This is a WebAIM Short Form Task Group Instruction (TGI) for the USS Rafael Peralta (DDG-115), a naval destroyer. The document outlines preservation and replacement work for a ventilation hood system at Frame 240, 01 Level Weather on the vessel, with a work period from August 3, 2026 to September 1, 2026.
The scope encompasses removal and replacement of two bolted access covers and two punched weather screens of the vent hood located at Frame 240 (Port and Starboard), plus preservation treatment of approximately 56 square feet of interior vent hood surface including transverse bulkhead plating. The work references Supply Systems 2-271-1 and 3-252-2 and requires compliance with preservation requirements per Reference No. One (NSI FY-26 NAVSEA Standard Items), specifically accomplishing 009-032 requirements including Table 5, Line 23 for the access covers and weather screens, and Table 2, Line 1 for the interior surfaces. Materials to be furnished by contractor include stainless steel sheet metal (1 sheet, 4'x8', 0.125" thickness), stainless steel and nylon fasteners (screws, washers), and rubber sheeting. SRF-JRMC will provide government-furnished materials and service work including crane services, electrical utilities, water/steam/air supply, safety and gas-free inspections, and QA inspection. Related work for disconnection/reconnection of shower power cable and exterior surface preservation is covered under separate TGIs. The instruction was prepared by S. Yamaoka (Code 231B) and approved by R. Takagi (Code 231B) on October 31, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
21-JAN-2026 1605
20.15.6.0.9333 (July 2025) ICN: 38K6113601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: VNT HOOD FR 240 AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - ACCOMPLISH PRESERV OF VNT HOOD AND RPLACMNT OF WEA SCRN IN 01LVL WEA,FR240
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
ER09L008
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
YAMAOKA, SHINJI 231B 3152439882 31-OCT-2025
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 31-OCT-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ER09-L008
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
136A0001
1. SCOPE/PURPOSE:
1.1 Title: Preservation of Vent Hood and Replacement of Weather Screen in 01 Level Weather Frame 240; accomplish
1.2 Location of Work:
1.2.1 01 Level Weather, Frame 240, Port and Starboard (Stbd)
1.2.2 02 Level Weather, Frame 240, Port and Stbd
1.3 Identification:
1.3.1 Quantity (2 EA), Bolted Access Cover of Vent Hood, 01 Level Weather, Frame 240, Port and Stbd
System No.: Supply System (SS) 2-271-1 and SS 3-252-2 Remarks: See Sketch Enclosure-01 for location, Sheet 3A, Elevations 4A-7E, and 4C-1C of Ref. No. 3 for details.
TGI Short Form
21-JAN-2026 1605
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6113601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: VNT HOOD FR 240 AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - ACCOMPLISH PRESERV OF VNT HOOD AND RPLACMNT OF WEA SCRN IN 01LVL WEA,FR240
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.3.2 Quantity (2 EA), Punched Weather Screen of Vent Hood, 01 Level Weather, Frame 240, Port and Stbd
System No.: SS 2-271-1 and SS 3-252-2 Remarks: See Sketch Enclosure-01 for location, Sheet 3A, Elevations 4A-7E, and 4C-1C of Ref. No. 3 for details.
1.3.3 Quantity (56 SF), Interior Surface of Vent Hood, including transverse bulkhead plating frame 240, 01 Level Weather, Frame 240, Port and Stbd
System No.: SS 2-271-1 and SS 3-252-2 Remarks: See Sketch Enclosure-01 for location.
The area excepts the bolted access covers.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. PROCEDURE:
2.1 Remove each existing bolted access cover and punched weather screen listed in 1.3.1 and 1.3.2, using Ref. No. 3 for guidance.
2.2 Fabricate each new punched weather screen listed in 1.3.2, using Ref. No. 3 for guidance.
2.3 Accomplish the requirements of 009-032 of Ref. No. One, including Table 5, Line(s) 23, for each area listed in 1.3.1 and 1.3.2.
2.4 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) One, for each area listed in 1.3.3.
2.5 Install each bolted access cover and punched weather screen listed in 1.3.1 and 1.3.2, using Ref. No. 3 for guidance.
2.6 Notes:
2.6.1 Planner: Code 231B S. Yamaoka, 243-9882
2.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
2.6.3 Disconnection and reconnection of shower power cable will be covered by TGI No(s). 38K6113601U01 and
38K6113601R01 (SRF-JRMC TGI).
2.6.4 Preservation work for exterior surface of vent hood will be covered by TGI No. 38K6113602A01 (KTR TGI).
2.6.5 JCN ER09-L008 is related to this TGI.
2.7 Government Furnished Material (GFM):
Kouichi.Yoshida.ja Typewritten Text 8/3/2026
Kouichi.Yoshida.ja Typewritten Text 9/1/2026
21-JAN-2026 1605
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6113601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: VNT HOOD FR 240 AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - ACCOMPLISH PRESERV OF VNT HOOD AND RPLACMNT OF WEA SCRN IN 01LVL WEA,FR240
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.7.1 SRF-JRMC will provide GFM listed in the Material List.
2.8 SRF-JRMC will provide the following service work: (TGI No. 38K6113601S02)
2.8.1 [C740] Crane and crane rigging service.
2.8.2 [X99E] Utilities service, electrical.
2.8.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
2.8.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.8.6 [C133] QA Inspection for (G) symbol(s).
21-JAN-2026 1605
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6113601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: VNT HOOD FR 240 AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - ACCOMPLISH PRESERV OF VNT HOOD AND RPLACMNT OF WEA SCRN IN 01LVL WEA,FR240
FOUO Pg 4 of 5
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items ORG N
3 DWG 512-7027471 HTG VENT AIR COND INSTL
DSGN ZONE 4510 01 LVL FR
240-277
M Y 3A, 4A, 4C
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 1 M SHEET,METAL, SIZE: 4' X 8',
.125"THK, MTL: CRES 316L
ORDERED FOR KTR
ORIG: C231 S.YAMAOKA,
PHONE: 243-9882
9B 9515 002044595 NA 4 N 53175731 1/SH
002 2 M SCREW,CA, SIZE: 1/4"-20,3/4"L,
MTL: CRES 316
ORDERED FOR KTR
ORIG: C231B S.YAMAOKA,
PHONE: 243-9882
9B 5305 013723542 NA 4 N 53175734
130/EA
003 2 M WASHER,F, MTL: NYLON
ORDERED FOR KTR
ORIG: C231B S.YAMAOKA,
PHONE: 243-9882
9B 5310 005020106 NA 4 N 53175225
100/EA
004 2 M WASHER,F, MTL: CRES
ORDERED FOR KTR
ORIG: C231B S.YAMAOKA,
PHONE: 243-9882
9B 5310 005505054 NA 4 N 53175228 1/HD
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
1 512-7027471 M 2 512-7027318 G 3 512-6220213 R
ICN: 38K6113601 KEY OP: A01
21-JAN-2026 1605
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6113601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: VNT HOOD FR 240 AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: F/O - ACCOMPLISH PRESERV OF VNT HOOD AND RPLACMNT OF WEA SCRN IN 01LVL WEA,FR240
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
005 3 M RUBBER SHEET,SOLID,,
ORDERED FOR KTR
ORIG: C231B S.YAMAOKA,
PHONE: 243-9882
9B 5330 001790052 NA 4 N 53175737 3/SY
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38K6113601A01-Sketch.pdf 31-OCT-2025 0000
Sheet 1 of 1
SKETCH
ENCLOSURE-0138K6113601A01
PLAN 1-A
SECTION 1-B
Bolted Access Cover and Punched Weather Screen
See Section 1-B
Bolted Access Cover
Punched Weather Screen
Vent Hood