-
7603-8983
ORDERED FOR KTR
9B 5640 LL9606678 NA 4 N 53297746 10/SH
401 M INSULATION JKT TAPE,
INSULATION JKT TAPE,
3M VENTURECLAD
ENHANCED METAL
JACKETING, SILVER SMOOTH,
OVERALL WIDTH: 46”,
OVERALL LENGTH: 25 YARD,
ADHESIVE TYPE: ACRYLIC,
3M ID: 7100311664
ORG: C234 R.KIMURA, 070-
7603-8983
ORDERED FOR KTR
9B 5640 LL9609097 NA 4 N 1/RO
402 M TAPE INS, 3M 1577CW-3M (TM)
VENTURECLAD (TM)
INSULATION JACKETING TAPE
1577CW NATURAL ALUMINUM,
OVERALL WIDTH: 4”,
OVERALL LENGTH: 50 YARD,
ADHESIVE TYPE: ACRYLIC,
UI: CASE (4 ROLL),
C234 R.KIMURA, 070-7603-8983
ORDERED FOR KTR
9B 5640 LL9607166 NA 4 N 53297747 1/CS
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 FWD UPTAKE RPR AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K6112301 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 FWD UPTAKE RPR AY A 0
38K6112301A01 ENCLOSURE-01 Sheet 1 of 5
AutoCAD SHX Text REFERENCES: ASTERISKED (*) REFERENCES ARE NOT REQUIRED FOR PRODUCTION WORK ASTERISKED (*) REFERENCES ARE NOT REQUIRED FOR PRODUCTION WORK * (a). DDG51CL-331-7028051 "G": ONE LINE DIAGRAM LIGHTING SYSTEM (a). DDG51CL-331-7028051 "G": ONE LINE DIAGRAM LIGHTING SYSTEM 51CL-331-7028051 "G": ONE LINE DIAGRAM LIGHTING SYSTEM -331-7028051 "G": ONE LINE DIAGRAM LIGHTING SYSTEM 31-7028051 "G": ONE LINE DIAGRAM LIGHTING SYSTEM -7028051 "G": ONE LINE DIAGRAM LIGHTING SYSTEM 7028051 "G": ONE LINE DIAGRAM LIGHTING SYSTEM "G": ONE LINE DIAGRAM LIGHTING SYSTEM G": ONE LINE DIAGRAM LIGHTING SYSTEM ": ONE LINE DIAGRAM LIGHTING SYSTEM ONE LINE DIAGRAM LIGHTING SYSTEM (b). WCL FOR DDG115 "1": WIRE CONNECTION LIST FOR DDG115 WCL FOR DDG115 "1": WIRE CONNECTION LIST FOR DDG115 "1": WIRE CONNECTION LIST FOR DDG115 1": WIRE CONNECTION LIST FOR DDG115 ": WIRE CONNECTION LIST FOR DDG115 WIRE CONNECTION LIST FOR DDG115 *(c). DDG51CL-441-6567479 "L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM (c). DDG51CL-441-6567479 "L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM c). DDG51CL-441-6567479 "L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM ). DDG51CL-441-6567479 "L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM DDG51CL-441-6567479 "L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM DDG51CL-441-6567479 "L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM "L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM L": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM ": RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM RADIO COMMUNICATIONS SYSTEM (INTER-SPACE) CABLE BLOCK DIAGRAM *(d). DDG51CL-150-7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 (d). DDG51CL-150-7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 DDG51CL-150-7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 51CL-150-7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 -150-7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 150-7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 -7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 7026725 "J": UNIT STRL ARR DWG ASSY UNIT 4420 *(e). NAVSEA S9AA0-AB- GENERAL SPECIFICATIONS FOR OVERHAUL OF SURFACE SHIPS NAVSEA S9AA0-AB- GENERAL SPECIFICATIONS FOR OVERHAUL OF SURFACE SHIPS GENERAL SPECIFICATIONS FOR OVERHAUL OF SURFACE SHIPS GOS-010/GS0 REV 11: NOTES: 1. ELECTRICAL EQUIPMENT AND CABLING SHALL BE INSTALLED IN ACCORDANCE WITH MIL-STD-2003B(SH). ELECTRICAL EQUIPMENT AND CABLING SHALL BE INSTALLED IN ACCORDANCE WITH MIL-STD-2003B(SH). 2. EQUIPMENT SHALL BE BONDED/GROUNDED IN ACCORDANCE WITH MIL-STD-1310H(NAVY). EQUIPMENT SHALL BE BONDED/GROUNDED IN ACCORDANCE WITH MIL-STD-1310H(NAVY). 3. AFTER REMOVAL OF THE UNUSED STUFFING TUBE, BLANK WITH BUILD UP WELD FOR THE REMAINING HOLE. AFTER REMOVAL OF THE UNUSED STUFFING TUBE, BLANK WITH BUILD UP WELD FOR THE REMAINING HOLE. ALL WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH TABLE 2 OF NAVSEA STD ITEM (NSI) NO. 009-012. 012. 12. . 4. EXISTING CAPILLARY TUBE AND CABLE FOR THERMOSTAT SHALL BE REUSED. THE TEMPERATURE SETTING OF THE EXISTING CAPILLARY TUBE AND CABLE FOR THERMOSTAT SHALL BE REUSED. THE TEMPERATURE SETTING OF THE USED. THE TEMPERATURE SETTING OF THE . THE TEMPERATURE SETTING OF THE THE TEMPERATURE SETTING OF THE REPLACED THERMOSTAT SHALL BE ADJUSTED BY S/F. 5. ITEM 3 & 4 SHALL NOT REQUIRE CALIBRATION. ITEM 3 & 4 SHALL NOT REQUIRE CALIBRATION. TEST NOTE: T1. AFTER COMPLETION OF WORK, AIR HOSE TEST SHALL BE CONDUCTED APPLYING THE METHOD ON PARAGRAPH 192f OF REF (e) OR NAVSEA STD ITEM 009-025.
AutoCAD SHX Text_1
%%U ENGRG INST
AutoCAD SHX Text_2
NO
AutoCAD SHX Text_3
ITEM
AutoCAD SHX Text_4
SPEC/MATERIAL
AutoCAD SHX Text_5
REMARKS
AutoCAD SHX Text_6
QTY
AutoCAD SHX Text_7
DESCRIPTION
AutoCAD SHX Text_8
NO
AutoCAD SHX Text_9
ITEM
AutoCAD SHX Text_10
AutoCAD SHX Text_11
MATERIAL LIST
AutoCAD SHX Text_12
NSN
AutoCAD SHX Text_13
AutoCAD SHX Text_14
AutoCAD SHX Text_15
2 EA
AutoCAD SHX Text_16
AutoCAD SHX Text_17 5930-01-023-9214
AutoCAD SHX Text_18
1 EA
AutoCAD SHX Text_19
AutoCAD SHX Text_20
P/N: 3ADS-120U CAGE: 63044 OR EQL SEE NOTE 5
AutoCAD SHX Text_21
1 EA
AutoCAD SHX Text_22
AutoCAD SHX Text_23
SWITCH, THERMOSTAT
AutoCAD SHX Text_24
CROSSTIER, STEEL, LG 7"
AutoCAD SHX Text_25
15 EA
AutoCAD SHX Text_26
STEEL
AutoCAD SHX Text_27
P/N: 3CTS-07 CAGE: 63044 OR EQL
AutoCAD SHX Text_28
ANGLE DOWNCOMER, STEEL, LG 120"
AutoCAD SHX Text_29
CHANNEL DOWNCOMER, STEEL, LG 10'
AutoCAD SHX Text_30
P/N: 3CDS-120 CAGE: 63044 OR EQL SEE NOTE 5
AutoCAD SHX Text_31
AutoCAD SHX Text_32
38K6112301A01 ENCLOSURE-01 Sheet 2 of 5
AutoCAD SHX Text_33
AutoCAD SHX Text_34
AutoCAD SHX Text_35
AutoCAD SHX Text_36
AutoCAD SHX Text_37
AutoCAD SHX Text_38
AutoCAD SHX Text_39
AutoCAD SHX Text_40 C
AutoCAD SHX Text_41
SHIP
AutoCAD SHX Text_42
FWD
AutoCAD SHX Text_43 B
AutoCAD SHX Text_44
AutoCAD SHX Text_45
AutoCAD SHX Text_46 A
AutoCAD SHX Text_47
AutoCAD SHX Text_48 A
AutoCAD SHX Text_49
AutoCAD SHX Text_50 A
AutoCAD SHX Text_51
UPTAKE ENGINE RM NO. 1
AutoCAD SHX Text_52 02-186-0-Q
AutoCAD SHX Text_53
DLS MAGAZINE NO. 1
AutoCAD SHX Text_54 02-186-2-M
AutoCAD SHX Text_55
DLS MAGAZINE NO. 2
AutoCAD SHX Text_56 02-194-1-M
AutoCAD SHX Text_57
%%U ENGRG INST
AutoCAD SHX Text_58
PLAN 2-A
AutoCAD SHX Text_59
- SCALE : NONE -
AutoCAD SHX Text_60
02 LVL UPTAKE ENGINE RM NO. 1
38K6112301A01 ENCLOSURE-01 Sheet 3 of 5
AutoCAD SHX Text_61
%%U ENGRG INST
AutoCAD SHX Text_62
CKT R-RA96(R4)
AutoCAD SHX Text_63
AutoCAD SHX Text_64
(REPLT)
AutoCAD SHX Text_65
CABLE HANGER (9 EA)
AutoCAD SHX Text_66
SEE DET 5-B FOR REPLT
AutoCAD SHX Text_67
EL 3-B
AutoCAD SHX Text_68
LKG OUTBOARD
AutoCAD SHX Text_69
- SCALE : NONE -
AutoCAD SHX Text_70
REPLT
AutoCAD SHX Text_71
02 LVL UPTAKE ENGINE RM NO. 1
AutoCAD SHX Text_72
MTG PAD FOR DETROIT SW
AutoCAD SHX Text_73
(EXST)
AutoCAD SHX Text_74
SECT 3-A
AutoCAD SHX Text_75
LKG FWD
AutoCAD SHX Text_76
- SCALE : NONE -
AutoCAD SHX Text_77
REPLT
AutoCAD SHX Text_78
02 LVL UPTAKE ENGINE RM NO. 1
AutoCAD SHX Text_79
AutoCAD SHX Text_80
AutoCAD SHX Text_81
THERMOSTAT, CKT LC24-1L-D12(3)
AutoCAD SHX Text_82
AutoCAD SHX Text_83
(REPLT)
AutoCAD SHX Text_84
CAPILLARY TUBE
AutoCAD SHX Text_85
(EXST)
AutoCAD SHX Text_86
TUBING DRUM
AutoCAD SHX Text_87
(EXST)
AutoCAD SHX Text_88
SEE NOTE 4
38K6112301A01 ENCLOSURE-01 Sheet 4 of 5
AutoCAD SHX Text_89
04 LVL DK
AutoCAD SHX Text_90
03 LVL DK
AutoCAD SHX Text_91
CKT R-RA96(R4)
AutoCAD SHX Text_92
(REPLT)
AutoCAD SHX Text_93
CABLE HANGER (5 EA)
AutoCAD SHX Text_94
SEE DET 5-B FOR REPLT
AutoCAD SHX Text_95
CKT R-RA96(R4)
AutoCAD SHX Text_96
(REPLT)
AutoCAD SHX Text_97
CABLE HANGER
AutoCAD SHX Text_98
SEE DET 5-B FOR REPLT
AutoCAD SHX Text_99
AutoCAD SHX Text_100
AutoCAD SHX Text_101
AutoCAD SHX Text_102
AutoCAD SHX Text_103
AutoCAD SHX Text_104
AutoCAD SHX Text_105
SECT 4-A 4-A -A
AutoCAD SHX Text_106
LKG AFT
AutoCAD SHX Text_107
- SCALE : NONE -
AutoCAD SHX Text_108
REPLT
AutoCAD SHX Text_109 03 LVL UPTAKE ENGINE RM NO. 13 LVL UPTAKE ENGINE RM NO. 1 LVL UPTAKE ENGINE RM NO. 1
AutoCAD SHX Text_110
CONTINUED TO SECT 4-B
AutoCAD SHX Text_111
FOR CABLE HANGER
AutoCAD SHX Text_112
SECT 4-B 4-B -B B
AutoCAD SHX Text_113
LKG AFT
AutoCAD SHX Text_114
- SCALE : NONE -
AutoCAD SHX Text_115
REPLT
AutoCAD SHX Text_116 04 LVL UPTAKE ENGINE RM NO. 14 LVL UPTAKE ENGINE RM NO. 1 LVL UPTAKE ENGINE RM NO. 1
AutoCAD SHX Text_117
%%U ENGRG INST
38K6112301A01 ENCLOSURE-01 Sheet 5 of 5
AutoCAD SHX Text_118
AutoCAD SHX Text_119
(REPLT)
AutoCAD SHX Text_120
CHANNEL DOWNCOMER (TYP)
AutoCAD SHX Text_121
DET 5-B (TYP)
AutoCAD SHX Text_122
- SCALE : NONE -
AutoCAD SHX Text_123
REPLT
AutoCAD SHX Text_124
CABLE HANGAR ASSY
AutoCAD SHX Text_125
(EXST) REUSE
AutoCAD SHX Text_126
STUD FOR CABLE HANGER
AutoCAD SHX Text_127
(EXST-REUSE)
AutoCAD SHX Text_128
CABLE SADDLE
AutoCAD SHX Text_129
(RMV)
AutoCAD SHX Text_130
UNUSED STFG TUBE (4 EA), STEEL
AutoCAD SHX Text_131
SEE NOTE 3
AutoCAD SHX Text_132
THERMOSTAT, CKT LC24-1L-D12(4)
AutoCAD SHX Text_133
AutoCAD SHX Text_134
(REPLT)
AutoCAD SHX Text_135
MTG PAD FOR DETROIT SW
AutoCAD SHX Text_136
(EXST)
AutoCAD SHX Text_137
SECT 5-A
AutoCAD SHX Text_138
LKG FWD
AutoCAD SHX Text_139
- SCALE : NONE -
AutoCAD SHX Text_140
REPLT
AutoCAD SHX Text_141
02 LVL UPTAKE ENGINE RM NO. 1
AutoCAD SHX Text_142
WTRTT TRANSV BHD
AutoCAD SHX Text_143
7.65# HS
AutoCAD SHX Text_144
AutoCAD SHX Text_145
%%U ENGRG INST
AutoCAD SHX Text_146
CAPILLARY TUBE
AutoCAD SHX Text_147
(EXST)
AutoCAD SHX Text_148
TUBING DRUM
AutoCAD SHX Text_149
(EXST)
AutoCAD SHX Text_150
SEE NOTE 4
AutoCAD SHX Text_151
(REPLT)
AutoCAD SHX Text_152
ANGLE DOWNCOMER (TYP)
AutoCAD SHX Text_153
(REPLT)
AutoCAD SHX Text_154
CROSSTIER, STEEL (TYP)
AutoCAD SHX Text_155
DDG-115 RAFAEL PERALTA
Cited from TGI No. 3815C12310A01-DL005 Report-1
UPTAKE ENGINE
ROOM NO. 1
02 LEVEL DECK
(02-186-0-Q)
LKG DECK
FWD
AFT
FR186
STBD
L5P
L4P
L3P
L2P
L1P
CL
L1S
L2S
L3S
L4S
L5S
FR194
FR206
FR215
394041
444546
60 59
69 70 71 72
78 79
81 82
88 89
38K6112301A01
SKETCH
ENCLOSURE-02 Sheet 1 of 4
Reiya.Kimura.ja Oval
Reiya.Kimura.ja_1 Oval
Reiya.Kimura.ja_2 Oval
Reiya.Kimura.ja_3 Text Box
1B GTM
Reiya.Kimura.ja_4 Text Box
1A GTM
Reiya.Kimura.ja_5 Text Box
#1 SSGTG
Reiya.Kimura.ja_6 Underline
93-1 93-2
93-4
1.3.1 Quantity (20 SF), Insulation and Lagging, Exhaust Duct, 1A Gas Turbine Module (GTM)
38K6112301A01
SKETCH
ENCLOSURE-02 Sheet 2 of 4
Reiya.Kimura.ja_7
23-1 23-2
23-4 23-5
1.3.2 Quantity (20 SF), Insulation and Lagging, Exhaust Duct, 1B GTM
38K6112301A01
SKETCH
ENCLOSURE-0238K6112301A01
SKETCH
ENCLOSURE-02 Sheet 3 of 4
Reiya.Kimura.ja_8
24-2
24-3
1.3.3 Quantity (32 SF), Insulation and Lagging, Exhaust Duct, No. One Ship Service Gas Turbine Generator (SSGTG)
38K6112301A01
SKETCH
ENCLOSURE-02 Sheet 4 of 4
Reiya.Kimura.ja_9
SHEET 1 OF 11
OUTBD PROFILE
FWD STACK, STBD
LKG INBD
SKETCH
ENCLOSURE-03
PLAN 2-A
38K6112301A01
PLAN 7-A
PLAN 11-A
FWD STACK
68’-0” ABL
03 LVL
76’-5” ABL
LOCATION MAP OF VARIOUS EQUIPMENT IN 02-186-0-Q, 02 LEVEL
SHEET 2 OF 1138K6112301A01
FWD
PLAN 2-A
02-186-0-Q, 02 LVL
SKETCH
ENCLOSURE-03
SECT 3-A
EL 4-A
SECT 4-D
SECT 6-A
EL 5-A
LOCATION OF UNUSED STUD LISTED IN 1.3.4.1 & 1.3.4.2
SECT 3-A
TRNSV BHD FR 212, STBD
LKG AFT
DET 3-B
DET 3-C
SHEET 3 OF 1138K6112301A01
SKETCH
ENCLOSURE-03
DET 3-C
UNUSED STUD LISTED IN 1.3.4.2
DET 3-B
UNUSED STUD LISTED IN 1.3.4.1
UNUSED STUD
UNUSED STUD
LOCATION OF UNUSED STUD LISTED IN 1.3.4.3 & 1.3.4.4
EL 4-A
LONG BHD, STACK SIDE
FR 206-212, PORT
LKG OUTBD
SHEET 4 OF 1138K6112301A01
SKETCH
ENCLOSURE-03
DET 4-B
UNUSED STUD LISTED IN 1.3.4.3
UNUSED STUD
UNUSED STUD
FR 206FR 220
FWD
DET 4-C
DET 4-E
DET 4-B
UNUSED STUD
DET 4-C
UNUSED STUD LISTED IN 1.3.4.3
SECT 4-D
SLOPING TRANSV BHD
FR 220, PORT
LKG AFT
02 LVL
DET 4-E
UNUSED STUD LISTED IN 1.3.4.4
LOCATION OF UNUSED STUD LISTED IN 1.3.4.5
DET 5-C
SHEET 5 OF 1138K6112301A01
SKETCH
ENCLOSURE-03
DET 5-C
UNUSED STUD LISTED IN 1.3.4.5
DET 5-B
UNUSED STUD LISTED IN 1.3.4.5
UNUSED STUD
UNUSED STUD
EL 5-A
LONG BHD, STACK SIDE
FR 200-206, PORT
LKG OUTBD
FR 200FR 206
FWD
DET 5-B
CABLE TRUNK LISTED IN 1.3.11
SHEET 6 OF 1138K6112301A01
SKETCH
ENCLOSURE-03
SECT 6-A
CABLE TRK ON SLOPING TRANSV BHD
FR 186, LKG FWD
LEGEND
- REMAINING PORTION OF STUD
- REMAINING BOLT HOLE
LOCATION MAP OF VARIOUS EQUIPMENT IN 02-186-0-Q, BETW 03 & 04 LEVEL
SHEET 7 OF 1138K6112301A01
FWD
PLAN 7-A
HORIZ FRAMING 68’-0” ABL, 02-186-0-Q
BETW 03 & 04 LVL
SKETCH
ENCLOSURE-03
SECT 10-A
DET 8-B
DET 8-C
DET 8-A
DET 8-D
SECT 9-A
LOCATION OF UNUSED PADEYE LISTED IN 1.3.5.2 & 1.3.5.3
SHEET 8 OF 1138K6112301A01
SKETCH
ENCLOSURE-03
DET 8-A
UNUSED PADEYE LISTED IN 1.3.5.2
LOWER SIDE OF HORIZ FRAMING, PORT
LKG FWD
UNUSED PADEYE
DET 8-C
UNUSED PADEYE LISTED IN 1.3.5.3
FLG PL OF HORIZ FRAMING, STBD
LKG FWD
UNUSED PADEYE
DET 8-B
UNUSED PADEYE LISTED IN 1.3.5.3
FLG PL OF HORIZ FRAMING, PORT
LKG FWD
UNUSED PADEYE
UNUSED PADEYE
DET 8-D
UNUSED PADEYE LISTED IN 1.3.5.2
LOWER SIDE OF HORIZ FRAMING, STBD
LKG FWD
LOCATION OF UNUSED CABLE STUD LISTED IN 1.3.6.2 & 1.3.6.3, AND CABLE CLAMP LISTED IN 1.3.7
SHEET 9 OF 1138K6112301A01
SKETCH
ENCLOSURE-03
DET 9-B
UNUSED CABLE STUD LISTED IN 1.3.6.2
SECT 9-A
SLOPING TRANSV BHD
FR 186, STBD
LKG FWD
DET 9-B
68’-0” ABL
76’-5” ABL
DET 9-C
DET 9-C
UNUSED CABLE STUD LISTED IN 1.3.6.3
DET 9-D
UNUSED CABLE CLAMP LISTED IN 1.3.7
DET 9-D
LOCATION OF UNUSED CABLE STUD LISTED IN 1.3.6.1
SHEET 10 OF 1138K6112301A01
SKETCH
ENCLOSURE-03
SECT 10-A
SLOPING TRANSV BHD
FR 220, PORT
LKG AFT
DET 10-B
68’-0” ABL
76’-5” ABL
DET 10-B
UNUSED CABLE STUD LISTED IN 1.3.6.1
UNUSED CABLE STUD
FWD
LOCATION OF UNUSED PADEYE LISTED IN 1.3.5.1
SHEET 11 OF 1138K6112301A01
PLAN 11-A
STACK TOP 81’-3” ABL, 02-186-0-Q
SKETCH
ENCLOSURE-03
DET 11-D
DET 11-A
DET 11-B
DET 11-A
UNUSED PADEYE
FR 197-200, PORT
DET 11-C
UNUSED PADEYE
FR 203-205, STBD
DET 11-B
UNUSED PADEYE
FR 197-200, STBD
FR 193
DET 11-C
FR 200FR 208 FR 203
DET 11-D
UNUSED PADEYE
FR 205-208, PORT