TGI 38K6186301A01_c0v0.pdf

PDF 2 MB Posted

Attached to
USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
Solicitation number
N6264926RA036
Issued by

About this file

This is a WebAIM Short Form Task Group Instruction (TGI) for contractor work on the USS RAFAEL PERALTA (DDG-115), a naval destroyer. The document, dated January 21, 2026, provides detailed specifications for temporary service infrastructure installation and maintenance on the vessel.

The primary scope of work involves fabricating, installing, maintaining, and removing temporary service ways and enclosures to support utility service operations across multiple deck levels of the ship. Work locations span four distinct areas: 04 Level Weather (Frames 145-150, Port and Starboard), 02 Level Weather (Frames 120-395, Port and Starboard), 01 Level Weather (Frames 15-350, Port and Starboard), and Main Deck Weather (Frames 425-435, Port and Starboard). The contractor must install one temporary service way and two types of temporary enclosures—one with an openable top and one standard enclosure—as identified in the attached Sketch Enclosure-01. Maintenance is required a total of two times when requested by the Project Team. The contractor work is scheduled to commence on July 18, 2026, and be completed by September 20, 2026. Work must comply with 29 CFR Part 1915.71 (Scaffolding or Staging standards) and include surface treatment per specification 009-032. SRF-JRMC will provide supporting services including crane operations, electrical utility service, utility service for air supply/water/steam, safety inspections, and quality assurance inspections. No government-furnished materials are required. The Project Team (Code 231B, Planner M. Hayashi) will direct specific installation details, modifications, and removal procedures as work progresses.

View the file

Other files

File Type Posted
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
TGI_38K6151101A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6112321A01_c0v0_REV1.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6112317A01_c0v0_REV1.pdf PDF
TGI_38K6112001A01_c0v0_REV1.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
TGI_38K6186301A01_c0v0_rev1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
Attachment IV Request for Information Form.pdf PDF
N6264926RA0360001 SF30.pdf PDF
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI_38K6112318A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
TGI 38K6171101A01_c0v0.pdf PDF
TGI_38K6112001A01_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) ICN: 38K6186301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86491

CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

EXSYL068

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

HAYASHI, MOTONORI 231B 3152436145 07-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 07-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSY-L068

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU VARIOUS U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

863A5101

1 SCOPE/PURPOSE:

1.1 Title: KTR Service Work for Temporary Utility Service; provide

1.2 Location of Work:

1.2.1 04 Level Weather, Frames between 145 and 150, Port and Starboard (Stbd)

1.2.2 02 Level Weather, Frames between 120 and 395, Port and Stbd

1.2.3 01 Level Weather, Frames between 15 and 350, Port and Stbd

1.2.4 Main Deck Weather, Frames between 425 and 435, Port and Stbd

1.3 Identification:

1.3.1 Quantity (One Lot), Temporary Service Way for Utility Service

TGI Short Form

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6186301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86491

CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

Remarks: See Sketch Enclosure-01 for location details.

1.3.2 Quantity (One Lot), Temporary Enclosure with Openable Top for Utility Service

Remarks: See Sketch Enclosure-01 for location details.

1.3.3 Quantity (One Lot), Temporary Enclosure for Utility Service

Remarks: See Sketch Enclosure-01 for location details.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor Work start date:

1.7 Contractor Work completion date:

2 PROCEDURE:

2.1 Install each temporary service way listed in 1.3.1 in accordance with Ref. No. 3, using Enclosure-01 for guidance.

2.2 Fabricate and install each temporary enclosure listed in 1.3.2 and 1.3.3 in accordance with Ref. No. 3, using Enclosure-01 for guidance.

2.3 Maintain each temporary service way and temporary enclosure listed in 1.3.1 through 1.3.3 for a total 2 times when requested by Project Team in accordance with Ref. No. 3.

2.4 Remove each temporary service way and temporary enclosure listed in 1.3.1 through 1.3.3 in accordance with Ref. No. 3 when requested by Project Team.

2.5 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.6 Notes:

2.6.1 Planner: Code 231B M. Hayashi, 243-6145

2.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.6.3 Exact installation, modification, and removal of area, detail, and date of temporary service way and temporary enclosure will be directed by the Project Team.

2.6.4 JCN EXSY-L068 is related to this TGI.

2.7 Government Furnished Material (GFM): None.

2.8 SRF-JRMC will provide the following service work: (TGI No. 38K6186301S02)

Kouichi.Yoshida.ja Typewritten Text 7/18/2026

Kouichi.Yoshida.ja Typewritten Text 9/20/2026

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6186301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86491

CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

2.8.1 [C740] Crane and crane rigger service.

2.8.2 [X99E] Utility service, electrical.

2.8.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.8.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.8.5 [C133] QA inspection for (G) symbol(s).

21-JAN-2026 1552

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6186301 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86491

CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 TM 29 CFR PART

1915.71 Scaffolding or Staging - N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K6186301A01-Sketch.pdf 06-NOV-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6186301 KEY OP: A01

38K6186301A01 SKETCH

ENCLOSURE-01

Sheet 1 of 4

Sheet 2 of 4

Sheet 3 of 4

Sheet 4 of 4

File details come from the government source that posted it. Updated .