TGI_38K6154101T01_c0v0.pdf

PDF 87 KB Posted

Attached to
USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
Solicitation number
N6264926RA036
Issued by

About this file

This is a WebAIM Short Form Task Group Instruction (TGI) document for naval shipboard maintenance work on USS RAFAEL PERALTA (DDG-115). The TGI, numbered 54112-3-300KTR, specifies contractor work to accomplish and document a tightness and operational test for the Fuel Transfer System (T & OP) in accordance with reference document TP 54112-3-300KTR. The work is classified as contractor work under project K61, system 54112, and is designated as a Test and Operational (T & OP) phase task.

The document was prepared by Shigeru Teranishi (Code 246.2) on 28-NOV-2025 and approved by John Sophabmixay (Code 246.2) on 06-DEC-2025. The zone manager for this work is Kazunobu Saito, with work occurring in Zone U. The job summary ID is 541A1201 with a total duration of 1 unit. The reason for the work references change notices EB14-L021 and CE03-L017. The document contains provisions for work certification signatures, completion of work review, and records review by appropriate personnel with badge numbers, shop codes, and contact information to be documented upon completion. No material list items, quantities, or cost data are specified in the instruction.

View the file

Other files

File Type Posted
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
TGI_38K6186301A01_c0v0_rev2.pdf PDF
TGI_38K6113801A01_c1v0_REV2.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6113702A01_c0v0_REV1.pdf PDF
TGI_38K6112303A01_c0v0_REV1.pdf PDF
TGI_38K6113601A01_c0v0_REV1.pdf PDF
TGI_38K6113602A01_c0v0_REV1.pdf PDF
TGI_38K6112325A01_c0v0_REV1.pdf PDF
TGI_38K6154103A02_c0v0_REV1.pdf PDF
TGI_38K6144104A01_c0v0_REV1.pdf PDF
TGI_38K6151101A01_c0v0_REV1.pdf PDF
material info.pdf PDF
6220213_53711_-_0001_ R_-_0001.pdf PDF
38K6112318A01-Engrg Inst.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI_38K6112318A01_c0v0.pdf PDF
TGI 38K6186301A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
TGI_38K6154103A02_c0v0.pdf PDF
TGI_38K6112301A01_c0v0.pdf PDF
TGI 38K6158301A01_c0v0.pdf PDF
TGI_38K6112317A01_c0v0.pdf PDF
TGI_38K6112304A01_c0v0.pdf PDF
TGI 38K6152101A02_c0v0.pdf PDF
TGI 38K6154101A01_c1v1.pdf PDF
TGI 38K6165401A01_c0v0.pdf PDF
TGI 38K6164401A01_c1v2.pdf PDF
TGI 38K6154101T02_c0v0.pdf PDF
Attachment IV DDG-115_BUNDLE1_GFP_List.xlsx XLSX spreadsheet
Attachment VIII Contract data.pdf PDF
Solicitation - N6264926RA036.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

24-JAN-2026 0948

20.15.6.0.9333 (July 2025) ICN: 38K6154101 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54112-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 54112

CU PHASE TITLE: FUEL TRANSFER SYS (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EB14L021 * CE03L017

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TERANISHI, SHIGERU 246.2 3152433424 28-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

SOPHABMIXAY, JOHN 246.2 3152432291 06-DEC-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CE03-L017 * EB14-L021

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

541A1201 1

Tightness & Operational Test for Fuel Transfer System - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

24-JAN-2026 0948

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6154101 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54112-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 54112

CU PHASE TITLE: FUEL TRANSFER SYS (T & OP) - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 54112-3-300KTR FUEL TRANSFER SYS (T &

OP) - KTR

LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the tightness & operational test in accordance with reference, TP 54112-3-300KTR.

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6154101 KEY OP: T01

File details come from the government source that posted it. Updated .