This is a WebAIM Short Form Task Group Instruction (TGI) document for ship maintenance work on the USS RAFAEL PERALTA (DDG-115). The document provides instructions for the installation and removal of scaffolding at two locations: the Freeboard Weather area (Frames 308-338, Port side) and the Torpedo Missile and Rocket Magazine (1-304-2-M) on the Main Deck (Frames 308-338). The work is being performed in support of the Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC), which will conduct maintenance and preservation work on blowout hatches.
The contractor work period extends from July 22, 2026, to September 11, 2026. The primary tasks are to erect and hang scaffolding assemblies (two separate lots) in accordance with 29 CFR Part 1915.71 (Scaffolding or Staging standards) and to remove the scaffolding upon completion when requested by SRF-JRMC via Code 333. No Government Furnished Material is required. SRF-JRMC will provide supporting services including crane and crane rigging services, safety inspections for SRF-JRMC employees, and Quality Assurance inspections for marked items. The document was prepared by T. Ando (Code 231B) on November 17, 2025, and approved by T. Takeishi on the same date. The Work Integration Manager is T. Yaginuma (Code 333).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
29-JAN-2026 0905
20.14.15.2.9333 (September 2024) ICN: 38K6112001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 86511
CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM FREEBD WEA & 1-304-2-M FOR SRF-JRMC WORK
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
CG030737
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ANDO, TOMOHIKO 231B 3152434372 17-NOV-2025
APPROVED BY: CODE: PHONE: DATE:
TAKEISHI, TAKAYUKI 231B 3152436704 17-NOV-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CG03-0737
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
120A0001
1. SCOPE/PURPOSE:
1.1 Title: Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove
1.2 Location of Work:
1.2.1 Freeboard Weather, Frames between 308 and 338, Port
1.2.2 Torpedo Missile and Rocket Magazine (1-304-2-M)
1.3 Identification:
1.3.1 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.1 Remarks: Maintenance / Preservation work of blowout hatch will be accomplished by SRF-JRMC.
TGI Short Form
29-JAN-2026 0905
20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 86511
CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM FREEBD WEA & 1-304-2-M FOR SRF-JRMC WORK
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.3.2 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.2, Main Deck Frames between 308 and 338 Remarks: Maintenance / Preservation work of blowout hatch will be accomplished by SRF-JRMC.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. PROCEDURE:
2.1 Erect/hang scaffolding listed in 1.3.1 and 1.3.2 in accordance with Ref. No. 3.
2.2 Remove scaffolding listed in 1.3.1 and 1.3.2 upon completion of the work in accordance with Ref. Ref. No. 3 when requested by SRF-JRMC via Code 333.
2.3 Notes:
2.3.1 Planner: Code 231B T. Ando, 243-4372
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
2.3.3 JCN CG03-0737 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6112001S02)
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.3 [C133] QA inspection for (G) symbol(s).
Kouichi.Yoshida.ja Typewritten Text 7/22/2026
Kouichi.Yoshida.ja Typewritten Text 9/11/2026
29-JAN-2026 0905
20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112001 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 86511
CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM FREEBD WEA & 1-304-2-M FOR SRF-JRMC WORK
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6112001 KEY OP: A01