This is a WebAIM Short Form Task Group Instruction (TGI) document for naval shipboard maintenance work on USS RAFAEL PERALTA (DDG-115). The TGI, numbered 54112-3-300KTR, specifies contractor work to accomplish and document a tightness and operational test for the Fuel Transfer System (T & OP) in accordance with reference document TP 54112-3-300KTR. The work is classified as contractor work under project K61, system 54112, and is designated as a Test and Operational (T & OP) phase task.
The document was prepared by Shigeru Teranishi (Code 246.2) on 28-NOV-2025 and approved by John Sophabmixay (Code 246.2) on 06-DEC-2025. The zone manager for this work is Kazunobu Saito, with work occurring in Zone U. The job summary ID is 541A1201 with a total duration of 1 unit. The reason for the work references change notices EB14-L021 and CE03-L017. The document contains provisions for work certification signatures, completion of work review, and records review by appropriate personnel with badge numbers, shop codes, and contact information to be documented upon completion. No material list items, quantities, or cost data are specified in the instruction.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
24-JAN-2026 0948
20.15.6.0.9333 (July 2025) ICN: 38K6154101 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54112-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 54112
CU PHASE TITLE: FUEL TRANSFER SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EB14L021 * CE03L017
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TERANISHI, SHIGERU 246.2 3152433424 28-NOV-2025
APPROVED BY: CODE: PHONE: DATE:
SOPHABMIXAY, JOHN 246.2 3152432291 06-DEC-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CE03-L017 * EB14-L021
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
541A1201 1
Tightness & Operational Test for Fuel Transfer System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
24-JAN-2026 0948
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154101 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54112-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 54112
CU PHASE TITLE: FUEL TRANSFER SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 54112-3-300KTR FUEL TRANSFER SYS (T &
OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 54112-3-300KTR.
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6154101 KEY OP: T01
File details come from the government source that posted it. Updated .