Base_Specific_Q&As_AFGOCO_Northwest_Region-Grand_Forks_AFB.pdf

PDF 136 KB Posted

Attached to
Operation and Maintenance of Fuel Facilities - SPE603-18-R-0507
Solicitation number
SPE603-18-R-0507
Issued by

About this file

Questions & Answers Grand Forks AFB

View the file

Other files

File Type Posted
Hill_AFB_WD_2015-5483_Rev_5.pdf PDF
Mtn_Home_WD_2015-5513_Rev_5.pdf PDF
Ellsworth_AFB_WD_2015-5367_Rev_8.pdf PDF
Minot_AFB_WD_2015-5383_Rev_5.pdf PDF
Grand_Forks_AFB_WD_2015-4973_Rev_8.pdf PDF
Nellis_AFB_WD_2015-5593_Rev_8.pdf PDF
SF30_SPE60318R05070004.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0507_JUL_24,_2018.pdf PDF
Q&A_Attachment_IV_Grand_Forks_AFB_Appendix_AF_01_May_18.pdf PDF
Base_Specific_Q&As_AFGOCO_Northwest_Region-Minot_AFB.pdf PDF
Base_Specific_Q&As_AFGOCO_Northwest_Region-HIll_AFB.pdf PDF
Q&A_Attachment_I_General_Contracting_Q&As_-_AFGOCO_Northwest_Region.pdf PDF
Q&A_Attachment_III_Ellsworth_AFB_Appendix_AF_01_May_18.pdf PDF
AFGOCO_Consolidated_PWS_(dated_12_Feb_2018).pdf PDF
Q&A_Attachment_IX_Mountain_Home_AFB_Appendix_AF__01_May_18.pdf PDF
Minot_AFB_-_MAF_413_Runs_(FY_16).xlsx XLSX spreadsheet
Q&A_Attachment_X_Nellis_AFB_Appendix_AF_01_May_18.pdf PDF
Q&A_Attachment_V_Hill_AFB_Appendix_AF__01_May_18.pdf PDF
Base_Specific_Q&As_AFGOCO_Northwest_Region-Nellis_AFB.pdf PDF
Q&A_Attachment_II_General_Technical_Q&As_-_AFGOCO_Northwest_Region.pdf PDF
Base_Specific_Q&As_AFGOCO_Northwest_Region-Mountain_Home_AFB.pdf PDF
Minot_AFB_-_MAF_413_Runs_(FY_17).xlsx XLSX spreadsheet
Final_Solicitation_SPE603-18-R-0507_5MAY2018.pdf PDF
Q&A_Attachment_VI_Minot_AFB_Appendix_AF_01_May_18.pdf PDF
SF30_SPE60318R05070003.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AFGOCO_Northwest.pdf PDF
Base_Specific_Q&As_AFGOCO_Northwest_Region-Ellsworth_AFB.pdf PDF
Final_Solicitation_SPE603-18-R-0507_25APR2018.pdf PDF
Amendment_0002.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AFGOCO_Northwest.pdf PDF
Mountain_Home_AFB_PWS_Appendix.pdf PDF
AF_GOCO_Preproposal_Conference_Presentation.pdf PDF
SF1449_SPE60318R0507.pdf PDF
Minot_AFB_PWS_Appendix.pdf PDF
AF_GOCO_Northwest_Region_Site_visit_2017_Attendance_sheets.pdf PDF
SF30_SPE60318R05070001.pdf PDF
Nellis_AFB_PWS_Appendix.pdf PDF
Grand_Forks_AFB_PWS_Appendix.pdf PDF
Hill_AFB_PWS_Appendix.pdf PDF
AF_GOCO_Pre-Proposal_Conference_Attendance_Sheet.pdf PDF
Ellsworth_AFB_PWS_Appendix.pdf PDF
Attachment_1_-_AF_GOCO_Consolidated_PWS_(dated_12_Feb_2018).pdf PDF
ATTACHMENT_III_-_Past_Performance_Questionaire_-_AFGOCO_Northwest.pdf PDF
GF_AFB_WD_2015-4973.pdf PDF
Nellis_AFB_Appendix.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AFGOCO_Northwest.pdf PDF
Hill_AFB_Appendix.pdf PDF
Grand_Forks_AFB_Appendix.pdf PDF
Mtn_Home_AFB_WD_2015-5513.pdf PDF
ATTACHMENT_IV_-_JOINT_VENTURE_CONSENT_FORM.pdf PDF
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION INFORMATION. SEE FAR 2.101 AND 3.104 1 of 3

SOLICITATION SPE603-18-R-0507 – AF GOCO NORTHWEST REGION

BASE SPECIFIC QUESTIONS: GRAND FORKS AFB, ND

1. Reference PWS Appendix AF – Grand Forks: The workload information states there is <1 transfer performed on average per week. What is the duration of a transfer?

Answer: Refer to PWS Appendix AF para II.A. (3).

2. Reference PWS Appendix AF – Grand Forks: The workload information states there are confined spaces. Do Contractor personnel have to enter any of the confined spaces to perform work tasks?

Answer: Refer to PWS paragraph C-5.3.2.1, Appendix C.I.5, and AF para II.A. (3).

3. Reference PWS Appendix AF – Grand Forks: The workload information states that quarterly, semi-annual and annual maintenance on GFP is provided by DLA Energy.

Please confirm the Contractor is only responsible for operator level inspection.

Answer: Refer to PWS paragraph C-5.3 and subparagraphs and Appendix AF para I.

4. Reference PWS Appendix AF – Grand Forks: The workload information states that quarterly, semi-annual and annual maintenance on GFP is provided by DLA Energy.

Please confirm the Contractor is only responsible for coordination with CE through the COR for maintenance of GFP.

Answer: Refer to PWS para C-5.3 and subparagraphs and Appendix AF para I.

5. Reference PWS Appendix AF – Grand Forks: The base specific requirements provide a listing of Government-furnished facilities to be used by the Contractor.

Are initial and replacement spill kits to be provided by the Government?

Answer: Refer to PWS para C-5.8.2 and Appendix F.

6. Reference PWS Appendix AF – Grand Forks: There is no listing of furniture included for the Government furnished facilities. Does the Government provide furniture for the Contractor’s use?

Answer: Refer to PWS Appendix AF para II.A. (9).

SOURCE SELECTION INFORMATION. SEE FAR 2.101 AND 3.104 2 of 3

7. In this section it says fuel support is provided to CAVALIER AFS, which as approximately 80 miles from Ellsworth AFB. Is the contractor responsible for any support to/at Cavalier AFS? If so, please specify what support is required, all workload data, frequency, type/volume of fuel, etc…

Answer: Refer to PWS Appendix AF para II.A. (4).

8. Please confirm the fuel quantities handled and shown are correct – they appear to be inaccurate:

Average monthly receipts shows: 41,558 (=498,696 per year)

Average Annual Jet Issued: 425,090

Average Transfers WEEKLY: 45,090 (=2,344,680 per year)

9. Petroleum Storage Tanks:

What are the contractor’s responsibilities with the 2-De-Icer Tanks? How often are they filled? Does the contractor fill the Deicers?

Are the number of ASTs and tank quantities correct? The PWS chart shows 6-

ASTs, but the base map shows 10-ASTs?

Answer: Refer to PWS Appendix AF para II.A. (4), (5) and (6).

10. Referring to the TS collateral duty restrictions listed in PWS Appendix D, would the

Government consider removing this restriction for Grand Forks? It is highly unlikely the administrative and management duties for small workforces would require 8-hrs per day, 5-days per week, and segregation of duties is not a factor since the contractor does not process accounting paperwork.

Answer: Refer to PWS Appendix D.

11. Please confirm if the Contractor performs return to bulk operations (i.e. R-11 or bowsers).

12. Does the Fuels Management Flight designate the number of fuels personnel who must be present when off-loading multiple tank trucks simultaneously? And if so, what does it stipulate?

Answer: Refer to PWS Appendix D and Appendix AF.

SOURCE SELECTION INFORMATION. SEE FAR 2.101 AND 3.104 3 of 3

13. Please confirm if the fillstands (JP-8, GUR and DS-1) are equipped with an operational deadman control and overfill protection device (Scully System).

14. Please confirm if there any bowsers provided by the Government for Contractor use.

Answer: Refer to PWS Appendix AF para II.A. (8).

15. Appendix AF (3) Workload Information, does not reflect an emergency generator for

POL facilities within the Contractor AOR. Please provide procedures, if any, for requesting back-up generator support during power outages.

16. Appendix AF (5) Facilities shows a De-icer/Anti-icer Facility. Please define

Contractor involvement, if any, with deicing/anti-icing fluids.

17. Please confirm whether or not there are any low point drains within the system that the Contractor is responsible for maintaining. Is the Contractor required to drive on the airfield to access pits, low points etc.?

18. Please clarify the average number of tank trucks per month.

Appendix AF, (3) Workload Information, shows only 5 per month for a total of

41,558 gallons; however, transfer of JP-8 is 45,090 gallons per week.