TGI_38K6154103A02_c0v0.pdf

PDF 1 MB Posted

Attached to
USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
Solicitation number
N6264926RA036
Issued by

About this file

This is a WebAIM Short Form Task Group Instruction (TGI) for maintenance work on the USS Rafael Peralta (DDG-115), a naval vessel. The document provides detailed specifications for dewatering Fuel Tank Groups 5 and 6, issued on January 30, 2026, with ICN 38K6154103.

The work involves dewatering six fuel tanks across two groups with a combined total capacity of approximately 132,900 gallons and a required water removal of 47,700 gallons. Fuel Tank Group-5 comprises three tanks (Fuel Receiving Tank 5-308-1-F with 30,038-gallon capacity, Fuel Tank 5-354-0-F with 38,127-gallon capacity, and Fuel Expansion Seawater Overflow Tank 4-370-3-F with 1,530-gallon capacity), while Fuel Tank Group-6 also comprises three tanks (Fuel Receiving Tank 5-308-2-F with 30,032-gallon capacity, Fuel Tank 5-370-0-F with 31,545-gallon capacity, and Fuel Expansion Seawater Overflow Tank 4-370-4-F with 1,873-gallon capacity). The work locations include multiple crew living spaces, access trunks, passages, and the generator room. The contractor work is scheduled to begin on July 27, 2026, and conclude by September 4, 2026. SRF-JRMC will provide supporting services including crane and rigging services, electrical utilities, air/water/steam supply, safety and gas-free inspections for employees, and quality assurance inspections. A related Fuel Transfer Valve replacement (TGI No. 38K6154103A01) will occur concurrently with this dewatering task.

View the file

Other files

File Type Posted
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6112321A01_c0v0_REV1.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6112317A01_c0v0_REV1.pdf PDF
TGI_38K6112001A01_c0v0_REV1.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
TGI_38K6186301A01_c0v0_rev1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
Attachment IV Request for Information Form.pdf PDF
N6264926RA0360001 SF30.pdf PDF
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI_38K6112318A01_c0v0.pdf PDF
TGI 38K6186301A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
TGI 38K6171101A01_c0v0.pdf PDF
TGI_38K6112001A01_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EB140579

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SUZUKI, AKIRA 231B 3152430968 17-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 17-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EB14-0579

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

541A1203

1. SCOPE/PURPOSE:

1.1 Title: Fuel Tank Group-5 and Group-6; dewater

1.2 Location of Work:

1.2.1 Crew Living Space No. 4 (3-300-1-L)

1.2.2 Access Trunk (3-308-2-T)

1.2.3 Crew Living Space No. 6 (3-338-3-L)

1.2.4 Passage (3-338-6-L)

1.2.5 Crew Living Space No. 7 (3-350-2-L)

1.2.6 Generator Room (3-370-0-E)

TGI Short Form

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3 Identification:

1.3.1 Quantity (One EA), Fuel Receiving Tank Group-6

Tank No.: 5-308-2-F Capacity: 30,032 Gallons

1.3.2 Quantity (One Lot/3 Tanks), Fuel Tank Group-5

Total Capacity: 69,695 Gallons Required amount of water to dewater: 47,700 Gallons

1.3.2.1 Fuel Receiving Tank Group-5

Tank No.: 5-308-1-F Capacity: 30,038 Gallons

1.3.2.2 Fuel Tank Group-5

Tank No.: 5-354-0-F Capacity: 38,127 Gallons

1.3.2.3 Fuel Expansion Seawater Overflow Tank Group-5

Tank No.: 4-370-3-F Capacity: 1,530 Gallons

1.3.3 Quantity (One Lot/3 Tanks), Fuel Tank Group-6

Total Capacity: 63,450 Gallons Required amount of water to dewater: 47,700 Gallons

1.3.3.1 Fuel Receiving Tank Group-6

Tank No.: 5-308-2-F Capacity: 30,032 Gallons

1.3.3.2 Fuel Tank Group-6

Tank No.: 5-370-0-F Capacity: 31,545 Gallons

1.3.3.3 Fuel Expansion Seawater Overflow Tank Group-6

Tank No.: 4-370-4-F Capacity: 1,873 Gallons

1.4 Security Classification: None.

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition:

1.5.1 CASREP C-2, DTG: 242351ZMAR ’25, SERIAL: 25040

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Dewater each tank listed in 1.3.1. See 2.2.3.

2.1.1 Accomplish the requirements of 099-909YO of Ref. No. 2 for each tank listed in 1.3.2 and 1.3.3.

2.1.2 Accomplish the requirements of 009-009 of Ref. No. One.

2.2 Notes:

2.2.1 Planner: Code 231B A. Suzuki, 243-0968

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 Fuel Transfer Valve FT-V-122B located in 5-300-01-E will be replaced by SRF-JRMC (TGI No. 38K6154103A01).

2.2.4 JCN EB14-0579 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38K6154103S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

Kouichi.Yoshida.ja Typewritten Text 7/27/2026

Kouichi.Yoshida.ja Typewritten Text 9/4/2026

30-JAN-2026 0848

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154103 KeyOp: A02

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: FO TK GP-5 & GP-6 AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 2

CU PHASE TITLE: F/O - DEWATER FUEL TANK GROUP-5 AND GROUP-6

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6154103 KEY OP: A02

File details come from the government source that posted it. Updated .