TGI_38K6113801A01_c1v0.pdf
PDF 1 MB Posted
- Attached to
- USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
- Solicitation number
- N6264926RA036
About this file
This is a Task Group Instruction (TGI) for naval ship maintenance work on USS RAFAEL PERALTA (DDG-115). The document provides detailed work specifications for accomplishing inspection, repair, preservation, and replacement of the peel and stick nonskid system on the 03 Level Weather deck.
The work scope encompasses approximately 1,050 square feet of deck plating located between frames 163 and 193 on both port and starboard sides. Key tasks include removal and reinstallation of two ammunition stowage boxes, two liferail stanchion assemblies, one J-bar davit socket foundation, and six existing drain trough cover plates. The contractor must perform visual inspection of deck plating for structural integrity and deterioration, accomplish power tool cleaning to bare metal per SSPC-SP 11 specifications, and conduct base metal buildup repairs totaling 50 square inches with maximum 2-inch diameter per area and estimated 0.25-inch thickness. Additional work includes removal and installation of 30 mounting brackets for drain trough covers, installation of new peel and stick nonskid deck covering per MIL-PRF-24667 Type XI, application of safety markings, and installation of six new composite drain trough cover plates with epoxy resin adhesive. The contractor work start date is 7/27/2026 with completion by 9/4/2026. Government-furnished material will be provided by SRF-JRMC per Appendix M, and SRF-JRMC will provide support services including crane and rigging, utilities, and quality assurance inspection under TGI No. 38K6113801S02. Paragraph 5.12.6 specifies that WPC will copy designated reference pages from manuals 2.3 and 2.4.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 03 LVL SPY ARRAY DK AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE:
F/O - ACOMP INSP, RPR, PSV, & REPLT OF PEEL & STICK NONSKID SYS IN 03LVL WEATHER
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
NAOKI KUROKAWA 231B. 315-243-0108 17-NOV-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 17-NOV-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Paragraph 5.12.6 needs to be revised.
CHANGE INSTRUCTIONS:
CH1: Revise paragraph 5.12.6 (01/22/2026)
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 03 LVL SPY ARRAY DK AY A 0
FOUO
SHIP: DDG-115 CHG/VER: 1/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-6 J1-2 M1-2 Sketch (1-4)
1. SCOPE/PURPOSE
1.1 Title: Replacement of Peel and Stick Nonskid System and Inspection, Repair, and Preservation of 03 Level Weather, Deck Plating; accomplish
1.2 Location of Work:
1.2.1 03 Level Weather, Frames between 163 and 193, Port and Starboard (Stbd)
1.3 Identification:
1.3.1 Quantity (2 EA), Ammunition Stowage Box, 03 Level Weather, Frames between 169 and 174 Remarks: See Sketch Enclosure-01 for location details
1.3.1.1 Quantity (One EA), Ammunition Lifting Stowage Box, Port
1.3.1.2 Quantity (One EA), Ammunition Platform Stowage Box, Stbd
1.3.2 Quantity (2 AY), Liferail Stanchion Assembly, 03 Level Weather, Frames 163 and 193, Port and Stbd Material: CRES Remarks: See Sketch Enclosure-01 for location details
1.3.2.1 Quantity (One EA), Liferail Stanchion, 03 Level Weather, Frames 192 and 193, Port
1.3.3 Quantity (One EA), J-Bar Davit Socket Foundation, 03 Level Weather, Frames 190 and 192, Port Material: Steel Remarks: See Sketch Enclosure-01 for location details
1.3.4 Quantity (6 EA), Drain Trough Cover Plate, 03 Level Weather, Frames between 169 and 174, Port and Stbd [Existing] Material: CRES Remarks: See Sketch Enclosure-01 for location details
1.3.5 Quantity (1,050 SF), Deck Plating, 03 Level Weather, Frames between 163 and 193, Port and Stbd, including drain trough and vertical surface up to height of 4 inches from deck in and around peel and stick nonskid deck covering area Remarks: See Sketch Enclosure-01 for location details
1.3.6 Quantity (One SF), Deck Penetration, Firemain Piping in 03 Level Weather, Frames between 172 and 173, Stbd Remarks: The area where rubber tile is installed
1.3.7 Quantity (2 SF in Total), Protective Side Plate of Hydrostatic Release Clip Assembly, 03 Level Weather, Frames between 167 and 173, Port Remarks: The area where rubber tile is installed
FOUO
SHIP: DDG-115 CHG/VER: 1/0
1.3.8 Quantity (6 EA), Composite Drain Trough Cover Plate, 03 Level Weather, Frames between 169 and 174, Port and Stbd Material: Glass Reinforced Plastics Remarks: See Sketch Enclosure-01 for location details
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor Work start date:
1.7 Contractor Work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 DWG 600-
7026491
INSTL OF HULL OUTFIT, DESIGN
ZONE 4330 03 LVLFR 174-199
(WEATHER)
H Y SE
E N
OT
E
4 DWG 612-
6567058
DDG51 CLASS LIFELINES RAILS
STANCHIONS, AND FAB INSTL
OF EXTERIOR
AD Y SE
E N
OT
E
5 DWG 529-
8892049
DRAIN TROUGH COVER, GRP,
INSTALLATION AND DETAILS
- Y AL
L
6 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
7 DWG 150-
7026717
UNIT STRL ARR DWG ASSY UNIT
P Y 3-6
8 DWG 150-
7026723
UNIT STRL ARR ASSY UNIT 4320 J Y 3-
9 DWG 711-
8724214
MK 38 MOD 3 STABILIZED CHAIN
GUN ARR & STRL FDN MODS &
ML
A Y 5,6 ,19
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove and reinstall each stowage box listed in 1.3.1 for preservation work, using 2.3 for guidance.
Kouichi.Yoshida.ja Typewritten Text 7/27/2026
Kouichi.Yoshida.ja Typewritten Text 9/4/2026
Kouichi.Yoshida.ja Cross-Out
Kouichi.Yoshida.ja Typewritten Text
1/26/2026 C1209.2 K. YOSHIDA
FOUO
SHIP: DDG-115 CHG/VER: 1/0
5.2 Remove each existing liferail stanchion and J-bar davit socket foundation listed in 1.3.2.1 and 1.3.3, using 2.3 and 2.4 for guidance.
5.3 Remove each existing drain trough cover plate listed in 1.3.4, using 2.3 and 2.5 for guidance.
5.4 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 23, for each area listed in 1.3.5.
5.4.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.6.
5.4.2 Upon completion of surface preparation of each area, accomplish a visual inspection of each deck plating for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, using 2.7 and 2.8 for guidance.
5.4.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.4.2 to the SUPERVISOR.
5.4.3 Accomplish the requirements of 009-026 of 2.1, including Attachment G, for installation of new peel and stick nonskid deck covering. Application of peel and stick nonskid deck covering must conform to MIL-PRF-24667, Type XI, Composition PS.
5.4.4 Apply each new safety marking in accordance with 2.9.
5.5 Accomplish the following repairs of each deck plating listed in 1.3.5 reported in 5.4.2.1 as designated by the SUPERVISOR, using 2.3, 2.5, 2.7, and 2.8 and for guidance. See 5.12.3 and 5.12.4.
5.5.1 Base metal buildup, a total of 50 square inches.
5.5.1.1 Ensure each base metal buildup area does not exceed 2 inches in diameter.
5.5.1.2 Estimate the base metal buildup to be one quarter inch thick for pricing purposes.
5.5.1.3 Fill each local pit and groove with metal prior to the application of each principal build-up layer.
5.5.1.4 Each surface must be ground smooth to metal.
5.5.2 Remove existing and install new, a total of 30 each of mounting bracket for drain trough cover plate(s).
5.5.3 Chip and grind each surface flush in way of each repair.
5.5.4 Template exact size, configuration, and location from each existing shipboard condition.
5.5.5 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A and D, Lines One through 7.
5.5.6 Accomplish the requirements of 009-025 of 2.1 for an air hose test of each new weld seam. Allowable leakage:
None.
5.6 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) One, for each liferail stanchion assembly and J-bar davit socket foundation listed in 1.3.2 and 1.3.3.
5.7 Reinstall each liferail stanchion and J-bar davit socket foundation listed in 1.3.2.1 and 1.3.3, using 2.3 and 2.4 for guidance.
5.8 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 46, for each area listed in 1.3.6 and 1.3.7.
FOUO
SHIP: DDG-115 CHG/VER: 1/0
5.9. Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 83, for each composite drain trough cover plate listed in 1.3.8.
5.9.1 Stencil on each new composite drain trough cover plate in accordance with General Note 7 of 2.5. The stencil must be 5/8 inch and “BLACK”.
5.10 Install each new composite drain trough cover plate listed in 1.3.8 in accordance with 2.5.
5.10.1 Drill 9/32 inch diameter mounting hole(s) on each new composite drain trough cover plate.
5.10.1.1 Template detail from onboard ship for drill mounting hole(s).
5.10.1.2 Shape remaining holes to 82 degrees countersink.
5.10.1.3 Apply epoxy resin adhesive to drilled mounting hole(s).
5.11 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.12 Notes:
5.12.1 Planner: Code 231B N. Kurokawa, 243-0108
5.12.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
5.12.3 Removal and installation of rubber tile on deck penetration and protective side plate will be covered by TGI No(s). 38K6113801U01 and 38K6113801R01 (SRF-JRMC TGI).
5.12.4 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.12.5 Materials for mounting bracket relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.12.6 WPC will copy the following pages in reference.
REF. 2.3: Pages 3B14, 4A, 4B, and 3A21.
REF. 2.4: Pages 5F1, 6C1, and 3M1-34.
5.12.7 JCN CF01-0418 is related to this TGI.
5.13 Government Furnished Material (GFM):
5.13.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.14 SRF-JRMC will provide the following service work: (TGI No. 38K6113801S02).
5.14.1 [C740] Crane and crane rigging service.
5.14.2 [X99E] Utility service, electrical.
5.14.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
5.14.4 [C106.1] Safety inspection for SRF-JRMC employees.
FOUO
SHIP: DDG-115 CHG/VER: 1/0
5.14.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.14.6 [C133] QA inspection for (G) symbol(s).
5.14.7 [C250] Technical support for front load repair work.
FOUO
M-1
SHIP: DDG-115 CHG/VER: 1/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
03 LVL SPY ARRAY DK AY A 0 0
CU PHASE TITLE:
F/O - ACOMP INSP, RPR, PSV, & REPLT OF PEEL & STICK NONSKID SYS IN 03LVL WEATHER
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K6113801 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M COVER,FAUCET HOLE,
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 4510 016765240 NA 4 N 53175733 1/SE
002 M SCREW,MACHINE,
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 5305 014243572 NA 4 N 53175730 80/EA
003 M ADHESIVE, ORIGINATOR:
C231B N. KUROKAWA 243-0108
ORDER FOR KTR
9B 8040 002646816 NA 4 Y 53175725 2/KT
004 M CHEMICAL, ORIGINATOR:
C231B N. KUROKAWA 243-0108
ORDER FOR KTR
9B 6850 014504009 NA 4 Y 53175720 2/OZ
005 M SCREW,HEX,SELF-LOCK,,
SCREW,HEX,SELF-LOCK
SIZE: 1/2-13UNC-2A X 1”L
MATERIAL: CRES 316
ANNEALED
MIL-F-18240 TYPE P, MUL-DTL-
1222 TY I
BIW CAT#53847-153
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
NA 4 N 36/EA
NOTES:
FOUO
M-2
SHIP: DDG-115 CHG/VER: 1/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
006 M SCREW,CAP,SOCKET HE,
ORIGINATOR: C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 5305 017241255 NA 4 N 53285102 8/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 03 LVL SPY ARRAY DK AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K6113801 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 03 LVL SPY ARRAY DK AY A 0
Sheet 1 of 438K6113801A01
SKETCH
ENCLOSURE-01
PLAN VIEW
03 LVL WEA, FR 163 - 193, PORT
Listed 1.3.1
Listed 1.3.3
Listed 1.3.5
LOCATION DETAIL OF PRESERVE AND REPLACE PEEL & STICK
Listed 1.3.4 & 1.3.8
Naoki.Kurokawa.ja Polygon
Naoki.Kurokawa.ja_1 Polygon
Naoki.Kurokawa.ja_2 Polygon
Naoki.Kurokawa.ja_3 Polygon
Naoki.Kurokawa.ja_4 Polygon
Naoki.Kurokawa.ja_5 Polygon
LOCATION DETAIL OF PRESERVE AND REPLACE PEEL & STICK
Listed 1.3.1 Listed 1.3.5
Sheet 2 of 438K6113801A01
SKETCH
ENCLOSURE-01
PLAN VIEW
03 LVL WEA, FR 163 - 193, STBD
Listed 1.3.4 & 1.3.8
Naoki.Kurokawa.ja_6 Polygon
Naoki.Kurokawa.ja_7 Polygon
Naoki.Kurokawa.ja_8 Polygon
Naoki.Kurokawa.ja_9 Polygon
Naoki.Kurokawa.ja_10
Listed 1.3.2
Sheet 3 of 438K6113801A01
SKETCH
ENCLOSURE-01
PLAN VIEW
03 LVL WEA, FR 163 - 193, PORT
Listed 1.3.2.1
LOCATION DETAIL OF PRESERVATION AREA
Naoki.Kurokawa.ja_11 Polygon
Naoki.Kurokawa.ja_12
LOCATION DETAIL OF PRESERVATION AREA
Listed 1.3.2
Sheet 4 of 438K6113801A01
SKETCH
ENCLOSURE-01
PLAN VIEW
03 LVL WEA, FR 163 - 193, STBD
Naoki.Kurokawa.ja_13