Q&A_Attachment_III_Ellsworth_AFB_Appendix_AF_01_May_18.pdf
PDF 351 KB Posted
- Solicitation number
- SPE603-18-R-0507
- Issued by
-
Defense Logistics Agency Energy
About this file
ELLSWORTH AFB APPENDIX AF
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ellsworth AFB
APPENDIX AF
AIR FORCE INSTALLATION INFORMATION
I. INSTALLATION LISTING
1. Contracted Fuels Management Operations Services
Buckley AFB, CO Kirtland AFB, NM Schriever AFB, CO
Cape Canaveral AFS, FL JB McGuire-Lakehurst, NJ (Lakehurst)
Sheppard AFB, TX
Cheyenne Mtn, CO Laughlin AFB, TX Tinker AFB, OK
Columbus AFB, MS Malmstrom AFB, MT Wright Patterson AFB, OH
Edwards AFB, CA Maxwell AFB, AL Vance AFB, OK
F.E. Warren AFB, WY Patrick AFB, FL Vandenburg AFB, CA
Gila Bend AAF, AZ Peterson AFB, CO
Keesler AFB, MS Randolph AFB, TX
2. Contracted Bulk Storage:
a. CONUS
Altus AFB OK Hill AFB, UT* Nellis AFB, NV
Barksdale AFB, LA Holloman AFB, NM Offutt AFB, NE*
Beale AFB, CA Hurlburt Field, FL Pope AAF, NC
Cannon AFB, NM JB McGuire-
Lakehurst, NJ
(McGuire)
Robins AFB, GA*
Charleston AFB, SC Langley AFB, VA Scott AFB, IL
Davis Monthan AFB, AZ Little Rock AFB, AR Seymour Johnson AFB, NC
Dover AFB, DE Luke AFB, AZ Shaw AFB, SC
Dyess AFB, TX JB Lewis-McChord, WA (McChord AFB)
Travis AFB, CA
Eglin AFB, FL* McConnell AFB, KS Tyndall AFB, FL
Ellsworth AFB, SD Minot AFB, ND Whiteman AFB, MO
Fairchild AFB, WA Moody AFB, GA
b. OCONUS
Anderson AFB, GU+ Aviano AB, IT*
Eielson AFB, AK Incirlik, AB, TU *
Elmendorf AFB, AK Lajes Field Azores *
Kadena AB, JA RAF Lakenheath, UK *
Misawa AB, JA RAF Mildenhall, UK *
Osan AB, RK Ramstein AB, GE *
Spangdahlem AB, GE *
^ Note: FSC, Product Issues, Accounting/Auditability, Quality Surveillance/Lab, Cryogenics, and Retail Service Station at these locations are the Contractor’s responsibility.
* Note: PM at these locations is the government’s responsibility IAW C-5.3.2
+ Note: PLDS at these locations is the Contractor’s responsibility IAW C-5.6.2
APPENDIX AF (cont’)
II. INSTALLATION SPECIFIC INFORMATION
A. BASE
(1) INTRODUCTION
Ellsworth AFB, South Dakota is home to 2 squadrons of B-1B Bombers. Our local mission is to ensure aircraft and aircrew are trained and ready for worldwide taskings. Ellsworth AFB is also home to a MQ-9 pilot center which is operational at all times. Weather in the area can be unpredictable with high winds, storms, and blizzards.
(2) HOURS OF OPERATION
Normal hours for fuels operations are identified below. Contractor must be capable of providing 24 hours x 7 days per week PWS coverage when required including for weather, natural disaster, exercise, or other contingency operations.
Operation Mon-Fri Sat-Sun Holidays/After Hrs
Fuels Management
Accounting
Lab
Operations (FSC)
Operations (Distribution)
Operations (Bulk Storage) 0700-2400 0800-2000 Standby
Operations (Cryogenics)
Recognized holidays:
New Year’s Day: 1 January
Martin Luther King’s Birthday: 3rd Monday in January
President’s Day: 3rd Monday in February
Memorial Day: Last Monday in May
Independence Day: 4 July
Labor Day: 1st Monday in September
Columbus Day: 2nd Monday in October
Veterans Day: 11 November
Thanksgiving Day: 4th Thursday in November
Christmas Day: 25 December
NOTE (1): If the holiday falls on Saturday—the previous Friday shall be observed as the holiday. If the holiday falls on Sunday—the next Monday shall be observed as the holiday.
NOTE (2): Fuels Operations shall operate during normal or required extended hours of operation and on observed holidays unless authorized to close by the Wing Commander or designee. If closed, standby personnel shall be identified to MOC and Security Forces and be available to respond within 1 hr.
(3) WORKLOAD INFORMATION
Base workload/requirements are provided below. Quantities and durations are estimates only and subject to variation. Variation does not directly correspond to additional requirement or staffing without validation and/or increase in normal hours of operation by the Contracting Officer.
Item
Average number of receipts per month, grade, quantity, normal shifts of receipts and mode of delivery
4.5, Jet-A, 250,000 gals, 0700-1500 M-F, PL (TT annual test of alternate capability)
1, GUR, 7,500 gals, 0700-1500, TT
1, DF2, 7,500 gals, 0700-1500, TT
Average duration of each receipt mode PL - 8 hrs.; TT – 1 hr.
Number of trucks/railcars which can be offloaded simultaneously.
Number of trucks/railcars which can be on-loaded simultaneously (only use for bulk deliveries i.e. DFSP TO DFSP).
Can receipt/fill/transfer operations occur simultaneously?
Receipt and Fill, but not transfer
Do tank truck receipts require
Contractor escort?
Yes (escorting/offloading approx. 1 hr. per TT)
Do barge receipts require Contractor booming? If not, who booms?
N/A
Base average annual jet fuel gallons issued 13.4M
Average transfers to hydrants
(WEEKLY)
Quantity Avg.: 250,000
Number of transfers: 1-2 (approx. 3 hrs. duration)
Normal days and times for transfers: M-F 0700-
Average number of refuels per shift
(DAILY)
N/A
Average number of fillstands per shift
(DAILY)
Bulk: A-.75 B-.25 C-.04
Hydrants: N/A
Number of refuelers which can be filled simultaneously.
Bulk:2
Hydrants: N/A
Number of hydrant outlets which can be operated simultaneously.
N/A
Number of hydrant outlets normally operated simultaneously per shift.
N/A
Number of refueling vehicles (R-11) normally operated simultaneously per shift.
N/A
Number of base organizational tanks supported.
N/A
Average Monthly organizational tank issues (servicing’s and quantity).
N/A
Average Monthly C-300 Fillstands 6
Describe current base provided grounds maintenance or describe Contractor’s responsibility (Grass and Snow)
Removes snow from walking surfaces and weeds
50 feet from buildings. Snow fall accumulation varies.
Describe current base provided entomology/pest control services or describe Contactor’s responsibility
Base Provided
Number of oil/water separators within
Contractors Area of Responsibility
Number of emergency generators for
POL facilities within Contractors AOR
(Gov’t provides fuel and conducts testing and maintenance)
1 (Contractor visually inspects daily)
Average Annual Cryogenic Receipts
Per Year (quantity and receipts) N/A
Average Monthly Cryogenic
Servicing’s Per Month (quantity and servicing’s)
N/A
Pre-Identified Confined Spaces* 7 (4 permit required; 3 non permit)
How many times in the last year has the Contractor been called in outside of normal duty hours
13 (11 for C300 fills, 2 for bowser RTB; approx.
1-3 hrs. duration depending if snow removal required prior to operation)
Level of DLA Energy/USACE RM
Provided (Quarterly, Semi-Annually, Annually)
Quarterly, Semi-Annually, Annually
NOTES: * Confined Spaces shall be validated by Contractor through CE.
(4) BASE SPECIFIC REQUIREMENTS
- Our MQ-9 pilot squadron requires us to be available to refuel their generator at any time. This requirement includes after hours and during snow storms. This may further require refilling the C-301 at any time.
- Anticipated in FY20, there are plans to remove one tank area, and build new tanks at the existing tank area requiring numerous escorts in and around the Contractors AOR.
- The Contractors AOR is the only place fuel bowsers can be drained. The bowser draining schedule from
Maintenance is unpredictable and can happen after hours. Standby personnel may be required to work.
- Product recovery takes approximately 20 minutes per tank. During Spring/Fall months, temperature fluctuation is extreme and water draw off systems need to be operated twice daily for approximately 3 hours total task duration daily
- Monthly hydrant flush takes approximately 4 hours; low point draining takes approximately 2 hours
- Tank to tank transfers between area C and area D occur usually once per week for approximately 8 hours
- Escorting personnel in the bulk storage areas for system and grounds maintenance, environmental testing, etc.:
previous 12 months totaled 2,230 hours with 1,181 personnel entries logged; simultaneous escorting in multiple areas occur approximately 10-20 percent
- Pipeline receipts: one occasion required operator to remain until 0200 due to smart pig operation delay
-Supplemental to PWS para C-5.3, Contractor is responsible for monitoring levels of any oil/water separators or water accumulation pits, ensuring pits are free of debris, and coordinating with Base Civil Engineering for water release or disposal
- Supplemental to PWS para C-5.3 and C-5.8.2.1, Contractor is responsible for properly collecting waste water drawn from product recovery or other sources and coordinating with Base Civil Engineering for disposal
– Supplemental to PWS para C-5.8.2.1, Contractor is responsible for safe handling of hazardous waste generated from routine operations and maintenance and coordinating with via Base Civil Engineering for disposal
(5) FACILITIES
The following on-site installation facilities may be used by the Contractor in performance of the PWS tasks. The facilities may be changed, by the local installation, from time to time to meet mission requirements. The Contractor will be notified prior to any change of location.
Facility
Number
Bldg
Number Name/Area Installed Equipment/Description
1704 Pumphouse 13A 2-600 gpm deep well turbine pumps
1705 Pumphouse 13B 2-600 gpm deep well turbine pumps
1707 Control Room Area C Control Panels
12812 Area C Separator Pad 2 600 GPM Filter Separators
8211 Hose Storage Building Morton Building
8215 Area D Jet Pumphouse
2 500 GPM vertical pumps
2- 300 GPM offloading pumps
2- 600 GPM filter separators
1- 50 gallon air eliminator tank
1- generator
1- control room w/pump switches
Area D Ground Fuel
Pumphouse 2-300 GPM receipt/issue pumps
8213 Offloading Headers
10 headers w/ valves. 3 positions normally used during tank truck receipts. R-11 RTB header
8214 Jet Fuel Fillstands 2- Pantographs with meters/valve
(6) PETROLEUM STORAGE TANKS
Facility
Number
Tank
Number
Function
(Bulk/Hydrant/MSS)
Safe Fill
(gallons)
Product
Grade
Type
UST/AST
Primary Receipt
Mode
Alternate Receipt
Mode
1704 13A Bulk 760,434 Jet A UST Pipeline
8212 16 Bulk/Hydrant 2,142,107 Jet A AST Pipeline Tank Truck
8216 15 Bulk/Hydrant 1,396,252 Jet A AST Pipeline Tank Truck
8232 18 Bulk 8999 Diesel 1
& 2 SCAT Tank Truck
8233 19 Bulk 8995 Diesel 1
& 2 SCAT Tank Truck
8234 17 Bulk 9020 GUR SCAT Tank Truck
(7) Cryogenic Storage Tanks
Facility Number Tank
Number
Safe Fill
(gallons)
Product
Grade
(8) EQUIPMENT (EAID)
The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks.
Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are listed on the Custodian Authorization/Custodian
Receipt Listing (CA/CRL).
NOMENCLATURE MANUFACTURER NSN PART/MODEL SERIAL NO PRICE LOCATION
(9) EQUIPMENT (NON-EAID)
The following on-site installation equipment may be used by the Contractor in performance of the PWS tasks.
Maintenance of all equipment on this list is the responsibility of the Contractor. This list of equipment is subject to change as replacement equipment is received. These items are NOT listed on the CA/CRL.
NOMENCLATURE MANUFACTURER NSN PART/MODEL
SERIAL
NO
PRICE LOCATION
(10) INFORMATION TECHNOLOGY EQUIPMENT (ITEC)
The following on-site installation equipment may be used for the Contractor in performance of PWS tasks.
The following ITEC is identified on the local installations Communications Squadron Asset Inventory
Management (AIM) list under Account ####. Monitors are not tracked in AIM but are accountable.
Desktop PC Hewlett Packard N/A HP705G1 2UA5411Z70 $453 Bldg. 618/rm208
Desktop PC Hewlett Packard N/A HP705G1 2UA5411Z6Z $453 Bldg 618/rm 208
Desktop PC Hewlett Packard N/A HP705G1 2UA5411Z7C $453 Area C/ Bldg 1707
Desktop PC Hewlett Packard N/A HP6005 2UA5411Z91 $447 Area D/ Bldg 8215
LaserJet Printer Hewlett Packard N/A HP P3015 JPBCC9Q2Q4 $560 Bldg 618 / Rm 208
(11) ITEC (DLA-ENERGY)
The following on-site Defense Logistics Agency-Energy (DLA-Energy) ITEC may be used by the Contractor in performance of PWS tasks.
(12) AUTOMATED INFORMATION TECHNOLOGY (AIT) EQUIPMENT
The following on-site Defense Logistics Agency-Energy (DLA-Energy) AIT may be used by the Contractor is performance of PWS tasks.
SYSTEM DESCRIPTION SERIAL NO MODEL NO MFR LOCATION
Scully Intellitrol 6F3EB1 Intellitrol Scully Area D FS
Scully Intellitrol 727365 Intellitrol Scully Area D
ATG RTU 2081 8130 BARTON Area C
ATG Probe 766015493 UAFN766D ENRAF Area C
ATG TSI 977032740 U*B977SNF ENRAF Area C
ATG Servo 854053465 UIAC854M21F2*CDZ ENRAF Area C
ATG VITO 762028090 UT**762*ANF ENRAF Area C
ATG Probe 766015494 UAFN766D ENRAF Area C
ATG TSI 977032741 U*B977SNF ENRAF Area C
ATG Servo 854053466 UIAC854M21F2*CDZ ENRAF Area C
ATG VITO 762028091 UT**762*ANF ENRAF Area C
ATG RTU 1693 8130 BARTON Area D
ATG Probe 766015495 UAFN766D ENRAF Area D
ATG TSI 977032742 U*B977SNF ENRAF Area D
ATG Servo 854053467 UIAC854M21F2*CDZ ENRAF Area D
ATG VITO 762028092 UT**762*ANF ENRAF Area D
ATG Probe 766015496 UAFN766D ENRAF Area D
ATG TSI 977032743 U*B977SNF ENRAF Area D
ATG Servo 854053468 UIAC854M21F2*CDZ ENRAF Area D
ATG VITO 762028093 UT**762*ANF ENRAF Area D
ATG TLS M072240105001 350 Veeder Root Area D
ATG Probe 675751 Magnetostrictive Veeder Root Area D
ATG Probe 675752 Magnetostrictive Veeder Root Area D
ATG Probe 675753 Magnetostrictive Veeder Root Area D
(13) LAND MOBILE RADIOS (LMR)
The following on-site installation LMRs may be used by the Contractor in performance of PWS tasks. The LMRs are identified on the local installations Communications Squadron Asset Inventory Management (AIM) list under Account
DESCRIPTION PART NO SERIAL NO LOC
(14) VEHICLES
The following on-site installation vehicles may be used by the Contractor for performance of PWS tasks. This listing is subject to change as vehicles are replaced and/or added to/deleted from the fleet.
TYPE REGISTRATION NO NSN
FUEL GRADE
DISPENSED
(15) Base Specific Additional Publications/Forms (addition to Appendix C)
PUBLICATION TITLE
File details come from the government source that posted it.