TGI_38K6113602A01_c0v0.pdf
PDF 1 MB Posted
- Attached to
- USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
- Solicitation number
- N6264926RA036
About this file
This is a Task Group Instruction (TGI) document for preservation and maintenance work on the USS Rafael Peralta (DDG-115) naval destroyer.
The TGI specifies bulkhead plating and antenna 2-4 platform preservation work located between 01 Level and 05 Level Weather, Frames 202-247, on both port and starboard sides of the vessel. The total work scope encompasses approximately 1,900 square feet of exterior bulkhead plating surfaces, including vertical ladders, radar cross-section composite panel interior surfaces, vent louvers, watertight door panels, and a 160 square foot antenna platform for the AS-3772B/U Antenna 2-4. Specific areas requiring preservation include house side sloping bulkhead plating (420 SF per side), transverse bulkhead plating at Frame 228 with 450V outlet covers, sloping transverse bulkhead plating at Frame 240, and stack front bulkhead plating spanning 02-05 Level Weather (630 SF). Additional work involves rubber tile installation and removal on select surfaces totaling approximately 180 square feet combined.
Work procedures require surface preparation to bare metal per SSPC-SP 11 specifications and completion of painting requirements per 009-032 specifications, with specific table line references for different surface types. The contractor work start date is 8/3/2026 with completion required by 9/1/2026. Supporting SRF-JRMC service work includes crane and rigging, electrical utilities, water and steam supply, safety inspections, gas-free inspections, and QA inspection for specified symbols. The document was prepared and approved on 26-NOV-2025 by Code 231B personnel with contact information provided. References include NAVSEA Standard Items (NSI FY-26), Local Standard Items (LI FY-26), and SSPC Painting Manual Volume 2.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: BHD&PLTF FR 202-247 AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE:
*F/O - PSV BHD PLTG & ANT PLFT, 01 LVL - 05 LVL WEA, FR 202 - 247, PORT & STBD
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
MASAMICHI HAGA 231B. 315-243-2513 26-NOV-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 26-NOV-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: BHD&PLTF FR 202-247 AY A 0
FOUO
SHIP: DDG-115 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J 1-2 M-1 Sketch (1)
1. SCOPE/PURPOSE
1.1 Title: Bulkhead Plating and Antenna 2-4 Platform, between 01 Level and 05 Level Weather, Frames between 202 and 247, Port and Starboard (Stbd); preserve
1.2 Location of Work:
1.2.1 Between 01 Level and 05 Level Weather, Frames between 202 and 247, Port and Stbd
1.2.2 Fan Room Pressure Zone (PZ) No. 2 (01-200-2-Q)
1.2.2.1 Vent Plenum for HVAC Supply System (SS) 01-202-2
1.2.2.2 Vent Plenum for HVAC SS 2-204-1
1.2.3 Replenishment Gear Locker (01-201-1-A)
1.2.3.1 Vent Plenum for HVAC Exhaust System 01-207-1
1.2.4 Pallet Trunk Stowage/Battery Charging Room (01-205-0-Q)
1.2.4.1 Vent Plenum for HVAC SS 01-218-1
1.2.5 Fan Room PZ No. 3 (01-240-01-Q)
1.2.5.1 Vent Plenum for HVAC SS 01-252-2 and SS 01-252-4
1.3 Identification:
1.3.1 Quantity (1,900 SF in Total), Exterior Surface of Bulkhead Plating, between 01 Level and 05 Level Weather, Frames between 202 and 247, including vertical ladder, inside bulkhead surface of radar cross section composite panel, and exterior surface of vent louver and door panel of watertight door, Port and Stbd
Remarks:
See Sketch Enclosure-01 for location details.
The area is accessible area only.
The area excludes where rubber tile installed surface listed in 1.3.3 through 1.3.9.
1.3.1.1 Quantity (420 SF), House Side Sloping Bulkhead Plating and Diagonal House Side Bulkhead Plating, 01 Level Weather, Frames between 202 and 228, Port
1.3.1.2 Quantity (420 SF), House Side Sloping Bulkhead Plating and Diagonal House Side Bulkhead Plating, 01 Level Weather, Frames between 202 and 228, Stbd
1.3.1.3 Quantity (10 SF), Transverse Bulkhead Plating Frame 228, 01 Level Weather, including exterior surface of cover plate for 450V multi purpose outlet 01-228-1, Port and Stbd
FOUO
SHIP: DDG-115 CHG/VER: 0/0
1.3.1.4 Quantity (420 SF), Sloping Transverse Bulkhead Plating Frame 240, 01 Level Weather, including exterior surface of vent hood for SS 2-271-1 and SS 3-252-2, Port and Stbd
Remarks: The area excludes where bolted access cover and interior surface of vent hood for SS 2-271-1 and SS 3-252-2, including transverse bulkhead plating.
1.3.1.5 Quantity (630 SF), Stack Front Bulkhead Plating, between 02 Level and 05 Level Weather, Frames between 240 and 247, Port and Stbd
1.3.2 Quantity (160 SF), Entire Antenna Platform for AS-3772B/U Antenna 2-4, Frames between 241 and 247, 77 Feet 5 Inches Above Base Line (ABL), including foundation of whip antenna and antenna tuning nuit, liferail, and stanchion, Port and Stbd
Remarks:
The area is accessible area only.
The area excludes where rubber tile installed surface listed in 1.3.10 and deck plating listed in 1.3.11.
1.3.3 Quantity (130 SF), Transverse Bulkhead Plating Frame 228, 01 Level Weather, including door frame of watertight door 01-228-1 and 01-228-2, Port and Stbd
Remarks: The area where rubber tile is installed.
1.3.4 Quantity (18 SF), Door Panel of Watertight Door 01-228-2, 01 Level Weather, Frame 228, Port
Remarks: The area where rubber tile is installed.
1.3.5 Quantity (5 SF in Total), Ladder Clip and Climber Safety Rail Bracket on Bulkhead Plating, between 01 Level and 05 Level Weather, Frames between 219 and 247, Port and Stbd
Remarks: The area where rubber tile is installed.
1.3.6 Quantity (One SF in Total), Hinge Assembly of Watertight Door 01-217-1 on House Side Sloping Bulkhead Plating, 01 Level Weather, Frames between 215 and 219, Stbd
Remarks: The area where rubber tile is installed.
1.3.7 Quantity (One SF in Total), Door Frame of Watertight Door 01-222-1 on House Side Sloping Bulkhead Plating, 01 Level Weather, Frames between 221 and 225, Stbd
Remarks: The area where rubber tile is installed.
1.3.8 Quantity (12 SF), Door Panel of Watertight Door 01-228-1, 01 Level Weather, Frame 228, Stbd
Remarks: The area where rubber tile is installed.
1.3.9 Quantity (3 SF in Total), Backstay Padeye on Stack Front Bulkhead Plating, 02 Level Weather, Frames between 241 and 242, Port and Stbd
Remarks: The area where rubber tile is installed.
1.3.10 Quantity (12 SF in total), Antenna Platform for AS-3772B/U Antenna 2-4, Frames between 241 and 247, 77 Feet 5 Inches ABL, Port and Stbd
Remarks: The area where rubber tile is installed.
FOUO
SHIP: DDG-115 CHG/VER: 0/0
1.3.11 Quantity (60 SF), Deck Plating of Antenna Platform for AS-3772B/U Antenna 2-4, Frames between 241 and 247, 77 Feet 5 Inches ABL, including vertical surface up to height of 4 inches from deck in and around peel and stick deck covering area, Port and Stbd
Remarks:
The area is accessible area only.
The area excludes where vertical surface of stack front bulkhead plating listed in 1.3.1.5.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) One, for each area listed in 1.3.1 and
1.3.2. See 5.4.5.
5.2 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 50, for each area listed in 1.3.3 and 1.3.4, and Table 2, Line(s) 46, for each area listed in 1.3.5 through 1.3.10.
5.3 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 23, for each area listed in 1.3.11.
5.3.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.3.
5.3.2 Accomplish the requirements of 009-026 of 2.1, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.
5.4 Confirm that all personnel have exited the space prior to closure of the space listed in 1.2.5.1. Designate one person to account for all personnel who may have entered the space.
Kouichi.Yoshida.ja Typewritten Text 8/3/2026
Kouichi.Yoshida.ja Typewritten Text 9/1/2026
Kouichi.Yoshida.ja Cross-Out
Kouichi.Yoshida.ja Typewritten Text
1/24/2026 C1209.2 K. YOSHIDA
FOUO
SHIP: DDG-115 CHG/VER: 0/0
5.5 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.6 Notes:
5.6.1 Planner: Code 231B M. Haga, 243-2513
Planner: Code 233 K. Uchimura, 080-9350-1432
5.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
5.6.3 Removal and installation of rubber tile on transverse bulkhead plating, ladder clip, door panel of watertight door, hinge assembly and door frame of watertight door, backstay padeye, and antenna 2-4 platform, between 01 level and 05 level weather, frames between 215 and 247, will be covered by TGI No(s). 38K6113602U02 and
38K6113602R02 (SRF-JRMC TGI).
5.6.4 Preservation work for bolted access cover and interior surface of vent food for SS 2-271-1 and SS 3-252-2, including transverse bulkhead plating will be covered by TGI No. 38K6113601A01 (KTR TGI).
5.6.5 Disconnection and reconnection of shower power cable will be covered by TGI No(s). 38K6113601U01 and
38K6113601R01 (SRF-JRMC TGI).
5.6.6 JCN OD01-L071 is related to this TGI.
5.7 Government Furnished Material (GFM): None.
5.8 SRF-JRMC will provide the following service work: (TGI No. 38K6113602S02)
5.8.1 [C740] Crane and crane rigging service.
5.8.2 [X99E] Utility service, electrical.
5.8.3 [X99M] Utility service, including water supply and steam supply.
5.8.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.8.6 [C133] QA inspection for (G) symbol(s).
FOUO
M-1
SHIP: DDG-115 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
BHD&PLTF FR 202-247 AY A 0 0
CU PHASE TITLE:
*F/O - PSV BHD PLTG & ANT PLFT, 01 LVL - 05 LVL WEA, FR 202 - 247, PORT & STBD
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K6113602 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 BHD&PLTF FR 202-247 AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K6113602 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 BHD&PLTF FR 202-247 AY A 0
Sketch
38K6113602A01 ENCLOSURE-01 Sheet 1 of 1
PLAN VIEW
01 Level and 02 Level Weather Frames Between 200 and 242
01 Level:
Identification 1.3.1.3
Identification 1.3.1.1
Identification 1.3.1.2
Identification 1.3.1.4
Above 02 Level:
Identification 1.3.1.5
File details come from the government source that posted it. Updated .