TGI_38K6112318A01_c0v0.pdf

PDF 4 MB Posted

Attached to
USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
Solicitation number
N6264926RA036
Issued by

About this file

This is a WebAIM Short Form Task Group Instruction (TGI) document for USS RAFAEL PERALTA (DDG-115) dated 29 January 2026.

The document specifies work to install warning placards on blow-in door (BID) frames for forward and aft Gas Turbine Module (GTM) and Ship Service Gas Turbine Generator (SSGTG) intake moisture separators across eleven locations on the vessel. The work includes fabricating 19 danger placards (6 inches x 3 inches x 1/8 inch thick) from CRES 316L material per MIL-DTL-15024G Type B specifications with red engraved lettering reading "DANGER / NOT AN ACCESS / DO NOT ENTER," and installing moisture separator/BID frames at specified compartments including GTM 1A/1B/2A/2B intakes and SSGTG No. 1/2/3 intakes. The contractor work period runs from 27 July 2026 to 4 September 2026. SRF-JRMC will furnish materials and provide supporting services including crane and rigging, utility services (air, water, steam supply), safety and gas-free inspections for employees, and QA/inspection services. Work shall comply with NAVSEA S9074-AR-GIB-010A/278 standards for Class M-2 machinery component fabrication, welding, and inspection. The job summary ID is 123A2118, and the related Job Control Number is EM01-1215, with engineering coordination provided by Code 260 Y. Hasebe.

View the file

Other files

File Type Posted
TGI_38K6186301A01_c0v0_rev2.pdf PDF
TGI_38K6113801A01_c1v0_REV2.pdf PDF
TGI_38K6112306A01_c0v1_REV2.pdf PDF
TGI_38K6169901A01_c0v0_REV2.pdf PDF
TGI_38K6152101A02_c0v0_REV2.pdf PDF
TGI_38K6164401A01_c1v2_REV2.pdf PDF
TGI_38K6154103A02_c0v0_REV2.pdf PDF
TGI_38K6145601A01_c0v0_REV2.pdf PDF
TGI_38K6113602A01_c0v0_REV2.pdf PDF
Attachment I Bundle_1_POP_LIST.xlsx XLSX spreadsheet
TGI_38K6113702A01_c0v0_REV1.pdf PDF
TGI_38K6112303A01_c0v0_REV1.pdf PDF
TGI_38K6113601A01_c0v0_REV1.pdf PDF
TGI_38K6113602A01_c0v0_REV1.pdf PDF
TGI_38K6112325A01_c0v0_REV1.pdf PDF
TGI_38K6154103A02_c0v0_REV1.pdf PDF
TGI_38K6144104A01_c0v0_REV1.pdf PDF
TGI_38K6151101A01_c0v0_REV1.pdf PDF
material info.pdf PDF
6220213_53711_-_0001_ R_-_0001.pdf PDF
38K6112318A01-Engrg Inst.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
TGI_38K6154103A02_c0v0.pdf PDF
TGI_38K6112301A01_c0v0.pdf PDF
TGI 38K6158301A01_c0v0.pdf PDF
TGI_38K6112317A01_c0v0.pdf PDF
TGI_38K6112304A01_c0v0.pdf PDF
TGI 38K6152101A02_c0v0.pdf PDF
TGI 38K6154101A01_c1v1.pdf PDF
TGI 38K6165401A01_c0v0.pdf PDF
TGI 38K6164401A01_c1v2.pdf PDF
TGI 38K6154101T02_c0v0.pdf PDF
Attachment IV DDG-115_BUNDLE1_GFP_List.xlsx XLSX spreadsheet
Attachment VIII Contract data.pdf PDF
Solicitation - N6264926RA036.pdf PDF
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI 38K6186301A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

29-JAN-2026 0907

20.14.15.2.9333 (September 2024) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EM011215

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

EGUCHI, MASASHI 234 3152430978 23-JAN-2026

APPROVED BY: CODE: PHONE: DATE:

AKASE, KOUICHI 234 3152432372 23-JAN-2026

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM01-1215

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A2118

1. SCOPE/PURPOSE:

1.1 Title: Placard to FWD and AFT Gas Turbine Module (GTM) and Ship Service Gas Turbine Generator (SSGTG) Intake Moisture Separator/Blow in Door (BID) Flame; install

1.2 Location of Work:

1.2.1 Intake Engine Room No. One (Starboard) (02-174-1-Q)

1.2.2 Intake Engine Room No. One (Port) (02-174-0-Q)

1.2.3 Intake Engine Room No.2 (02-284-0-Q)

1.2.4 Intake TRK (A) ENG Room No. 2 (1-289-2-Q) (01 Level)

1.2.5 Intake Engine Room No. 2 (01-276-0-Q)

TGI Short Form

29-JAN-2026 0907

20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.2.6 Intake Engine Room No. 2 (02-275-0-Q)

1.2.7 Intake Engine Room No. 2 (03-274-0-Q)

1.2.8 SS GTRB Intake/Exhaust Trunk (02-161-2-Q)

1.2.9 SS GTRB GEN Intake (03-174-0-Q)

1.2.10 SS GTRB GEN Intake (01-260-1-Q)

1.2.11 SS GTRB GEN Intake TRK (01-388-2-Q)

1.3 Identification:

1.3.1 Quantity (19 EA), Placard

Material: Cres 316L Size: 6 Inch X 3 Inch THK: 1/8 Inch Spec: MIL-DTL-15024G, Type: B, Engrave Letter: Size: 1/2 Inch Letter Color: Red Inscription: 1st Line: DANGER 2nd Line: NOT AN ACCESS 3rd Line: DO NOT ENTER Remarks: See Enclosure-01 for details.

1.3.2 Quantity (4 EA), Moisture Separator/BID, 1A GTM Intake, Located in 1.2.1 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.3 Quantity (4 EA), Moisture Separator/BID, 1B GTM Intake, Located in 1.2.2 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.4 Quantity (4 EA), Moisture Separator/BID, 2A GTM Intake, Located in 1.2.3 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.5 Quantity (4 EA), Moisture Separator/BID, 2B GTM Intake, Located in 1.2.6 and 1.2.7 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.6 Quantity (One EA), Moisture Separator/BID, No. One SSGTG Intake, Located in 1.2.8 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.7 Quantity (One EA), Moisture Separator/BID, No. 2 SSGTG Intake, Located in 1.2.10 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

29-JAN-2026 0907

20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

1.3.8 Quantity (One EA), Moisture Separator/BID, No. 3 SSGTG Intake, Located in 1.2.11 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work complication date:

2. PROCEDURE:

2.1 Accomplish the requirements of 2.3.

(V)(G) ”GAS TURBINE MAINTENANCE PROCEDURE"

2.2 Fabricate and Install each new placard listed in 1.3.1 to intake BID moisture separator listed in 1.3.2 through 1.3.8 in accordance Enclosure-01.

2.2.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s)F, Lines One through 10.

2.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surfaces.

2.4 Notes:

2.4.1 Planner: Code 234 M. Eguchi, 243-0978

Planner: Code 232 Y. Watanabe, 243-2375 Engineer: Code 260 Y. Hasebe, 243-4347

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 JCN EM01-1215 is related to this TGI.

2.5 SRF-JRMC Furnished Material (GFM):

2.5.1 SRF-JRMC will provide GFM listed in Appendix “M”.

2.6 SRF-JRMC will provide the following service work: (TGI No. 38K6112318S02)

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service.

2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

Kouichi.Yoshida.ja Typewritten Text 7/27/2026

Kouichi.Yoshida.ja Typewritten Text 9/4/2026

29-JAN-2026 0907

20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 4 of 5

CU PHASE DESCRIPTION (Cont.)

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA Inspection for (G) symbol (s).

2.6.7 [C285] Inspection for (G) symbol(s).

29-JAN-2026 0907

20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 5 of 5

OTHER SPECIAL REQUIREMENTS:

CLASS M-2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI NSI FY-26 NAVSEA Standard Items - 1 N 2 LI LI FY-26 Local Standard Items - ORG N

3 MP LM24-K6112318-

EM011215

1A/1B/2A/2B GTM,

NO.1/NO.2/NO.3 SSGTG

INTAKE FOD PROTECTION

FOR INSTALL PLACARD

- Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

001 M SHEET, METAL, SHEET,

METAL 2 FT X 2 FT X 1/8 THK,

MTERIAL: CRES 316L, ASTM

A240 FINISH 2B

ORDER FOR KTR

ORIG: 234 M. EGUCHI, 243-

9B 9515 LL9004718 NA 4 N 2/SH

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K6112318A01-Engrg Inst.pdf 23-JAN-2026 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6112318 KEY OP: A01

NOTES:

1. Fabricate and install the warning placards on the blow-in door in accordance with this enclosure.

2. Fabrication, welding and inspection of class M-2 machinery components, category C shall be in accordance with NAVSEA S9074-AR-GIB-010A/278.

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 1 OF 12

Co w 0 zo 0

0< -J _J

O<L10 F-OaJ

-J.

LIZ 0

ou_ 0-J 0

ELM NO. 259-250320 REV. -

ENCLOSURE (2)

CUI

38K6112318A01 ENGRNG INST

SHEET 2 OF 12

D A

N G

ER

N

O T

A N

A C

C

ES

S D

O N

O T

EN

TE

R

C U

I

C U

I

ELM NO. 259-250320 REV. -

ENCLOSURE (2)

CUI

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 3 OF 12

Yuuki.Hasebe.ja Line

Yuuki.Hasebe.ja_1 Line

Yuuki.Hasebe.ja_2 Line

Yuuki.Hasebe.ja_3 Line

Yuuki.Hasebe.ja_4 Text Box

TAC WELDS

(4 PLS, TYP)

D

N G

ER

N

O T

N

C C

ES

S

D O

N O

T

EN

TE

R

C U

I

C U

I

Pl ac ar d sh al l h av e th e fo llo w in g:

Si ze

: 6 x in ch x

/8

T H

K

M at er ia l:

C or ro si on

R es is ta nc e

(C

RE

S

6L

In st al la tio n M et ho d:

S ha ll be ta ck w el de d si m ila r t o O

EM

p la ca rd

SHEET 3 of 13

M O

IS

TU

R E

SE

PA

R

AT

O R

T

YP

E A

38K6112318A01 ENGRNG INST

SHEET 4 OF 12

U

I

C U

I

Pl ac ar d sh al l h av e th e fo llo w in g:

Si ze

: 6 x in ch x

/8

T H

K

M at er ia l:

C or ro si on

R es is ta nc e

(C

RE

S

6L

In st al la tio n M et ho d:

S ha ll be ta ck w el de d si m ila r t o

O

EM

p la ca rd

D A

N G

ER

N

O T

N

C

ES

S

D O

N O

T

EN

TE

R

M O

IS

TU

R E

SE

PA

R

AT

O R

T

YP

E B

38K6112318A01 ENGRNG INST

SHEET 5 OF 12

G

TM

A

In ta ke

Fo ur

(4 ) p la ce s

C U

I

C U

I

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 6 OF 12

Yuuki.Hasebe.ja_5 Line

TM

B

In ta ke

Fo ur

(4 ) p la ce s C

U I

C U

I

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 7 OF 12

Yuuki.Hasebe.ja_6 Line

Th re e (3

) p la ce s:

(2 )G

TM

A (1

)G

TM

B

Th re e (3

) p la ce s:

(2 ) G

TM

A (1

) G

TM

B

G

TM

A/

2B In ta ke

C U

I

C U

I

38K6112318A01 ENGRNG INST

SHEET 8 OF 12

Tw o

(2 ) p la ce s

G

TM

B

In ta ke

C U

I

C U

I

38K6112318A01 ENGRNG INST

SHEET 9 OF 12

O ne

(1 ) p la ce

G

TG

In ta ke

C U

I

C U

I

38K6112318A01 ENGRNG INST

SHEET 10 OF 12

TG

In ta ke

C U

I

C U

I

O ne

(1 ) P la ce

38K6112318A01 ENGRNG INST

SHEET 11 OF 12

TG

In ta ke

Fo r D

D G

9A

F

C U

I

C U

I

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 12 OF 12

Yuuki.Hasebe.ja_7 Text Box

MOISTURE

SEPARATOR TYPE A

File details come from the government source that posted it. Updated .